Launch Date
Completion Date
RERA ID
25.42
81.94
NOT APPLICABLE
BOUNDARY WALL COMPLETED WITH COLUMN WITH PILING AND 9 INCH BRICK WORK WITH COMPOUND LED LIGHT AND WHITE WASH
3 METER WIDE SET BACK ROAD MADE WITH CEMENT CONCRETE. APPROACH ROAD UP TO THE PROJECT MADE WITH INTERLOCKING PAVERS OVER WBM.
NOT APPLICABLE
FROM OVERHEAD WATER TANK SUPPLIED BY BOREWELL AS PER WATER SUPPLY PLAN ATTACHED UNDER UPLOAD DOCUMENT SECTION
SEWAGE TREATMENT PLANT (STP) WILL BE SETUP. SEWER SYSTEM PLAN WILL BE PREPARED AS PER SERVICED PLAN OF THE PROJECT
PROPER DRAINAGE NETWORK WILL BE PROVIDED AS PER SERVICES BEING UPLOADED
GREEN AREA AS PER APPROVED MAP
30 NOS (15 ASHOK TREE AND 15 CHITWAN TREE)
INFRASTRUCTURE WILL BE DEVELOPED AS PER PuVVNL. PROJECT ELECTRIC PLAN HAS BEEN ATTACHED IN UPLOAD DOCUMENT SECTION.
NOT APPLICABLE AS PER EWS LIG POLICY
SEWAGE TREATMENT PLANT AND DRAINAGE SYSTEM WILL BE SETUP. DETAILS OF THE PLAN HAS BEEN PROVIDED IN UNDER THE SERVICES PLAN HAS BEEN ATTACHED UNDER UPLOAD DOCUMENT SECTION
WILL BE PROVIDED AS PER NAGAR NIGAM NORMS. DETAILS OF THE PLAN HAS BEEN PROVIDED IN THE SERVICES PLAN IT HAS BEEN ATTACHED IN THE UPLOAD SECTION
RAIN WATER HARVESTING WILL BE PROVIDED AS APPROVED LOCATION AFTER THE COMPLETION OF PROJECT AND APPLICABLE NOC FROM THE BHU JAL GARBH VIBHAG WILL BE TAKEN
50 WATT SOLAR STREET LIGHT WILL BE PROVIDED WITHIN THE COMPOUND AT DESIRED LOCATION AS PER ARCHITECT INSTRUCTION
AS APPLICABLE UNDER FIRE SAFETY NORMS. FIRE EXTINGUISHER AND HOSE REEL WILL BE PROVIDED IN ALL FLOOR. FIRE HYDRANT WILL BE PROVIDED IN SUITABLE LOCATION FOR EASY ACCESS BY FIRE TENDER
NOT APPLICABLE
AS PER APPLICABLE NORMS OF FIRE DEPARTMENT. ASSEMBLY POINT WILL BE PROVIDED IN DESIGNATED AREA
AS APPLICABLE
Showing 6 blocks with 24 units
Total Carpet Area
3185.84 m²
34292.06 ft²
Total Units
112
1 different types
Blocks & Floors
6
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3740.00 m²
40256.99 ft²