NEWActive

ELAIRA RESIDENCES PHASE-1

GURUGRAM, MANESAR
image
image
image
image
image
23-01-2025
Launch Date
NEW
Type
2031-03-31
Completion Date

Overview

Launch Date

23-01-2025

Completion Date

2031-03-31

Configurations

3 BHK

Sizes

2045 - 2785 sq.ft.

Project Size

2 Buildings - 268 units

Total Floors

34

Launch Price

13500 /sq.ft

RERA ID

RERA-GRG-1863-2025

Basic Details

Project NameELAIRA RESIDENCES PHASE-1
Project IDRERA-GRG-1863-2025
Project TypeNEW
Applicant TypeCompany
Submission Date23-01-2025 06:57:33 PM
Builder NameCONSCIENT INFRASTRUCTURE PRIVATE LIMITED
CINU74899DL1990PTC039324
PANXXXX280G
Emailsanjay.rastogi@conscient.in
Websitehttp://WWW.ELARIA.com/
Phone (Mobile)9810030178
Phone (Landline)01242803001
Registered Address10TH FLOOR GLOBAL BUSINESS PARK, TOWER D, MG ROAD, GURUGRAM-122002
Project AddressVILLAGE NAURANGPUR, SECTOR-80
DistrictGURUGRAM
TehsilMANESAR

Virtual Tour

Premium
Loading

Location

Elaira Residences Superimpose
Elaira Residences Superimpose

Drone Shots

Premium
Loading
Elaira Residences Drone shot

Layout

Loading
Conscient Elaira Master layout
Conscient Elaira Master layout

Floor Plan

Loading
Configuration
Super Area
Unit Details
Carpet Area
1125 sq.ft
Built Up Area
N/A
Carpet Efficiency
55%
Built Up Efficiency
N/A
Parkings
N/A

Brochures

Loading

Walkthrough

Loading

Bank Details

Bank NameHDFC BANK LIMITED, JMD REGENT PLAZA, SECTOR-26, UNIT NO.1, 2,3, 4 & 5 GROUND FLOOR NEAR GURUDRONCHARYA
Account Number99999104813301
IFSC CodeHDFC0001203
MICR Code110240182
Branch Code001203

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Lalit Jain, Ajay Kumar Agarwal, Rajesh Jain
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Yes

Development Details

Land Area4.8727 (Sqr/mtrs)
Proposed FAR1.86
Permissible FAR1.9
Total Licensed Land5.5601 (Sqr/mtrs)

Land Usage

PLOTS TO BE SOLD0.00
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1236.38
CONSTRUCTION OF ROADS7497.504
PAVEMENTS1860.423
PARKS AND PLAYGROUNDS1413.13
GREEN BELTS4527.914
VEHICLE PARKINGS491
ELECTRICITY SUB-STATION844.91
CLUB HOUSE1345.743
SEWAGE AND SOLID WASTE TREATMENT FACILITY502
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0.00
ANY OTHER0.00
Total19719.004

Cost Details

Land Cost10958.92 Lakhs
Other Cost18848.58 Lakhs
Estimated Project Cost71060.99 Lakhs
Estimated Infrastructure Cost0.00 Lakhs
Estimated Apartment Construction Cost41253.49 Lakhs

