ONGOINGActive

COBAN RESIDENCES

GURUGRAM, HARSARU ST
29-01-2020
Launch Date
ONGOING
Type
2029-03-10
Completion Date

Overview

Launch Date

29-01-2020

Completion Date

2029-03-10

RERA ID

RERA-GRG-575-2020

Basic Details

Project NameCOBAN RESIDENCES
Project IDRERA-GRG-575-2020
Project TypeONGOING
Applicant TypeCompany
Submission Date29-01-2020 03:18:06 AM
Builder NamePAREENA INFRASTRUCTURES PVT. LTD.
CINU70109DL2009PTC188725
PANXXXX883J
Emailaccounts@pareenainfra.com
Websitehttp://www.pareena.in
Phone (Mobile)8800693505
Phone (Landline)01242219440
Registered AddressC7A IIND FLOOR, OMAXE CITY CENTRE MALL, SOHNA ROAD, SECTOR 49, GURUGRAM, HARYANA
Project AddressGARHI HARSARU ROAD VILLAGE GOPALPUR, SECTOR 99A, GURUGRAM, HARYANA
DistrictGURUGRAM
TehsilHARSARU ST

Bank Details

Bank NameJMD MEGAPOLIS, SOHNA ROAD, GURUGRAM
Account Number57500000420659
IFSC CodeHDFC0003648
MICR Code110240344
Branch Code3648

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)1. Surender Kumar Verma resi. of Flat no. 03, Palms apartment, plot no. 13B, Sector 6, Dwraka, New Delhi 2. Virender Verma resi. of Flat no. 03, Palms apartment, plot no. 13B, Sector 6, Dwraka, New Delhi
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)attached annexure

Development Details

Land Area10.5875 (Acre)
Proposed FAR174.969
Permissible FAR175
Total Licensed Land10.5875 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS2.01492
CONSTRUCTION OF ROADS2.52357
PAVEMENTS1.08153
PARKS AND PLAYGROUNDS1.684
GREEN BELTS0.505
VEHICLE PARKINGS0.96087
ELECTRICITY SUB-STATION0.10331
CLUB HOUSE0.11193
SEWAGE AND SOLID WASTE TREATMENT FACILITY0.08116
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0.4728
COMMERCIAL0.05284
RAIN0.0342
RAMP0.1566
AREA UNDER ROAD WIDENING0.74183
SCHOOL0.06294
Total10.5875

Cost Details

Land Cost10467.44 Lakhs
Other Cost15420.22 Lakhs
Estimated Project Cost47142.84 Lakhs
Estimated Infrastructure Cost873.83 Lakhs
Estimated Apartment Construction Cost20381.35 Lakhs

