Total Units
466
3 unit types
Carpet Area
6,11,933 ft²
56,850.45 m² · carpet only, excludes balcony
Blocks & Floors
8
188 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 1,313 ft² (122.00 m²)Balconies 1,690Parking per unit 0.0026 of 432 rows list no units (23 floors are empty), so they add nothing to these totals
All blocks
Showing 50 of 432 rows · 7 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit | Balconies | Balcony Areatotal |
|---|---|---|---|---|---|---|
| Tower A | BSMNT | OTHER | — | — | — | — |
| Tower A | BSMNT2 | OTHER | — | — | — | — |
| Tower A | GF | 3 BHK | 1 | 1,180 ft²109.60 m² | 3 | 384 ft²35.69 m² |
| Tower A | GF | 3 BHK | 1 | 1,048 ft²97.35 m² | 3 | 283 ft²26.26 m² |
| Tower A | GF | 4 BHK | 1 | 1,318 ft²122.40 m² | 6 | 287 ft²26.70 m² |
| Tower A | GF | 4 BHK | 1 | 1,422 ft²132.14 m² | 3 | 422 ft²39.17 m² |
| Tower A | 1 | 3 BHK | 1 | 1,180 ft²109.60 m² | 3 | 384 ft²35.69 m² |
| Tower A | 1 | 3 BHK | 1 | 1,048 ft²97.35 m² | 3 | 283 ft²26.26 m² |
| Tower A | 1 | 4 BHK | 1 | 1,318 ft²122.40 m² | 6 | 287 ft²26.70 m² |
| Tower A | 1 | 4 BHK | 1 | 1,422 ft²132.14 m² | 3 | 422 ft²39.17 m² |
| Tower A | 2 | 3 BHK | 1 | 1,180 ft²109.60 m² | 3 | 384 ft²35.69 m² |
| Tower A | 2 | 3 BHK | 1 | 1,048 ft²97.35 m² | 3 | 283 ft²26.26 m² |
| Tower A | 2 | 4 BHK | 1 | 1,318 ft²122.40 m² | 6 | 287 ft²26.70 m² |
| Tower A | 2 | 4 BHK | 1 | 1,422 ft²132.14 m² | 3 | 422 ft²39.17 m² |
| Tower A | 3 | 3 BHK | 1 | 1,180 ft²109.60 m² | 3 | 384 ft²35.69 m² |
| Tower A | 3 | 3 BHK | 1 | 1,048 ft²97.35 m² | 3 | 283 ft²26.26 m² |
| Tower A | 3 | 4 BHK | 1 | 1,318 ft²122.40 m² | 6 | 287 ft²26.70 m² |
| Tower A | 3 | 4 BHK | 1 | 1,422 ft²132.14 m² | 3 | 422 ft²39.17 m² |
| Tower A | 4 | 3 BHK | 1 | 1,180 ft²109.60 m² | 3 | 384 ft²35.69 m² |
| Tower A | 4 | 3 BHK | 1 | 1,048 ft²97.35 m² | 3 | 283 ft²26.26 m² |
| Tower A | 4 | 4 BHK | 1 | 1,318 ft²122.40 m² | 6 | 287 ft²26.70 m² |
| Tower A | 4 | 4 BHK | 1 | 1,422 ft²132.14 m² | 3 | 422 ft²39.17 m² |
| Tower A | 5 | 3 BHK | 1 | 1,180 ft²109.60 m² | 3 | 384 ft²35.69 m² |
| Tower A | 5 | 4 BHK | 1 | 1,318 ft²122.40 m² | 6 | 287 ft²26.70 m² |
| Tower A | 5 | 4 BHK | 1 | 1,422 ft²132.14 m² | 3 | 422 ft²39.17 m² |
| Tower A | 5 | 3 BHK | 1 | 1,048 ft²97.35 m² | 3 | 283 ft²26.26 m² |
| Tower A | 6 | 3 BHK | 1 | 1,180 ft²109.60 m² | 3 | 384 ft²35.69 m² |
| Tower A | 6 | 3 BHK | 1 | 1,048 ft²97.35 m² | 3 | 283 ft²26.26 m² |
| Tower A | 6 | 4 BHK | 1 | 1,318 ft²122.40 m² | 6 | 287 ft²26.70 m² |
| Tower A | 6 | 4 BHK | 1 | 1,422 ft²132.14 m² | 3 | 422 ft²39.17 m² |
| Tower A | 7 | 3 BHK | 1 | 1,180 ft²109.60 m² | 3 | 384 ft²35.69 m² |
| Tower A | 7 | 3 BHK | 1 | 1,048 ft²97.35 m² | 1 | 283 ft²26.26 m² |
| Tower A | 7 | 4 BHK | 1 | 1,318 ft²122.40 m² | 6 | 287 ft²26.70 m² |
