27-10-2025
Launch Date
NEW
Type
2033-09-30
Completion Date

Overview

Launch Date

27-10-2025

Completion Date

2033-09-30

Configurations

3 BHK, Penthouse Duplex, 4 BHK

Sizes

3083 - 7536 sq.ft.

Project Size

5 Buildings - 1096 units

Total Floors

46

Launch Price

21350 /sq.ft

RERA ID

RERA-GRG-2093-2025

Basic Details

Project NameESTATE 361
Project IDRERA-GRG-2093-2025
Project TypeNEW
Applicant TypeCompany
Submission Date27-10-2025 07:47:49 PM
Builder NameMAX ESTATES GURGAON TWO LIMITED
CINU68100DL2024PLC424818
PANXXXX441M
Emailrera@maxestates.in
Websitehttps://maxestates.in/
Phone (Mobile)9810411360
Phone (Landline)01204743222
Registered AddressMAX HOUSE, KH NO 335/2, 355/18,337, AND 1511/339, OKHLA INDUSTRIAL ESTATE, NEW DELHI, DELHI, INDIA, 110020
Project AddressVILLAGE-HARSARU, SECTOR 36
DistrictGURUGRAM
TehsilHARSARU ST

Virtual Tour

Premium
Loading

Location

Max Estate 361 & 360 Masterplan Superimposed
Max Estate 361 & 360 Masterplan Superimposed

Drone Shots

Premium
Loading
Max Estate 361 Drone View (Closeup)

Layout

Loading
Max Estate 361 Masterplan
Max Estate 361 Masterplan

Payment Plans

Loading
Max Estate 361 Payment Plan
Max Estate 361 Payment Plan

Floor Plan

Loading
Configuration
Super Area
Unit Details
Carpet Area
1742 sq.ft
Built Up Area
N/A
Carpet Efficiency
57%
Built Up Efficiency
N/A
Parkings
2

Brochures

Loading

Walkthrough

Loading

Bank Details

Bank NameIDFC FIRST BANK LTD & BARAKHAMBA ROAD BRANCH, LOWER GROUND FLOOR,BIRLA TOWERS, 25 BARAKHAMBA ROAD, NEW DELHI.
Account Number10244466605
IFSC CodeIDFB0020101
MICR Code110751001
Branch Code20101

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Nitin Kumar, Sector-5, Rajendra Nagar, Sahibabad, Ghaziabad, Uttar Pradesh, PIN-201005
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)UPLOADED

Development Details

Land Area14.2944 (Acre)
Proposed FAR3.03
Permissible FAR3.03
Total Licensed Land18.2375 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS22258.24
CONSTRUCTION OF ROADS2723.68
PAVEMENTS8171.03
PARKS AND PLAYGROUNDS7683.11
GREEN BELTS5261.97
VEHICLE PARKINGS500
ELECTRICITY SUB-STATION943.08
CLUB HOUSE6826.85
SEWAGE AND SOLID WASTE TREATMENT FACILITY1730.73
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER809.60
UNDERGROUND939.09
Total57847.38

Cost Details

Land Cost258118 Lakhs
Other Cost103640 Lakhs
Estimated Project Cost586185 Lakhs
Estimated Infrastructure Cost46607 Lakhs
Estimated Apartment Construction Cost177820 Lakhs

Documents

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 27-10-2025

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 27-10-2025

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 27-10-2025

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 27-10-2025

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 27-10-2025

APPROVED PHASING

Uploaded on: 20-11-2025

ESTATE361_ALLOTMENT REVISED, APPLICATION FORM REVISED, ATS REVISED, CONVEYANCE DEED REVISED, PAYMENT RECEIPT FORMAT

Uploaded on: 20-11-2025

DEMARCATION PLAN

Uploaded on: 20-11-2025

EWS BLOCK-47

Uploaded on: 20-11-2025

GC- 02D (A1)

