Total Units
36
1 unit type
Carpet Area
34,699 ft²
3,223.68 m² · carpet only, excludes balcony
Blocks & Floors
1
2 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 964 ft² (89.55 m²)Balconies 0Parking per unit 0.003 of 28 rows list no units (3 floors are empty), so they add nothing to these totals
All blocks
Showing 28 of 28 rows · 5 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit |
|---|---|---|---|---|
| MULTIPLEX | GF | OTHER | — | — |
| MULTIPLEX | 1 | OTHER | — | — |
| MULTIPLEX | 2 | OTHER | — | — |
| MULTIPLEX | 3 | OTHER | 1 | 4,799 ft²445.82 m² |
| MULTIPLEX | 3 | OTHER | 1 | 800 ft²74.35 m² |
| MULTIPLEX | 3 | OTHER | 1 | 800 ft²74.32 m² |
| MULTIPLEX | 3 | OTHER | 1 | 1,200 ft²111.49 m² |
| MULTIPLEX | 3 | OTHER | 1 | 1,017 ft²94.51 m² |
| MULTIPLEX | 4 | OTHER | 5 | 800 ft²74.33 m² |
| MULTIPLEX | 4 | OTHER | 1 | 797 ft²74.01 m² |
| MULTIPLEX | 4 | OTHER | 1 | 796 ft²73.92 m² |
| MULTIPLEX | 4 | OTHER | 1 | 800 ft²74.31 m² |
| MULTIPLEX | 4 | OTHER | 4 | 800 ft²74.32 m² |
| MULTIPLEX | 4 | OTHER | 1 | 797 ft²74.07 m² |
| MULTIPLEX | 4 | OTHER | 1 | 803 ft²74.57 m² |
| MULTIPLEX | 4 | OTHER | 2 | 802 ft²74.47 m² |
| MULTIPLEX | 4 | OTHER | 1 | 800 ft²74.34 m² |
| MULTIPLEX | 4 | OTHER | 1 | 1,312 ft²121.86 m² |
| MULTIPLEX | 4 | OTHER | 1 | 1,596 ft²148.24 m² |
| MULTIPLEX | 4 | OTHER | 1 | 712 ft²66.15 m² |
| MULTIPLEX | 4 | OTHER | 1 | 958 ft²88.96 m² |
| MULTIPLEX | 4 | OTHER | 2 | 800 ft²74.30 m² |
| MULTIPLEX | 4 | OTHER | 2 | 801 ft²74.41 m² |
| MULTIPLEX | 4 | OTHER | 1 | 799 ft²74.27 m² |
| MULTIPLEX | 4 | OTHER | 1 | 799 ft²74.24 m² |
| MULTIPLEX | 4 | OTHER | 2 | 800 ft²74.36 m² |
| MULTIPLEX | 4 | OTHER | 1 | 794 ft²73.81 m² |
| MULTIPLEX | 4 | OTHER | 1 | 715 ft²66.43 m² |
Total Plot Area
0.135 acres
547.00 m² · plot area
AS PER PLAN
AS PER PLAN
AS PER PLAN
AS PER PLAN
Since municipal water supply may not be expected to fulfill the entire requirement, it is proposed to meet the total water requirement for the campus by other source/external supply such as bore wells etc. Water shall be passed through a multi grade filter, softened and chlorinated prior to the supply to the buildings
Soil & Waste from Toilet & Kitchen will be collected separately for soil & waster pipe line and after that sewer pipe line laid underground with manhole & connected to Centralized STP
Separate line for rain water with Harvesting pit & Other line for soil & waste and connected to STO
AS PER PLAN
AS PER PLAN
Efficient & Effective design of substation with 100% Power back up & street light in walk way and parks . Adequate design to reduce losses in transmission & distribution .
AS PER PLAN
Sewer water treatment through Centralized STP with their disposal arrangement
AS PER PLAN
VFD based hydro pneumatic pumps used with sensor , treated STP water used for flushing & Horticulture
VFD based Pumps & equipment selected on best energy efficient point . Photoelectric senor used for external and common area light with provision of solar energy
Internal & external hydrant system , sprinkler ,Heat Detector, smoke detector MCP & Fire Extinguishers in all floors . As per Fire norms
AS PER PLAN
AS PER PLAN
AS PER PLAN
Boulevard Walk (Phase 4) is located in Sector 4, Greater Noida West.
Yes. Boulevard Walk (Phase 4) is registered under UPRERAPRJ15654 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Boulevard Walk (Phase 4) is 29 March 2023.
Boulevard Walk (Phase 4) is developed by REGAL EMPORIA INFRATECH PRIVATE LIMITED.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.