| Tower A | 7 | 4 BHK | 1 | 1,422 ft²132.14 m² | 3 | 422 ft²39.17 m² |
| Tower A | 8 | 3 BHK | 1 | 1,180 ft²109.60 m² | 3 | 384 ft²35.69 m² |
| Tower A | 8 | 3 BHK | 1 | 1,048 ft²97.35 m² | 3 | 283 ft²26.26 m² |
| Tower A | 8 | 4 BHK | 1 | 1,318 ft²122.40 m² | 6 | 287 ft²26.70 m² |
| Tower A | 8 | 4 BHK | 1 | 1,422 ft²132.14 m² | 3 | 422 ft²39.17 m² |
| Tower A | 9 | 3 BHK | 1 | 1,180 ft²109.60 m² | 3 | 384 ft²35.69 m² |
| Tower A | 9 | 3 BHK | 1 | 1,048 ft²97.35 m² | 3 | 283 ft²26.26 m² |
| Tower A | 9 | 4 BHK | 1 | 1,318 ft²122.40 m² | 6 | 287 ft²26.70 m² |
| Tower A | 9 | 4 BHK | 1 | 1,422 ft²132.14 m² | 3 | 422 ft²39.17 m² |
| Tower A | 10 | 3 BHK | 1 | 1,180 ft²109.60 m² | 3 | 384 ft²35.69 m² |
| Tower A | 10 | 3 BHK | 1 | 1,048 ft²97.35 m² | 3 | 283 ft²26.26 m² |
| Tower A | 10 | 4 BHK | 1 | 1,318 ft²122.40 m² | 6 | 287 ft²26.70 m² |
| Tower A | 10 | 4 BHK | 1 | 1,422 ft²132.14 m² | 3 | 422 ft²39.17 m² |
| Tower A | 11 | 3 BHK | 1 | 1,180 ft²109.60 m² | 3 | 384 ft²35.69 m² |
| Tower A | 11 | 3 BHK | 1 | 1,048 ft²97.35 m² | 3 | 283 ft²26.26 m² |
| Tower A | 11 | 4 BHK | 1 | 1,318 ft²122.40 m² | 6 | 287 ft²26.70 m² |
| Tower A | 11 | 4 BHK | 1 | 1,422 ft²132.14 m² | 3 | 422 ft²39.17 m² |
Total Plot Area
7.32 acres
29,625.00 m² · plot area
Total plot area of 29625 Sqm. located in Plot no. 08/GH-01, Sector-8, Siddharth Vihar, Ghaziabad
Suitable boundary shall be provided
Interlocking Pavers/Wbm ROAD/Tirimix
Interlocking Pavers
One Under Ground Tank shll be provided
Underground system using uPVC /NP2(SN-4) pipes.
Underground system using uPVC/NP2 (SN-4) pipes.
Landscaping area is provided asper local building bye-laws
80 Nos. trees are to be planted out of that 50% will be evergreen tree.
Electricity Transformers shall be used along with necessary switch-gear for distributing electricity at LT voltage
Community space shall be provided
STP shall be provided. Treated water shall be used for flushing, irrigation, carwash, pathways cleaning and excess sewage shall be discharged in the municipal sewer
Manual collection shall be provided in the project
Rain water harvesting facilities shall be provided
Solar panels shall be provided on terrace for renewable energy.
Fire tender path shall be provided as per NBC. Fire fighting system shall be provided.
STP shall be provided
Staircases shall be provided in Basement & all the Towers for fire/ emergency exit as per norms.
N/A
Eutopia Phase-1 is located in Ghaziabad.
Yes. Eutopia Phase-1 is registered under UPRERAPRJ351699 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Eutopia Phase-1 is 30 August 2026.
Eutopia Phase-1 is developed by TANDT REALTECH PRIVATE LIMITEDNFS INFRADEVELOPERS LLP.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.