Have queries on this Project?
77.5452
28.6936
Showing 6 blocks with 24 units
Total Carpet Area
6528.96 m²
70277.07 ft²
Total Units
288
1 different types
Blocks & Floors
6
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
45520.00 m²
489972.73 ft²
NORTH-OTHERS LAND, SOUTH-GDA PLOT, EAST-ROAD, WEST-ROAD
5FT HEIGHT BOUNDARY WALL SHOULD BE CONSTRUCTED
UPTO 6 MTR WIDE ROAD 1 LAYER GSB THEN 80MM THICK RUBBER MOLDED INTERLOCKING TILE. IN MAIN ROAD GSB, WMM, DBM THEN BC
NA
THROUGH OHT. MAIN DISTRIBUTION LINE PROPOSED OF HDPE PIPE
RCC HUME PIPE PROPOSED IN SEWER LINE
BRICK DRAIN WITH PLASTER IN CEMENT MORTAR PROPOSED
BRICK WORK BOUNDARY WALL INNER SIDE GREEN PLANTATION
PROPOSED
VIA SUBSTATION LAY OUT PLAN ATTACHED
PROPOSED
TO BE PROVIDED BY NAGAR NIGAM
TO BE PROVIDED BY NAGAR NIGAM
NA
NA
FIRE HYDRANT PROPOSED IN WATER MAIN
PROPOSED IN LAYOUT
NA
NA
Construction of 288 EWS Houses Under PMAY at Masuri, Ghaziabad (Part-A) is located in Ghaziabad.
Yes. Construction of 288 EWS Houses Under PMAY at Masuri, Ghaziabad (Part-A) is registered under UPRERAPRJ201587 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Construction of 288 EWS Houses Under PMAY at Masuri, Ghaziabad (Part-A) is 8 December 2021.
Construction of 288 EWS Houses Under PMAY at Masuri, Ghaziabad (Part-A) is developed by GHAZIABAD DEVELOPMENT AUTHORITY.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.