Uploaded on: 20-11-2025

ESTATE361_MOA_MEGTL

Uploaded on: 20-11-2025

JDA 1 ADDENDUM

Uploaded on: 20-11-2025

REGISTERED GPA 1

Uploaded on: 20-11-2025

CA CERTIFICATE_INVENTORY DETAILS

Uploaded on: 20-11-2025

MEL SIGNATURE TOWER B2 & B4-23

Uploaded on: 20-11-2025

LOI

Uploaded on: 20-11-2025

MEL SIGNATURE TOWER B2 & B4-16

Uploaded on: 20-11-2025

ASL SIGNATURE TOWER B1 & B3-19

Uploaded on: 20-11-2025

MILLENNIAL TOWER A-04A

Uploaded on: 20-11-2025

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 20-11-2025

ASL SIGNATURE TOWER B1 & B3-34

Uploaded on: 20-11-2025

BUILDING PLAN-02B (A1)

Uploaded on: 20-11-2025

BASEMENT PLAN-30B

Uploaded on: 20-11-2025

BROCHURE

Uploaded on: 20-11-2025

JDA 3 ADDENDUM

Uploaded on: 20-11-2025

ZONING PLAN

Uploaded on: 20-11-2025

MEL SIGNATURE TOWER B2 & B4-39

Uploaded on: 20-11-2025

STP WATER APPROVAL

Uploaded on: 20-11-2025

LC-IV AND LC-IVA

Uploaded on: 20-11-2025

ASL SIGNATURE TOWER B1 & B3-35

Uploaded on: 20-11-2025

ESTATE 361 - PRINT AD RERA

Uploaded on: 20-11-2025

ARAVALI NOC

Uploaded on: 20-11-2025

CONSTRUCTION WATER NOC

Uploaded on: 20-11-2025

GC- 02C (A1)

Uploaded on: 20-11-2025

MEL SIGNATURE TOWER B2 & B4-15

Uploaded on: 20-11-2025

JDA 2 (REGISTERED)

Uploaded on: 20-11-2025

ASL SIGNATURE TOWER B1 & B3-42

Uploaded on: 20-11-2025

MILLENNIAL TOWER A-10

Uploaded on: 20-11-2025

FOREST NOC

Uploaded on: 20-11-2025

JDA 3 (REGISTERED)