Documents

BR-III

Uploaded on: 16-10-2020

COBAN LICENSE COPY

Uploaded on: 16-10-2020

FIRE SCHEME APPROVAL

Uploaded on: 16-10-2020

TOWER -F ELEVATION

Uploaded on: 16-10-2020

FOREST NOC

Uploaded on: 16-10-2020

BASEMENT

Uploaded on: 16-10-2020

MINING PERMISSION

Uploaded on: 16-10-2020

TOWER C,D,E SECTION

Uploaded on: 16-10-2020

POLLUTION NOC

Uploaded on: 16-10-2020

SALE DEED 1

Uploaded on: 16-10-2020

RENEWAL OF LICENSE AND COD

Uploaded on: 16-10-2020

REVISED BRIII

Uploaded on: 16-10-2020

REVISED ZONING

Uploaded on: 16-10-2020

SHIJRA MAP

Uploaded on: 16-10-2020

ZONING PLAN

Uploaded on: 16-10-2020

MONEX 99A LOI, LICENSE

Uploaded on: 16-10-2020

MONEX ENVIRONMENTAL CLEARANCE

Uploaded on: 16-10-2020

SALE DEED 2

Uploaded on: 16-10-2020

BASEMENT AREA

Uploaded on: 16-10-2020

COMMUNITY BUILDING

Uploaded on: 16-10-2020

EWS

Uploaded on: 16-10-2020

MAIN GATE

Uploaded on: 16-10-2020

SCHOOL ELEVATION

Uploaded on: 16-10-2020

SCHOOL

Uploaded on: 16-10-2020

SHOPPING

Uploaded on: 16-10-2020

SITE PLAN CALCULATION

Uploaded on: 16-10-2020

SITE PLAN PUBLIC HEALTH

Uploaded on: 16-10-2020

TOWER A&B AREA DETAILS

Uploaded on: 16-10-2020

TOWER -B FLOOR PLAN

Uploaded on: 16-10-2020

TOWER -B SECTION PLAN

Uploaded on: 16-10-2020

TOWER C,,D,E ELEVATION 2

Uploaded on: 16-10-2020

TOWER C,D,E AREA

Uploaded on: 16-10-2020

TOWER C,D,E ELEVATION

Uploaded on: 16-10-2020

TOWER C,D,E FLOOR PLAN

Uploaded on: 16-10-2020

TOWER F AREA 2

Uploaded on: 16-10-2020

TOWER-A SECTION PLAN

Uploaded on: 16-10-2020

TOWER-A ELEVATION

Uploaded on: 16-10-2020

TOWER-B ELEVATION

Uploaded on: 16-10-2020

TOWER-F FLOOR PLAN

Uploaded on: 16-10-2020

TOWER-F SECTION PLAN

Uploaded on: 16-10-2020

SUPERIMPOSE COBAN

Uploaded on: 16-10-2020

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 16-10-2020

EXTERNAL LIGHT & ROAD LAYOUT

Uploaded on: 16-10-2020

FIRE FIGHTNING

Uploaded on: 16-10-2020

SEWAGE LINE

Uploaded on: 16-10-2020

STORM LINE

Uploaded on: 16-10-2020

WATER SUPPLY LINE

Uploaded on: 16-10-2020

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 20-01-2020

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 20-01-2020

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 20-01-2020

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 20-01-2020

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 20-01-2020

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 20-01-2020

REP II

Uploaded on: 14-10-2020

AIRPORT NOC RENEWAL

Uploaded on: 16-10-2020

AIRPORT NOC

Uploaded on: 16-10-2020

ARAVALI NOC

Uploaded on: 16-10-2020

SITE PLAN

Uploaded on: 16-10-2020

TOWER A

Uploaded on: 16-10-2020

Statutory Approvals

BUILDING APPROVAL PLANDate: 25-07-2013Status: ALREADY BEEN OBTAINED
HEIGHT CLEARANCEDate: 20-01-2015Status: ALREADY BEEN OBTAINED
ARAVALI NOCDate: 10-07-2013Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 08-03-2013Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: No
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: No
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: Yes
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: No
STREET LIGHTING PLANApproved: No
PARKING PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSSUBMITTED TO HUDA
WATER SUPPLY SYSTEMSUBMITTED TO HUDA
STORM WATER DRAINAGESUBMITTED TO HUDA
ELECTRICITY SUPPLY SYSTEMSUBMITTED TO HUDA
SEWAGE TREATMENT & GARBAGE DISPOSALSUBMITTED TO HUDA
STREET LIGHTINGSUBMITTED TO HUDA
SECURITY AND FIRE FIGHTINGSUBMITTED TO HUDA
PLAYGROUNDS AND PARKSSUBMITTED TO HUDA
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED
PARKINGSUBMITTED TO HUDA
STPSUBMITTED TO HUDA
UNDER GROUND WATER TANKSUBMITTED TO HUDA
RAIN WATER HARVESTINGSUBMITTED TO HUDA
CIRCULATION ROAD AS PER CONDITIONS OF LICENSESUBMITTED TO HUDA
NURSERY SCHOOLSUBMITTED TO HUDA
OTHERS STP GUARD ROOM ELECTRIC SUB STATION CIVIL WORKSUBMITTED TO HUDA
MAINTENANCE CHARGESSUBMITTED TO HUDA

NOC

ROADSProvider: HARYANA SHAHARI VIKAS PRADHIKARANApproval Status: Pending
WATER SUPPLYProvider: HARYANA SHAHARI VIKAS PRADHIKARANApproval Status: Pending
ELECTRICITYProvider: DAKSHIN HARYANA BIJLI VITRAN NIGAMApproval Status: Pending
SEWAGE DISPOSALProvider: HARYANA SHAHARI VIKAS PRADHIKARANApproval Status: Pending
STORM WATER DRAINAGEProvider: HARYANA SHAHARI VIKAS PRADHIKARANApproval Status: Pending

Project Team

Authorized Representative

VIRENDER VERMA
Name
VIRENDER VERMA
PAN
XXXX501D
Email
md@pareenainfra.com
Mobile
8800693505
Landline
01242219440
Address
Flat no-2 The palms Apartments Sector 6 Dwarka New Delhi South West Delhi DL110075 IN

