Launch Date
Completion Date
RERA ID
26.6829050
80.9011219
80 54 03.1-26 40 57.7 to north, 80 54 04.2-26 40 57.2 to east, 80 54 03.5-26 40 59.8 to south, 80 54 05.8 -26 40 58.9 to west
1.65 meters high boundary wall
tremix flooring / metal road
with chequered tiles
by boring
STP
covered brick drain as per MEP consultant
park 1= 298 square meter and park 2= 308.23 square meter
16 evergreen trees and 16 seasonal plants
government electric connection with transformer and DG set will be provided and sufficient lights on internal roads and common area.
swimming pool
STP
STP
rain water harvesting will be done
use of solar street lights and LED lights for common area
fire hydrant cabinet and fire staircase will be provided as per norms
parks and terrace for public use
fire hydrant cabinet
security of campus with CCTV system at entrance
Showing 3 blocks with 54 units
Total Carpet Area
6099.74 m²
65656.99 ft²
Total Units
114
4 different types
Blocks & Floors
3
13 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
17470.00 m²
188045.33 ft²