Uploaded on: 20-11-2025

MILLENNIAL TOWER A-31

Uploaded on: 20-11-2025

STORM WATER ASSURANCE

Uploaded on: 20-11-2025

ASL SIGNATURE TOWER B1 & B3-43

Uploaded on: 20-11-2025

POWER ASSURANCE

Uploaded on: 20-11-2025

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 20-11-2025

CA CERT_PROMOTER NET WORTH

Uploaded on: 20-11-2025

ASL SIGNATURE TOWER B1 & B3-20

Uploaded on: 20-11-2025

BASEMENT PLAN-30A

Uploaded on: 20-11-2025

MEL SIGNATURE TOWER B2 & B4-37

Uploaded on: 20-11-2025

ESTATE 361_ CA CERTIFICATE EXPENDITURE INCURRED

Uploaded on: 20-11-2025

BASEMENT PLAN-29B

Uploaded on: 20-11-2025

MILLENNIAL_TOWER A-03, MILLENNIAL_TOWER A-04, MILLENNIAL_TOWER A-05, MILLENNIAL_TOWER A-06

Uploaded on: 20-11-2025

NON ENCUMBRANCE CERTIFICATE

Uploaded on: 20-11-2025

MILLENNIAL TOWER A-07

Uploaded on: 20-11-2025

BR-III

Uploaded on: 20-11-2025

ASL SIGNATURE TOWER B1 & B3-13

Uploaded on: 20-11-2025

EWS BLOCK-48

Uploaded on: 20-11-2025

MILLENNIAL TOWER A-08

Uploaded on: 20-11-2025

ASL SIGNATURE TOWER B1 & B3-14

Uploaded on: 20-11-2025

BASEMENT PLAN-29

Uploaded on: 20-11-2025

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 20-11-2025

EWS BLOCK-26

Uploaded on: 20-11-2025

MEL SIGNATURE TOWER B2 & B4-21

Uploaded on: 20-11-2025

MILLENNIAL TOWER A-32

Uploaded on: 20-11-2025

REVISED AKS SHAJRA , REVISED MUTATION, REVISED NAKAL JAMABANDI, REVISED TSR

Uploaded on: 20-11-2025

ASL SIGNATURE TOWER B1 & B3-18

Uploaded on: 20-11-2025

MEL SIGNATURE TOWER B2 & B4-24

Uploaded on: 20-11-2025

MEL SIGNATURE TOWER B2 & B4-40

Uploaded on: 20-11-2025

ASL SIGNATURE TOWER B1 & B3-41

Uploaded on: 20-11-2025

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 20-11-2025

BASEMENT PLAN-30

Uploaded on: 20-11-2025

EWS BLOCK-49

Uploaded on: 20-11-2025

MILLENNIAL TOWER A-11

Uploaded on: 20-11-2025

FRESH WATER ASSURANCE

Uploaded on: 20-11-2025

CASH FLOW SUMMARY

Uploaded on: 20-11-2025

MEL SIGNATURE TOWER B2 & B4-44

Uploaded on: 20-11-2025

MILLENNIAL TOWER A-33

Uploaded on: 20-11-2025

REGISTERED GPA 2

Uploaded on: 20-11-2025

ASL SIGNATURE TOWER B1 & B3-36

Uploaded on: 20-11-2025

SEWERAGE CONNECTION ASSURANCE

Uploaded on: 20-11-2025

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 20-11-2025

REGISTERED GPA 3

Uploaded on: 20-11-2025

ASL SIGNATURE TOWER B1 & B3-12

Uploaded on: 20-11-2025

SPORTS BLOCK-50

Uploaded on: 20-11-2025

GC- 02B (A1)

Uploaded on: 20-11-2025

SIGNATURE CLUB-28, SIGNATURE CLUB-51

Uploaded on: 20-11-2025

AAI NOC

Uploaded on: 20-11-2025

BASEMENT PLAN-29A

Uploaded on: 20-11-2025

MEL SIGNATURE TOWER B2 & B4-45

Uploaded on: 20-11-2025

ROAD ACCESS PERMISSION

Uploaded on: 20-11-2025

JDA 2 ADDENDUM

Uploaded on: 20-11-2025

EWS BLOCK-25

Uploaded on: 20-11-2025

MEL SIGNATURE TOWER B2 & B4-17

Uploaded on: 20-11-2025

MEL SIGNATURE TOWER B2 & B4-38

Uploaded on: 20-11-2025

ESTATE361_AOA_MEGTL

Uploaded on: 20-11-2025

JDA 1 (REGISTERED)

Uploaded on: 20-11-2025

MILLENNIAL TOWER A-09

Uploaded on: 20-11-2025

MEL SIGNATURE TOWER B2 & B4-22

Uploaded on: 20-11-2025

MEL SIGNATURE TOWER B2 & B4-46

Uploaded on: 20-11-2025

SPORTS BLOCK-27

Uploaded on: 20-11-2025

Statutory Approvals

LOIDate: 18-12-2024Status: ALREADY BEEN OBTAINED
LICENCE NO. 50 OF 2025Date: 09-04-2025Status: ALREADY BEEN OBTAINED
ASSURANCE SEWERAGEDate: 19-06-2025Status: ALREADY BEEN OBTAINED
ASSURANCE STORM WATERDate: 19-06-2025Status: ALREADY BEEN OBTAINED
ASSURANCE DRINKING WATERDate: 18-06-2025Status: ALREADY BEEN OBTAINED
ASSURANCE ELECTRICAL LOADDate: 30-06-2025Status: ALREADY BEEN OBTAINED
AAI NOCDate: 29-05-2025Status: ALREADY BEEN OBTAINED
ARAWALI NOCDate: 08-08-2025Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 01-07-2025Status: ALREADY BEEN OBTAINED
BUILDING PLAN APPROVAL (BR III)Date: 16-10-2025Status: ALREADY BEEN OBTAINED
LC-IVDate: 09-04-2025Status: ALREADY BEEN OBTAINED
ROAD ACCESS PERMISSIONDate: 26-02-2025Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: No
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERAS PER PROJECT REPORT
COVERED PARKINGAS PER PROJECT REPORT
STPAS PER PROJECT REPORT
UNDERGROUND TANKAS PER PROJECT REPORT
RAIN WATER HARVESTINGAS PER PROJECT REPORT
ELECTRIC SUBSTATIONAS PER PROJECT REPORT
ELECTRIFICATION COST TO PROJECTAS PER PROJECT REPORT