Managing Director/CEO

SURENDER KUMAR VERMA
Name
SURENDER KUMAR VERMA
PAN
XXXX057J
Email
chairman@pareena.in
Mobile
8800693501
Landline
01242219440
Address
Flat no-3 The palms Apartments Sector 6 Dwarka New Delhi South West Delhi DL110075 IN

Directors

VIRENDER VERMA
Name
VIRENDER VERMA
PAN
XXXX501D
Email
md@pareenainfra.com
Mobile
8800693505
Landline
01242219440
Address
Flat no-2 The palms Apartments Sector 6 Dwarka New Delhi South West Delhi DL110075 IN

Contact Details

Project ContactEmail: info@pareena.inMobile: 9999627997Landline: 01242219440
Project Contact PersonName: VIPLUVEmail: vipluv@pareena.inMobile: 9999627997Landline: 01242219440

Land Details

Land Area10.5875 (Acre)
Proposed FAR174.969
Permissible FAR175
Total Licensed Land10.5875 (Acre)

Land Usage

Land Cost10467.44 Lakhs
Other Cost15420.22 Lakhs
Estimated Project Cost47142.84 Lakhs
Estimated Infrastructure Cost873.83 Lakhs
Estimated Apartment Construction Cost20381.35 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other395.52
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2019 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0---
Construction of circulation road0---
Electricity Supply System0---
Maintenance Charges17.54---
Maintenance charger----
Maintenance charges----
Other5---
Parking1.87---
Parks and Playgrounds1.28---
Rain water harvesting0.86---
Roads & Pavements4.77---
STP0---
School10---
Security and Fire Fighting6.84---
Security and fire fighting----
Sewerage treatment & garbage disposal1.22---
Shopping area0---
Storm Water Drainage3.1---
Street Lighting0---
Street lighting----
Underground water Tank0---
Underground water tank----
Water Supply System5.87---
2020 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres2502025
Construction of circulation road0010.297.21
Electricity Supply System0000
Maintenance Charges----
Maintenance charger-34.9934.9934.99
Maintenance charges0---
Other0102027.5
Parking03.643.643.64
Parks and Playgrounds02.462.462.46
Rain water harvesting01.621.621.62
Roads & Pavements09.459.459.45
STP0014.2210.16
School0202525
Security and Fire Fighting----
Security and fire fighting013.5813.5813.58
Sewerage treatment & garbage disposal02.342.342.34
Shopping area0000
Storm Water Drainage06.16.16.1
Street Lighting----
Street lighting4.88004.88
Underground water Tank----
Underground water tank044.728.9422.38
Water Supply System011.6311.6311.63
2021 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres02524.490
Construction of circulation road0000
Electricity Supply System0000
Maintenance Charges----
Maintenance charger----
Maintenance charges17.49017.4917.49
Other0000
Parking1.8201.821.82
Parks and Playgrounds1.2301.231.23
Rain water harvesting0.8100.810.81
Roads & Pavements4.7204.724.72
STP0000
School0000
Security and Fire Fighting----
Security and fire fighting6.7906.796.79
Sewerage treatment & garbage disposal1.1701.171.17
Shopping area0000
Storm Water Drainage3.0503.053.05
Street Lighting----
Street lighting0000
Underground water Tank----
Underground water tank0000
Water Supply System5.8205.825.82
2022 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Construction of circulation road0000
Electricity Supply System0000
Maintenance Charges----
Maintenance charger----
Maintenance charges17.4917.4917.4917.49
Other0000
Parking1.821.821.821.82
Parks and Playgrounds1.231.231.231.23
Rain water harvesting0.810.810.810.81
Roads & Pavements4.724.724.724.72
STP0000
School0000
Security and Fire Fighting----
Security and fire fighting6.796.796.796.79
Sewerage treatment & garbage disposal1.171.171.171.17
Shopping area0000
Storm Water Drainage3.053.053.053.05
Street Lighting----
Street lighting0000
Underground water Tank----
Underground water tank0000
Water Supply System5.825.825.825.82
2023 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Construction of circulation road0000
Electricity Supply System0000
Maintenance Charges----
Maintenance charger----
Maintenance charges017.4917.4917.49
Other0000
Parking01.821.821.82
Parks and Playgrounds01.231.231.23
Rain water harvesting00.810.810.8
Roads & Pavements04.724.724.71
STP006.094.07
School4.9402525
Security and Fire Fighting----
Security and fire fighting06.796.796.74
Sewerage treatment & garbage disposal01.171.171.15
Shopping area0000
Storm Water Drainage03.053.053.05
Street Lighting----
Street lighting003.253.24
Underground water Tank----
Underground water tank0000
Water Supply System05.825.825.79
2024 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0---
Construction of circulation road----
Electricity Supply System0---
Maintenance Charges----
Maintenance charger----
Maintenance charges----
Other0---
Parking----
Parks and Playgrounds0---
Rain water harvesting----
Roads & Pavements0---
STP----
School0---
Security and Fire Fighting----
Security and fire fighting----
Sewerage treatment & garbage disposal0---
Shopping area0---
Storm Water Drainage0---
Street Lighting----
Street lighting----
Underground water Tank----
Underground water tank----
Water Supply System0---