Documents

ASSET MORTGAGED DEED

Uploaded on: 20-02-2025

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 23-01-2025

TB-02 COMMUNITY BUILDING 1 FIRST FLOOR

Uploaded on: 20-02-2025

TD-01 TOILET DETAIL TOWER A

Uploaded on: 20-02-2025

NON-ENCUMBRANCE CERTIFICATE

Uploaded on: 20-02-2025

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 23-01-2025

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 23-01-2025

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 23-01-2025

ZONING PLAN

Uploaded on: 20-02-2025

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 20-02-2025

EL-02 ELEVATION B

Uploaded on: 20-02-2025

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 23-01-2025

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 23-01-2025

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 23-01-2025

TA-04 TOWER A&B TYPICAL

Uploaded on: 20-02-2025

SUPERIMPOSED PLAN

Uploaded on: 20-02-2025

TA-05 TOWER A&B REFUGE FLOOR PLAN

Uploaded on: 20-02-2025

SD-02 TOWER A FLUSHING WATER SCHEMATIC DIAGRAM

Uploaded on: 20-02-2025

POSSESSION CERTIFICATE HSIIDC

Uploaded on: 20-02-2025

LAND SEARCH REPORT

Uploaded on: 20-02-2025

SC-01 SECTION AA

Uploaded on: 20-02-2025

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 20-02-2025

ROC FORM

Uploaded on: 20-02-2025

ZONING PLAN APPROVAL

Uploaded on: 20-02-2025

TD-02 TOILET DETAIL TOWERB

Uploaded on: 20-02-2025

ASSURANCE FOR ISSUANCE (NOC)

Uploaded on: 20-02-2025

TA-01 TOWER A & B COMMUNITY BUILDING 2

Uploaded on: 20-02-2025

BR III

Uploaded on: 20-02-2025

ST-01 SITE PLAN

Uploaded on: 20-02-2025

ST-02 SITE PLAN (GREEN AREA) &PODIUM COVERAGE

Uploaded on: 20-02-2025

ENVIRONMENT CLEARANCE APPLIED

Uploaded on: 20-02-2025

SD-04 TOWER B FLUSHING WATER SCHEMATIC DIAGRAM

Uploaded on: 20-02-2025

FOREST CLEARANCE

Uploaded on: 20-02-2025

SD-03 TOWER B DOMESTIC WATER SCHEMATIC DIAGRAM

Uploaded on: 20-02-2025

EL-01 ELEVATION-A

Uploaded on: 20-02-2025

BS-01 BASEMENT 1

Uploaded on: 20-02-2025

TA-03 TOWER A & B THIRD FLOOR PLAN & AREA DIAGRAM

Uploaded on: 20-02-2025

CA CERTIFICATE EQUITY INFUSION

Uploaded on: 20-02-2025

ASSURANCE POWER & MINING PERMISSION DTD-07.01.2024

Uploaded on: 20-02-2025

CA CERTIFICATE NET WORTH

Uploaded on: 20-02-2025

CONVEYANCE DEED FROM HSIIDC

Uploaded on: 20-02-2025

HSIIDC ( RLA ) LTR.DTD-29.07.2024

Uploaded on: 20-02-2025

DEMARCATION PLAN

Uploaded on: 20-02-2025

BANK UNDERTAKING

Uploaded on: 20-02-2025

HSIIDC LTR.LAND SCHEDULE

Uploaded on: 20-02-2025

ROC STATEMENT

Uploaded on: 20-02-2025

TD-03 TOILET DETAIL

Uploaded on: 20-02-2025

SD-01 TOWER A DOMESTIC WATER SCHEMATIC DIAGRAM

Uploaded on: 20-02-2025

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 20-02-2025

BS-03 BASEMENT 3

Uploaded on: 20-02-2025

BANK RESOLUTION

Uploaded on: 20-02-2025

DD

Uploaded on: 20-02-2025

TA-02 TOWER A&B COMMUINTY BUILDING 2

Uploaded on: 20-02-2025

SC-02 SECTION BB,CC,DD

Uploaded on: 20-02-2025

BS-02 BASEMENT 2

Uploaded on: 20-02-2025

ST-03 SITE PLAN SERVICE

Uploaded on: 20-02-2025

ASSURANCE FOR CONSTRUCTION WATER

Uploaded on: 20-02-2025

TA-01A TOWER A&B COMMUNITY BUILDING 2

Uploaded on: 20-02-2025

TA-06 TOWER A&B TERRACE FLOOR PLAN

Uploaded on: 20-02-2025

TB-01 COMMUNITY BUILDING 1

Uploaded on: 20-02-2025

CA CERTIFICATE COST INCURRED

Uploaded on: 20-02-2025

Statutory Approvals

ELECTRICITY LOAD AVAILABILITYDate: 07-01-2025Status: ALREADY BEEN OBTAINED
STORM WATER DRAINAGEDate: 14-11-2024Status: ALREADY BEEN OBTAINED
ZONING PLAN APPROVALDate: 30-10-2024Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 14-11-2024Status: ALREADY BEEN OBTAINED
WATER SUPPLYDate: 14-11-2024Status: ALREADY BEEN OBTAINED
SEWAGE DISPOSALDate: 14-11-2024Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERAS PER PROJECT REPORT