NOC

ROADSProvider: CONNECTEDApproval Status: Approved
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

SANJEEV AILAWADI
Name
SANJEEV AILAWADI
PAN
XXXX750R
Email
rera@maxestates.in
Mobile
9810411360
Landline
01204743222
Address
House No. M-1 Second Floor Greater Kailash Part 1 South Delhi Delhi - 110048

Managing Director/CEO

ANSHUL GAURAV
Name
ANSHUL GAURAV
PAN
XXXX046N
Email
rera@maxestates.in
Mobile
9810411360
Landline
01204743222
Address
D-252Anand Vihar East Delhi Delhi 110092

Directors

VENKATRAMAN KRISHNAN
Name
VENKATRAMAN KRISHNAN
PAN
XXXX417F
Email
rera@maxestates.in
Mobile
9810411360
Landline
01204743222
Address
A 38 Behand Sahibabad Police Station Lajpat Nagar Ghaziabad Uttar Pradesh
ANSHUL GAURAV
Name
ANSHUL GAURAV
PAN
XXXX046N
Email
rera@maxestates.in
Mobile
9810411360
Landline
01204743222
Address
D-252Anand Vihar East Delhi Delhi 110092
ANIRUDH BALAKRISHNAN
Name
ANIRUDH BALAKRISHNAN
PAN
XXXX785J
Email
rera@maxestates.in
Mobile
9810411360
Landline
01204743222
Address
Casagrand Belissimo C107 CPWD Quarters Alandur Chennai Tamil Nadu PIN - 600016

Contact Details

Project ContactEmail: rera@maxestates.inMobile: 9810411360Landline: 1204743222
Project Contact PersonName: ASHISH TICKUEmail: rera@maxestates.inMobile: 9810411360Landline: 1204743222

Land Details

Land Area14.2944 (Acre)
Proposed FAR3.03
Permissible FAR3.03
Total Licensed Land18.2375 (Acre)