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES
WALL FINISHING DETAILSOIL BOUND DISTEMPER
KITCHEN DETAILSGRANITE COUNTER, CERAMIC TILES UPTO 2 FT ABOVE COUNTER AND REST OBD
BATHROOM FITTINGSCP FITTING & CHINA WARE
WOOD WORK ETCSEMI MODULAR KITCHEN BELOW COUNTER ONLY.
DOORS AND WINDOS FRAMESPAINTED HARD WOOD DOOR FRAMES WITH FLUSH DOOR SHUTTERS.
GLASS WORKUPVC WITH TOUGHNED GLASS
ELECTRIC FITTINGSNOT PROVIDING
CONDUCTING AND WIRING DETAILSCOPPER WIRING IN RECESSED PVC CONDUIT
CUPBOARD DETAILSNOT PROVIDING
WATER STORAGEUNDER GROUND&OVER HEAD TANKS
LIFT DETAILSPASSENGER & SERVICE LIFTS IN EACH TOWER
EXTERNAL GLAZINGSYES
WINDOWS/GLAZINGSUPVC
DOORSYES
MAIN DOORSDECORATIVE LAMINATED FLUSH DOORS
INTERNAL DOORSPAINTED FLUSH DOORS
AIR CONDITIONINGVRV AIR CONDITIONING IN TOWER-A & B
ELECTRICAL FITTINGSNOT PROVIDING
CNG PIPE LINENOT PROVIDING
PROVISION OF WIFI AND BROADBAND FACILITYNOT PROVIDING
EXTERNAL FINISHING/COLOUR SCHEMETEXTURE PAINT WITH PLEASANT SHADES
INTERNAL FINISHINGNA

Unit-wise Specifications

TOILET
FLOORCERAMIC TILES
WALLSCERAMIC TILES
CEILINGOIL BOUND DISTEMPER
COUNTERSGRANITE COUNTER
SANITARY WARE/CP FITTINGSCP FITTING & CHINA WARE
FIXTURESNOT PROVIDING
KITCHEN
FLOORCERAMIC TILES
WALLSCERAMIC TILES, 2 FT ABOVE COUNTER REST OBD
CEILINGOIL BOUND DISTEMPER
COUNTERSGRANITE COUNTER
FIXTURESSTAINLESS STEEL KITCHEN SINK, SEMI MODULAR KITCHEN BELOW COUNTER ONLY.
KITCHEN APPLIANCESNOT PROVIDING
SIT-OUTS
FLOORCERAMIC TILES
WALLS & CEILINGOIL BOUND DISTEMPER
RAILINGSPAINTED MS RAILING
FIXTURESNOT PROVIDING
BED ROOMS
FLOORVITRIFIED TILES
WALLSOIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
WARDROBESNOT PROVIDING
MASTER TOILET
FLOORCERAMIC TILES
WALLSCERAMIC TILES
CEILINGOIL BOUND DISTEMPER
COUNTERSGRANITE COUNTER
SANITARY WARE/CP FITTINGSCP FITTING & CHINA WARE
FITTING/FIXTURESNOT PROVIDING
MASTER BEDROOM/DRESSROOM
FLOORLAMINATED WOODEN FLOORING
WALLSOIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
MODULAR WARDROBESNOT PROVIDING
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILES
WALLSOIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORCERAMIC TILES
WALLS & CEILINGOIL BOUND DISTEMPER
TOILETCERAMIC TILES
BALCONYCERAMIC TILE FLOORING, EXTERIOR EMULSION ON WALL & CEILING AND MS RAILING

Fee Details

Payment 1
amount:750000
cheque no:6836
draft date:27-07-2017
payable to:HRERA Gurugram
payee bank:IDBI BANK
Payment 2
amount:3289554
cheque no:7989
draft date:09-10-2020
payable to:HRERA Gurugram
payee bank:IDBI BANK