NOC

ROADSProvider: ALREADY CONNECTEDApproval Status: Approved
WATER SUPPLYProvider: HSIIDC/IMT/ESTATE/2024/1295Approval Status: Approved
ELECTRICITYProvider: HSIIDC/ENGG./IMT/25/ 3788Approval Status: Approved
SEWAGE DISPOSALProvider: HSIIDC/IMT/ESTATE/2024/1295Approval Status: Approved
STORM WATER DRAINAGEProvider: HSIIDC/IMT/ESTATE/2024/1295Approval Status: Approved

Project Team

Authorized Representative

SANJAY RASTOGI
Name
SANJAY RASTOGI
PAN
XXXX507R
Email
sanjay.rastogi@conscient.in
Mobile
9810030178
Landline
01242803000
Address
C-162 2nd Floor Ardee City Sector-52 Gurugram

Managing Director/CEO

LALIT JAIN
Name
LALIT JAIN
PAN
XXXX082R
Email
Lalit.jain@conscient.in
Mobile
9810030178
Landline
01242803000
Address
12 Sultanpur farm Delhi-110030

Directors

RAJESH JAIN
Name
RAJESH JAIN
PAN
XXXX085J
Email
Rajesh.jain@conscient.in
Mobile
9810030178
Landline
01242803000
Address
12 Sultanpur farm Delhi-110030
AJAY KUMAR AGARWAL
Name
AJAY KUMAR AGARWAL
PAN
XXXX438R
Email
Ajay.agrawal@conscient.in
Mobile
9811021702
Landline
01242803000
Address
HOUSE NO-35 SECTOR 16A NAFARIDABAD121002HaryanaIndia
MANIT JAIN
Name
MANIT JAIN
PAN
XXXX570L
Email
manit.jain@conscient.in
Mobile
9810030178
Landline
01242803000
Address
12 Sultanpur farm Delhi-110030

Contact Details

Project ContactEmail: sanjay.rastogi@conscient.inMobile: 9810030178Landline: 01242803000
Project Contact PersonName: SANJAY RASTOGIEmail: sanjay.rastogi@conscient.inMobile: 9810030178Landline: 01242803000

Land Details

Land Area4.8727 (Sqr/mtrs)
Proposed FAR1.86
Permissible FAR1.9
Total Licensed Land5.5601 (Sqr/mtrs)

Land Usage

Land Cost10958.92 Lakhs
Other Cost18848.58 Lakhs
Estimated Project Cost71060.99 Lakhs
Estimated Infrastructure Cost0.00 Lakhs
Estimated Apartment Construction Cost41253.49 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres46.1
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres--00
Electricity Supply System--00
Other--55
Parks and Playgrounds--00
Roads & Pavements--00
Sewerage treatment & garbage disposal--33
Shopping area--00
Storm Water Drainage--22
Water Supply System--1515
2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0000
Other52.92.92.9
Parks and Playgrounds0000
Roads & Pavements0000
Sewerage treatment & garbage disposal3222
Shopping area0000
Storm Water Drainage2222
Water Supply System1518.218.218.2
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres00250254.8
Electricity Supply System0000
Other7.92.916.911.9
Parks and Playgrounds000.50.5
Roads & Pavements0000
Sewerage treatment & garbage disposal2222
Shopping area0000
Storm Water Drainage2222
Water Supply System18.218.218.218.2
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres254.8254.8254.8254.8
Electricity Supply System0058.6
Other34.937.844.848
Parks and Playgrounds0.50.60.60.6
Roads & Pavements25252524
Sewerage treatment & garbage disposal2222
Shopping area0000
Storm Water Drainage2222
Water Supply System18.218.218.218.2
2030 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres254.8254.8254.8254.8
Electricity Supply System8.68.68.68.6
Other4859.559.559.5
Parks and Playgrounds0.60.60.60.6
Roads & Pavements24242424
Sewerage treatment & garbage disposal2222
Shopping area0000
Storm Water Drainage2222
Water Supply System18.218.218.218.2
2031 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres33.533.533.533.5
Electricity Supply System0000
Other14.614.64.14.1
Parks and Playgrounds0000
Roads & Pavements0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Water Supply System0000

