NewActive

DLF Techpark Noida Phase 2

Gautam Buddha Nagar, Uttar Pradesh
01-04-2023
Launch Date
New
Type
30-09-2026
Completion Date

Overview

Launch Date

01-04-2023

Completion Date

30-09-2026

RERA ID

UPRERAPRJ385951/08/2024

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)24796
Project NameDLF Techpark Noida Phase 2
Registration Fee (in Rs.)258000
AddressPlot No. 1, Sector 143A, Noida, Gautam Buddha Nagar, U.P
Village/Locality/Sector etc.Plot No.1, Sector 143A, Noida, Gautam Buddha Nagar, U.P
StateUttar Pradesh
Project Duration (In month)42
DistrictGautam Buddha Nagar
Original Start Date-
TehsilDadri
Proposed Start Date01-04-2023
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)18469
Proposed Completion Date30-09-2026

Location

Latitude

28.4999199

Longitude

77.4272096

Bank Details

Account Details
Name of the AccountUrvasi Infratech Private Limited - Collection A/c - DLF Techpark Noida Phase 2
Account Number342005000156
Bank NameICICI Bank
Branch NameK1, Senior Mall, Sec 18, Noida, Uttar Pradesh, 201301
Branch AddressK1, Senior Mall, Sec 18, Noida, Uttar Pradesh, 201301
IFSC CodeICIC0000031
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
Branch Email Addressshweta.sin@icicibank.com
Separate Account Details
Name of the AccountUrvasi Infratech Private Limited-Separate A/c-DLF Techpark Noida Phase 2
Account Number342005000157
Bank NameICICI Bank
Branch NameK1, Senior Mall, Sec 18, Noida, Uttar Pradesh, 201301
Branch AddressK1, Senior Mall, Sec 18, Noida, Uttar Pradesh, 201301
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeICIC0000031
Transaction Account Details
Name of the AccountUrvasi Infratech Private Limited-Transaction A/c-DLF Techpark Noida Phase 2
Account Number342005000158
Bank NameICICI Bank
Branch NameK1, Senior Mall, Sec 18, Noida, Uttar Pradesh, 201301
Branch AddressK1, Senior Mall, Sec 18, Noida, Uttar Pradesh, 201301
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeICIC0000031

Development Works

Demarcation of Plots

We have 3 side road plot of total size 100256 sq. mtr. (proposed project covered 33310 sq. mtr.) having 3 entrance gate towards east side (45 m. wide road), 2 entrance gate towards south side (45 m . Wide road) and 1 entrance gate towards west side (30 m. Wide road)

Boundary Wall

"Data Centre 2 - The total boundary wall height is 2400mm and barbed wire above. (Data Centre 3) - The total boundary wall height is 2400mm and barbed wire above."

Road Work

Data Centre 2 & 3) - Minimum 6M wide driveways are planned in tremix.

Footpaths

" Data Centre 2 & 3) - Barrier free pedestrian movement is planned to connect different areas while avoiding vehicular clashes."

Water Supply Including Drinking Water Facilities

(Data Centre 2 &3 )Treated water supply is provided through WTP Plant Room.

Sewer System

"Combined STP Provided for Data Centre 1,IT Block of Phase 1 & Data Centre 2 also. MBBR STP provided in Campus."

Drain

Storm water drainage provided. Storm water from Terrace, Roads and other landscape area shall be connected to Storm water drain channel with its further connectivity to Rain water harvesting Pit for recharge the Ground water. Overflow from RWH Pit shall be connected to Municipal drain line.

Parks

" Data Centre 2 & 3) - Green area is planned along plot line and along the building. Multipurpose lawn is also planned."

Tree Planting

" Data Centre 2 &3) - Trees are planned along boundary wall as buffer planting. Trees are also planned along building."

Design For Electric Supply Including Street Lighting

"Common Area and Base Build lighting shall be Planned . As far as concern of High Side electrical System shall be deigned by STT(Client) We will design & implement Electrical System as per NBC Code/ Local Electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc."

Community Buildings

Not proposed

Treatment and Disposal System of Sewage and Sullage water

MBBR STP provided in Campus. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system, when would come into force.

Solid Waste Management And Disposal System

" Block B - Combined STP Provided for Data Centre1 ,IT Block of Phase 1 and Data Centre 2 also"

Water Conservation System

Project shall be planned with low flow fixtures as well dual flush cistern. Further rainwater harvesting system is also proposed to improve the ground water level.