Land Usage

Land Cost258118 Lakhs
Other Cost103640 Lakhs
Estimated Project Cost586185 Lakhs
Estimated Infrastructure Cost46607 Lakhs
Estimated Apartment Construction Cost177820 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
STP0
Other0
School0
Street Light0
Shopping area0
Covered Parking0
Roads & Pavements0
Water Supply System0
ELECTRIFICATION COST0
Rainwater Harvesting0
Storm Water Drainage0
Parks and Playgrounds0
Electrical Sub Station0
Underground Water Tank0
Renewable Energy System0
Electricity Supply System0
Security and fire fighting0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Covered Parking0000
Electric Substation0000
Electricity Supply System0000
Electrification Cost up to Project Site0000
Other0000
Parks and Playgrounds0000
Rain Water Harvesting0000
Renewable Energy System0000
Roads & Pavements0000
STP0000
School0000
Security and Firefighting Services0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Light0000
Underground Tank----
Underground Water Tank0000
Water Supply System0000
2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Covered Parking0000
Electric Substation0000
Electricity Supply System0000
Electrification Cost up to Project Site0000
Other0000
Parks and Playgrounds0000
Rain Water Harvesting0000
Renewable Energy System0000
Roads & Pavements0000
STP0000
School0000
Security and Firefighting Services0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Light0000
Underground Tank---0
Underground Water Tank000-
Water Supply System0000
2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Covered Parking004042022
Electric Substation0000
Electricity Supply System0000
Electrification Cost up to Project Site0000
Other0000
Parks and Playgrounds0000
Rain Water Harvesting0000
Renewable Energy System0000
Roads & Pavements0000
STP0000
School0000
Security and Firefighting Services0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Light0000
Underground Tank----
Underground Water Tank0000
Water Supply System0000
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Covered Parking2022202222242224
Electric Substation0000
Electricity Supply System0000
Electrification Cost up to Project Site0000
Other0000
Parks and Playgrounds0000
Rain Water Harvesting0000
Renewable Energy System0000
Roads & Pavements0000
STP0000
School0000
Security and Firefighting Services0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Light0000
Underground Tank----
Underground Water Tank0000
Water Supply System0000
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres56989898
Covered Parking2022202222242224
Electric Substation0000
Electricity Supply System0000
Electrification Cost up to Project Site0000
Other0000
Parks and Playgrounds0000
Rain Water Harvesting0000
Renewable Energy System0000
Roads & Pavements00082
STP0000
School0000
Security and Firefighting Services0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Light0000
Underground Tank----
Underground Water Tank00105161
Water Supply System00109167
2030 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres84989898
Covered Parking809000
Electric Substation0213838
Electricity Supply System0000
Electrification Cost up to Project Site0000
Other0000
Parks and Playgrounds0000
Rain Water Harvesting0000
Renewable Energy System0000
Roads & Pavements191191219191
STP0000
School0000
Security and Firefighting Services0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Light0000
Underground Tank----
Underground Water Tank62000
Water Supply System65000
2031 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres84989898
Covered Parking0000
Electric Substation34343838
Electricity Supply System0302328328
Electrification Cost up to Project Site0000
Other0000
Parks and Playgrounds0000
Rain Water Harvesting0000
Renewable Energy System0000
Roads & Pavements191191219191
STP0000
School0000
Security and Firefighting Services0302328328
Sewerage treatment & garbage disposal001313
Shopping area0000
Storm Water Drainage001717
Street Light0000
Underground Tank----
Underground Water Tank0000
Water Supply System0000
2032 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres98849814
Covered Parking0000
Electric Substation34383838
Electricity Supply System302302328328
Electrification Cost up to Project Site00440458
Other0000
Parks and Playgrounds00178212
Rain Water Harvesting4548480
Renewable Energy System002742
Roads & Pavements191191191219
STP0277780
School0000
Security and Firefighting Services302302328328
Sewerage treatment & garbage disposal13131313
Shopping area0000
Storm Water Drainage17171717
Street Light001214
Underground Tank----
Underground Water Tank0000
Water Supply System0000
2033 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Covered Parking0000
Electric Substation34000
Electricity Supply System302000
Electrification Cost up to Project Site44042300
Other0000
Parks and Playgrounds212212340
Rain Water Harvesting0000
Renewable Energy System403500
Roads & Pavements1918200
STP777400
School0000
Security and Firefighting Services302000
Sewerage treatment & garbage disposal8000
Shopping area0000
Storm Water Drainage11000
Street Light141420
Underground Tank----
Underground Water Tank0000
Water Supply System0000

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEBEDROOMS: LAMINATED WOODEN FLOORING- PREMIUM MARBLE/TILE OR EQUIVALENT; LIVING/DINING - PREMIUM MARBLE OR EQUIVALENT; KITCHEN - PREMIUM QUALITY ANTI-SKID TILES
WALL FINISHING DETAILSINTERNAL WALL: ACRYLIC EMULSION PAINT/ OIL BOUND DISTEMPER PAINT; EXTERIOR WALL - EXTERIOR GRADE PAINT
KITCHEN DETAILSFLOORING - PREMIUM QUALITY ANTI-SKID TILES; WALLS - COMBINATION OF CERAMIC/VITRIFIED TILES AND ACRYCLIC EMULSION PAINT/OBD
BATHROOM FITTINGSWASHBASIN, CP FITTINGS, GLASS SHOWER PARTITIONS, WC OF PREMIUM QUALITY
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESALUMINIUM/UPVC FRAME
GLASS WORKIN EXTERNAL DOORS AND WINDOWS ONLY
ELECTRIC FITTINGSMODULAR SWITCHES & SOCKETS
CONDUCTING AND WIRING DETAILSFRLS WIRES
CUPBOARD DETAILSMODULAR WARDROBES WITH PREMIUM QUALITY HARDWARE
WATER STORAGEHALF DAY STORAGE CAPACITY IN OHT
LIFT DETAILSHIGH SPEED ELEVATORS (RESIDENT & SERVICE)
EXTERNAL GLAZINGSALUMINIUM/UPVC FRAME WITH GLASS
WINDOWS/GLAZINGSALUMINIUM/UPVC FRAME WITH GLASS
DOORSPAINTED POLISHED FRAME WITH PAINTED / LAMINATED / VENEERED FLUSH DOOR
MAIN DOORSPAINTED POLISHED FRAME WITH PAINTED / LAMINATED / VENEERED FLUSH DOOR
INTERNAL DOORSPAINTED POLISHED FRAME WITH PAINTED / LAMINATED / VENEERED FLUSH DOOR
AIR CONDITIONINGVRV/VRF AC SYSTEM. DUCTABLE UNIT IN LIVING & DINING ROOM AND HIGH WALL SPLIT AC IN BEDROOMS
ELECTRICAL FITTINGSMODULAR SWITCHES & SOCKETS
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYPROVISION FOR WIFI ROUTER AND BROADBAND AT ONE LOCATION
EXTERNAL FINISHING/COLOUR SCHEMEEXTERIOR GRADE PAINT
INTERNAL FINISHINGAS PER DESIGN SPECIFICATIONS

