The Plot No. GH-11B, Sector-1, Greater NOIDA West had been demarcated by Greater NOIDA Industrial Development Authority (GNIDA).
A Boundary wall of RCC/Brick of thickness 115mm / 230/150mm and ht of 1800mm with plaster and railing will be prepared.
Access driveway to all the towers will be provided and that drive way will be of pavers M 30 grade with thickness of 65 mm and 100mm kerb stone sides if required. An entry of tower, there will a pattern as per the design.
Footpath will be provided using 40-50mm paver whenever required.
Greater NOIDA Industrial Development Authority (GNIDA)/Tanker shall supply water for the entire society, and it shall be collected in under ground water tanks of 100 KL X 1 No Domestic Treated Water and 100 KL X1 No Raw Water Tanks and Water pipes to overhead tanks at respective tower. WTP will be equipped with Hydro Pneumatic pump with GI ring and Riser.
STP of 250 KL Capacity will be constructed using RCC and required pump rooms, STP treated Water will be used in flushing system and gardening.
Storm Water drainage system will be constructed using 300 mm dia pipes as per drawings.
Landscape will civil work masonry 115/230 mm and stone, paver, grass and various type of plantation, shrubs.
Tree Plantation will be as per sanctioned plan in which 50 percent trees will be evergreen trees
HT Electrical supply will be provided by NPCL, Substation consisting of 2 Nos 1250 KVA and 1 X 800 KVA Transformers, LT Panel and 1 no. X 750 KVA, 1X600 KVA and 1 no X 500 KVA DG Set will be there. Street Lighting will be done using LT Supply and Power Back up.
Community building will be made as per approved building plan and there will be multi purpose hall, indoor games, GYM, Entrance Lobby etc.
250 KL STP will be installed as per sanctioned drawing. All sewerage will be treated and treated water will be used for landscaping and flushing system.
Collection, Storage and disposal will be done manually, and disposal will be done as per norms.
3 nos. Rain Water Harvesting System is being provided to conserve rain water and dual flush system will also be provided.
Usage of LED Lights will be used all over the project and use of solar PV System will also be explored.
In compliance to the National Building Code of India 2016, Part IV requirements, Fire Protection and Safety System Consisting of- Underground fire tanks of 270X2 = 540m3 Each tower having 10m3 fire overhead water tank Main electric fire hydrant and sprinkler pumps provided of 2850 LPM each. Jockey Pump for Hydrant and Sprinkler Pump of 180 LPM each. Diesel Engine Fire Pump of 2850 LPM. Water Certain pump of 2280 LPM All Project sprinkler system provided in compliance to IS Codes and project fire safety requirements aligned to NBC 2016 Part IV.
Social gathering places in the community building are being provided.
Yes, Refuge area provided at every tower on 18th and 27th Floor in addition to main and fire staircase.
Proper Security System including Security Guard, CCTV, Cameras and controlled access will be made available.
No: JOINT DEVELOPMENT AGREEMENT | Date: 28-07-2023
No: REVOCATION OF CANCELLATION OF LAND LETTER | Date: 27-04-2023
No: RESTORATION ORDER FROM GNOIDA | Date: 04-09-2023
Showing 10 blocks with 214 units
Total Carpet Area
42601.60 m²
458559.36 ft²
Total Units
375
4 different types
Blocks & Floors
10
36 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
14769.00 m²
158972.04 ft²