Energy Management System Including Use of Renewable Energy

" Data Centre 2 & 3 - We have provided LED Lighting for common area and external infra. Solar power generation we are using."

Fire Protection And Fire Safety System

Fire Fighting and Fire Protection system is planned in campus as per NBC Code.

Social Infrastructure And Other Public Amenities Including Public Health Services

Not proposed.

Emergency Evacuation Services

Fire staircase shall be provided. And Refuse area shall also be provided as part of emergency evacuation services.

Other Miscellaneous Work

Not proposed

Documents

Lease Deed

No: 897 | Date: 25-03-2008

Extract of Khatauni

No: Merger of Land by way of amalgamation - DLF Commercial to DLF Home Developers | Date: -

Extract of Khatauni

No: Land Transfer to Urvasi Infratech - by DLF Home Developers | Date: -

Extract of Khatauni

No: Subsidiary Relationship between DLF home Developers and DLF Commercial | Date: -

Extract of Khatauni

No: Subsidiary Relationship between DLF home Developers and Urvasi Infratech | Date: -

Extract of Khatauni

No: No Dues Certificate - Lease Payment - Urvasi Infratech | Date: -

Extract of Khatauni

No: Board Resolution authorizing Rajeev Singh as Authorized Signatory for RERA | Date: -

Extract of Khatauni

No: Scheme of Arrangement sanctioned by Honble High Court as per order dated 11.01.2011 | Date: -

Lease Deed

No: 5730 | Date: 04-08-2011

Proforma of Completion Certificate(Occupancy)

General body resolution for AoA (if Authorized Entity is AoA)

Notarized Affidavit for completion of balance development work

Other

Details of Encumbrances

Uploaded: 01-07-2024

Commencement Certificate

Uploaded: 01-04-2024

Other Plan(If Any)

Uploaded: 01-04-2024

Proforma of Application Form

Uploaded: 01-04-2024

Proforma of Allotment Letter

Uploaded: 01-04-2024

Proforma of Conveyance Deed

Uploaded: 01-04-2024

Waste Disposal Plan

Uploaded: 06-04-2024

Water Supply Plan

Uploaded: 06-04-2024

Electricity Supply Plan

Uploaded: 06-04-2024

Development Work Plan

Uploaded: 01-04-2024

Affidavit

Uploaded: 02-05-2024

CA CERTIFICATE

Uploaded: 01-04-2024

ARCHITECT CERTIFICATE

Uploaded: 08-05-2024

ENGINEERS CERTIFICATE

Uploaded: 08-05-2024

Proforma of Agreement for Sale

Uploaded: 01-04-2024

Permits

Orignal Permit NoNOIDA/CAP/2021/V-720/720
Orignal Permit Date26-11-2021
Valid Upto25-11-2026
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto25-11-2029
End Date30-09-2026
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)M/s RSB INFRASTRUCTURE LIMITED
Contractor AddressSCO-34, First Floor, Sector-11, DLF, Faridabad-121006
Architect NameROHIT SAINI
Architect AddressE-1, Block E, Sector 55, Noida
Architect Licence NumberCA/2020/121021
Structural Engineer NameRAKESH CHAUHAN
Structural Engineer Address1/11042 STREET NO.7 SUBASH PARK, NAVIN SHAHDARA, DELHI 110032
Mobile number(Project Co-ordinator)9599955126

Land Details

AFS

Showing 2 blocks with 26 units

Property Summary

Total Carpet Area

114236.11

1229626.06 ft²

Total Units

26

1 different types

Blocks & Floors

2

13 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:4393.70
Balconies:0
Parking ratio:0.00 per unit

Block Block D

13 units

Block Block E

13 units

Khasra Details

Total Area

24.00

258.33 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoPlot No. 1, Sector 143 A, Noida
Area(In Sq. Mt.)24,796.04

Other Details

Contractor Name (if any)M/s RSB INFRASTRUCTURE LIMITED
Contractor AddressSCO-34, First Floor, Sector-11, DLF, Faridabad-121006
Architect NameROHIT SAINI
Architect AddressE-1, Block E, Sector 55, Noida
Architect Licence NumberCA/2020/121021
Structural Engineer NameRAKESH CHAUHAN
Structural Engineer Address1/11042 STREET NO.7 SUBASH PARK, NAVIN SHAHDARA, DELHI 110032
Mobile number(Project Co-ordinator)9599955126