Unit-wise Specifications

TOILET
FLOORPREMIUM QUALITY ANTI-SKID TILES
WALLSSTONE/ TILES AND ACRYLIC EMULSION PAINT/ OBD ABOVE IT
CEILINGACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER PAINT
COUNTERSMARBLE / GRANITE / ENGINEERED STONE OR EQUIVALENT
SANITARY WARE/CP FITTINGSWASHBASIN, CP FITTINGS, GLASS SHOWER PARTITIONS, WC OF PREMIUM QUALITY
FIXTURESALL PROVIDED OF STANDARD COMPANY MAKE
KITCHEN
FLOORPREMIUM QUALITY ANTI-SKID TILES
WALLSCOMBINATION OF CERAMIC/VITRIFIED TILES AND ACRYCLIC EMULSION PAINT/OBD
CEILINGACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER PAINT
COUNTERSMARBLE / GRANITE / ENGINEERED STONE OR EQUIVALENT
FIXTURESCP FITTINGS, STAINLESS STEEL SINK WITH DRAINBOARD OF PREMIUM QUALITY
KITCHEN APPLIANCESMODULAR KITCHEN WITH CHIMNEY, HOB, MICROWAVE, REFRIGERATOR, WASHING MACHINE AND HEAT PUMP
SIT-OUTS
FLOORANTI-SKID TILES
WALLS & CEILINGEXTERIOR GRADE PAINT
RAILINGSMS RAILING AS PER DESIGN OR EQUIVALENT
FIXTURESNA
BED ROOMS
FLOORLAMINATED WOODEN FLOORING/PREMIUM MARBLE OR EQUIVALENT
WALLSACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER PAINT
CEILINGACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER PAINT
WARDROBESYES, MODULAR WARDROBES WITH PREMIUM QUALITY HARDWARE
MASTER TOILET
FLOORPREMIUM QUALITY ANTI-SKID TILES
WALLSSTONE/ TILES AND ACRYLIC EMULSION PAINT/ OBD ABOVE IT
CEILINGACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER PAINT
COUNTERSMARBLE / GRANITE / ENGINEERED STONE OR EQUIVALENT
SANITARY WARE/CP FITTINGSWASHBASIN, CP FITTINGS, GLASS SHOWER PARTITIONS, WC OF PREMIUM QUALITY
FITTING/FIXTURESALL PROVIDED OF STANDARD COMPANY MAKE
MASTER BEDROOM/DRESSROOM
FLOORLAMINATED WOODEN FLOORING/PREMIUM MARBLE OR EQUIVALENT
WALLSACRYLIC EMULSION PAINT
CEILINGACRYLIC EMULSION PAINT/ OIL BOUND DISTEMPER PAINT
MODULAR WARDROBESYES, MODULAR WARDROBES WITH PREMIUM QUALITY HARDWARE
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORPREMIUM MARBLE/TILE OR EQUIVALENT
WALLSACRYLIC EMULSION PAINT
CEILINGACRYLIC EMULSION PAINT/ OIL BOUND DISTEMPER PAINT
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORVITRIFIED TILES
WALLS & CEILINGACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER PAINT
TOILETANTI-SKID TILES
BALCONYANTI-SKID TILES

Fee Details

Payment 1
amount:5730000
cheque no:590398
draft date:16-10-2025
payable to:HRERA Gurugram
payee bank:ICICI BANK
Payment 2
amount:3074979
cheque no:590466
draft date:11-11-2025
payable to:HRERA Gurugram
payee bank:ICICI BANK