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEMARBLE/ PREMIUM QUALITY TILES/ EQUIVALENT
WALL FINISHING DETAILSPAINT SURFACE
KITCHEN DETAILSFLOOR TILES & PAINT
BATHROOM FITTINGSSTANDARD CP FITTING + WC+WASHBASIN
WOOD WORK ETCFLUSH FLOOR
DOORS AND WINDOS FRAMESDOUBLE/SINGLE GLASS
GLASS WORKNA
ELECTRIC FITTINGSLED FIXTURES
CONDUCTING AND WIRING DETAILSFRLS INSULTATED COPPER CONDUCTOR WIRE
CUPBOARD DETAILSNA
WATER STORAGEWATER TANK UG/OH
LIFT DETAILSPASSENGER/SERVICE/FIREMAN LIFT
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGSALUMINIUM/ UPVC/ EQUIVALENT
DOORSNA
MAIN DOORSFLUSH DOOR
INTERNAL DOORSBOTH SIDE LAMINATED
AIR CONDITIONINGVRV SYSTEM
ELECTRICAL FITTINGSLED FIXTURES
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMETEXTURE PAINT
INTERNAL FINISHINGPAINT SURFACE

Unit-wise Specifications

TOILET
FLOORTILE/EQUIVALENT
WALLSTILE/EQUIVALENT
CEILINGPAINT/EQUIVALENT
COUNTERSNA
SANITARY WARE/CP FITTINGSSTANDARD FIXTURE
FIXTURESSTANDARD
KITCHEN
FLOORTILE/EQUIVALENT
WALLSPAINT/EQUIVALENT
CEILINGPAINT/EQUIVALENT
COUNTERSNA
FIXTURESSTANDARD
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORSTANDARD
WALLS & CEILINGSTANDARD
RAILINGSSTANDARD
FIXTURESSTANDARD
BED ROOMS
FLOORWOODEN/TILE/EQUIVALENT
WALLSPAINT/EQUIVALENT
CEILINGPAINT/EQUIVALENT
WARDROBESNA
MASTER TOILET
FLOORTILE/EQUIVALENT
WALLSTILE/EQUIVALENT
CEILINGPAINT/EQUIVALENT
COUNTERSSTANDARD FIXTURE
SANITARY WARE/CP FITTINGSSTANDARD FIXTURE
FITTING/FIXTURESSTANDARD FIXTURE
MASTER BEDROOM/DRESSROOM
FLOORWOODEN/TILE/EQUIVALENT
WALLSPAINT/EQUIVALENT
CEILINGPAINT/EQUIVALENT
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORSTONE/TILE/EQUIVALENT
WALLSPAINT/EQUIVALENT
CEILINGPAINT/EQUIVALENT
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORTILE/EQUIVALENT
WALLS & CEILINGPAINT/EQUIVALENT
TOILETPAINT/EQUIVALENT
BALCONYTILE/EQUIVALENT

Fee Details

Payment 1
amount:430000
cheque no:505879
draft date:07-01-2025
payable to:HRERA Gurugram
payee bank:ICICI BANK LIMITED
Payment 2
amount:820000
cheque no:505878
draft date:07-01-2025
payable to:HRERA Gurugram
payee bank:ICICI BANK LIMITED