Brick Work with Grit finished .
CC Road (Main Road) and Interlocking Tile (Service Road).
Interlocking Tile
Internal Water Supply pipes are of G.I. Pipe and External Water supply pipes 20mm dia CPVC Pipe.
Sewer System installed via RCC hume Pipe NP2 Class.
Brick work Drain has been constructed .
Brick Work, Boundary wall of Park and Plantation in Parks.
Tree Plantation has been done in the Cluster.
Street Lighting and Internal Electric Supply work Completed.
A Community Centre has been constructed by UPAVP which is approx 150Mt. from the Cluster.
Construction of STP is under Estimation Process/Approval.
NA
NA
NA
NA
Public Health Services and Social Infrastructure is available near the cluster.
NA
All required Facilities Available
Showing 4 blocks with 16 units
Total Carpet Area
1489.92 m²
16037.35 ft²
Total Units
64
1 different types
Blocks & Floors
4
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
852.00 m²
9170.84 ft²