ONGOINGActive

ELAN MERCADO

GURUGRAM, MANESAR
18-12-2019
Launch Date
ONGOING
Type
2022-09-13
Completion Date

Overview

Launch Date

18-12-2019

Completion Date

2022-09-13

RERA ID

RERA-GRG-398-2019

Basic Details

Project NameELAN MERCADO
Project IDRERA-GRG-398-2019
Project TypeONGOING
Applicant TypeCompany
Submission Date18-12-2019 05:25:59 AM
Builder NameELAN LIMITED
CINU70200DL2013PLC250600
PANXXXX341G
Emailcagauravkhandelwal@gmail.com
Websitehttp://www.elanlimited.com
Phone (Mobile)9582727222
Phone (Landline)01244101100
Registered Address3RD FLOOR,
Project AddressVILLAGE NAURANGPUR, SECTOR- 80
DistrictGURUGRAM
TehsilMANESAR

Bank Details

Bank NameDLF CYBER CITY , GURUGRAM
Account Number017266200000031
IFSC CodeYESB0000172
MICR Code110532042
Branch Code000172

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)ELAN LIMITED
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)DOCUMENT ENCLOSED

Development Details

Land Area2.9875 (Acre)
Proposed FAR4.8624
Permissible FAR4.8675
Total Licensed Land2.9875 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0
CONSTRUCTION OF ROADS0.649
PAVEMENTS0.186
PARKS AND PLAYGROUNDS0
GREEN BELTS0.877
VEHICLE PARKINGS1.163
ELECTRICITY SUB-STATION0.051
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0.061
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
Total2.987

Cost Details

Land Cost3240 Lakhs
Other Cost4367 Lakhs
Estimated Project Cost16607 Lakhs
Estimated Infrastructure Cost0 Lakhs
Estimated Apartment Construction Cost9000 Lakhs

Documents

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 09-12-2019

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 09-12-2019

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 09-12-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 09-12-2019

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 12-12-2019

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 12-12-2019

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 12-12-2019

DEMARCATION PLAN

Uploaded on: 12-12-2019

ZONING PLAN

Uploaded on: 12-12-2019

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 12-12-2019

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 12-12-2019

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 12-12-2019

CA CERTIFICATE ELAN LIMITED

Uploaded on: 16-12-2019

BALANCE SHEET 2018

Uploaded on: 16-12-2019

BALANCE SHEET 2019

Uploaded on: 16-12-2019

ALLOTMENT LETTER

Uploaded on: 16-12-2019

GROUND FLOOR PLAN

Uploaded on: 03-02-2020

8TH 9TH AND 10TH FLOOR PLAN

Uploaded on: 03-02-2020

1ST FLOOR PLAN

Uploaded on: 03-02-2020

SECTION XX

Uploaded on: 03-02-2020

REVISED BUILDING PLAN

Uploaded on: 03-02-2020

BASEMENT 1 FLOOR PLAN

Uploaded on: 03-02-2020

ROC

Uploaded on: 03-02-2020

BASEMENT 2 FLOOR PLAN

Uploaded on: 03-02-2020

LEFT SIDE ELEVATION

Uploaded on: 03-02-2020

11TH TO 17TH FLOOR PLAN

Uploaded on: 03-02-2020

4TH FLOOR PLAN

Uploaded on: 03-02-2020

SECTION ZZ

Uploaded on: 03-02-2020

BASEMENT 3 FLOOR PLAN

Uploaded on: 03-02-2020

3RD FLOOR PLAN

Uploaded on: 03-02-2020

SITE PLAN

Uploaded on: 03-02-2020

6TH FLOOR PLAN

Uploaded on: 03-02-2020

5TH FLOOR PLAN

Uploaded on: 03-02-2020

LOI

Uploaded on: 03-02-2020

LC IV

Uploaded on: 03-02-2020

FIRE SCHEME

Uploaded on: 03-02-2020

RIGHT SIDE ELEVATION

Uploaded on: 03-02-2020

7TH FLOOR PLAN

Uploaded on: 03-02-2020

REAR ELEVATION

Uploaded on: 03-02-2020

ENVIRONMENT CLEARANCE

Uploaded on: 03-02-2020

2ND FLOOR PLAN

Uploaded on: 03-02-2020

FOREST NOC

Uploaded on: 03-02-2020

Statutory Approvals

APPROVAL OF REVISED BUILDING PLANDate: 08-05-2019Status: ALREADY BEEN OBTAINED
APPROVAL OF SERVICE ESTIMATESDate: NAStatus: APPLIED FOR BUT YET TO RECEIVE
APPROVAL OF FIRE NOCDate: NAStatus: APPLIED FOR BUT YET TO RECEIVE
OCCUPATION CERTIFICATEDate: NAStatus: YET TO FILE FOR APPROVAL
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: Yes
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: No
STREET LIGHTING PLANApproved: Yes
PARKING PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEYET TO BE PREPARED
ELECTRICITY SUPPLY SYSTEMYET TO BE PREPARED
SEWAGE TREATMENT & GARBAGE DISPOSALYET TO BE PREPARED
STREET LIGHTINGYET TO BE PREPARED
SECURITY AND FIRE FIGHTINGYET TO BE PREPARED
PLAYGROUNDS AND PARKSYET TO BE PREPARED
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED

NOC

ROADSProvider: NHAIApproval Status: Approved
WATER SUPPLYProvider: MCG/HUDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: MCG/HUDAApproval Status: Pending
STORM WATER DRAINAGEProvider: MCG/HUDAApproval Status: Pending

Project Team

Authorized Representative

GAURAV KHANDELWAL
Name
GAURAV KHANDELWAL
PAN
XXXX203L
Email
kapoorselan@gmail.com
Mobile
9582727222
Landline
01244101100
Address
8185 PATEL NAGAR SECTOR-15 PART II GURGURAM

Managing Director/CEO

RAVISH KAPOOR
Name
RAVISH KAPOOR
PAN
XXXX912R
Email
kapoorselan@gmail.com
Mobile
9582727222
Landline
01244101100
Address
1910 MAGNOLIAS GURGAON

Directors

AKASH KAPOOR
Name
AKASH KAPOOR
PAN
XXXX282G
Email
kapoorselan@gmail.com
Mobile
9582727222
Landline
01244101100
Address
1910 MAGNOLIAS GURGAON

Contact Details

Project ContactEmail: info@elanlimited.comMobile: 9582727222Landline: 01244101100
Project Contact PersonName: GAURAV KHANDELWALEmail: info@elanlimited.comMobile: 9582727222Landline: 01244101100

Land Details

Land Area2.9875 (Acre)
Proposed FAR4.8624
Permissible FAR4.8675
Total Licensed Land2.9875 (Acre)

Land Usage

Land Cost3240 Lakhs
Other Cost4367 Lakhs
Estimated Project Cost16607 Lakhs
Estimated Infrastructure Cost0 Lakhs
Estimated Apartment Construction Cost9000 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2019 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres-000
Electricity Supply System-360405405
Other-000
Parks and Playgrounds-000
Roads & Pavements-22.427.228.8
Sewerage treatment & garbage disposal-363636
Shopping area-000
Storm Water Drainage-22.522.522.5
Water Supply System-8185.585.5

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES
WALL FINISHING DETAILSOBD
KITCHEN DETAILSKITCHEN ATE WITH GRANITE COUNTERS PLY CABINET WITH LAMINATE FINISH
BATHROOM FITTINGSCP-FITTINGA-G ROHE/JAQAR CHINAWARE - ROCK/AMERICAN STANDARD
WOOD WORK ETCFLUSH DOORS WITH LAMINATE FINISH
DOORS AND WINDOS FRAMESWOODEN DOOR FRAME ALUMINIUM FRAME WINDOWS
GLASS WORKTOUGHENED GLASS WITH ALUMINIUM FRAME
ELECTRIC FITTINGSABT/L&T.SCHNIDER
CONDUCTING AND WIRING DETAILSPVC & MS CONDUIT FRLS WIRES
CUPBOARD DETAILSPLY & BOARD WITH LAMINATE FINISH
WATER STORAGERCC TANKS IN BASEMENT AND TERRACE
LIFT DETAILSMITSUBISHI (LIFT) OTIS (ESCALATOR)
EXTERNAL GLAZINGSEXTERNAL GLAZING WITH ALUMINIUM FRAME
WINDOWS/GLAZINGSGLASS WINDOW WITH ALUMINIUM FRAME
DOORSFLUSH DOORS
MAIN DOORSFLUSH DOORS/ MS FIRE DOORS
INTERNAL DOORSFLUSH DOORS
AIR CONDITIONINGSPLIT AC FOR APARTMENTS CENTRALISED SCREW CHILLER FOR CINEMAS
ELECTRICAL FITTINGSNA
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYAS PER OPERATION REQUIREMENTS
EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE DISTEMPER INTERNAL GRADE DISTEMPER
INTERNAL FINISHINGNA

Unit-wise Specifications

TOILET
FLOORNA
WALLSNA
CEILINGNA
COUNTERSNA
SANITARY WARE/CP FITTINGSNA
FIXTURESNA
KITCHEN
FLOORNA
WALLSNA
CEILINGNA
COUNTERSNA
FIXTURESNA
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORNA
WALLS & CEILINGNA
RAILINGSNA
FIXTURESNA
BED ROOMS
FLOORNA
WALLSNA
CEILINGNA
WARDROBESNA
MASTER TOILET
FLOORVIT. TILE
WALLSVIT. TILE
CEILINGGYP BOARD CEILING
COUNTERSGRANITE STONE FINISH
SANITARY WARE/CP FITTINGSSS FINISH CP FITTINGS - GROHE WHITE COLOUR SANITARY WARE - ROCA
FITTING/FIXTURESNA
MASTER BEDROOM/DRESSROOM
FLOORLAMINATED WOODEN FLOORS
WALLSDISTEMPER
CEILINGDISTEMPER
MODULAR WARDROBESPLY WOOD & BOARD WITH LAMINATED FINISH
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORLAMINATED WOODEN FLOOR
WALLSET DISTEMPER
CEILINGDISTEMPER
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORNA
WALLS & CEILINGNA
TOILETNA
BALCONYVITRIFIED TILE FLOOR

Fee Details

Payment 1
amount:787000
cheque no:33846
draft date:20-07-2017
payable to:HRERA Gurugram
payee bank:HDFC