OngoingActive

Bliss Homes and Bliss Square

Ghaziabad, Uttar Pradesh
01-05-2016
Launch Date
Ongoing
Type
14-01-2023
Completion Date

Overview

Launch Date

01-05-2016

Completion Date

14-01-2023

RERA ID

UPRERAPRJ5577

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)12620
Project NameBliss Homes and Bliss Square
Registration Fee (in Rs.)68500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)81
DistrictGhaziabad
Original Start Date01-05-2016
TehsilGhaziabad
Proposed Start Date01-05-2016
Sanctioning Competent AuthorityGhaziabad Development Authority
Project Cost (in Lacs)25000
Proposed Completion Date14-01-2023

Location

Latitude

28.69004863535252

Longitude

77.48357024705994

Bank Details

Account no.50200027548177
Name Of Account HolderMSS infracon Private Limited
Bank NameHDFC BANK
Branch AddressD-44, RDC RAJNAGAR, GHAZIABAD
Branch NameD-44, RDC RAJNAGAR, GHAZIABAD
IFSC CodeHDFC0000153

Development Works

Demarcation of Plots

As per approved plan of GDA 12 meter wide road and houses in North, others land in South 45 meter wide road in East and High School in West

Boundary Wall

A combination of RCC and brick work in 2.1 meter high boundary wall with 60 centimeter high MS barbed wire fencing in residential area and 3 ft high hedge in commercial area.

Road Work

Road work 100 mm thick trimix over RCC.

Footpaths

Footpaths with pavers.

Water Supply Including Drinking Water Facilities

Nagar nigam ghaziabad has agreed to provide drinking water connection vide Dated :- 4th may 2015 required connection charges amounting to rupees one lakh seventeen thousand only have already been paid

Sewer System

Sewage of different towers shall be collected in a chamber which will we connected to nagar nigam sewerage network.( Permission has been granted by Nagar Nigam and the required amount Rupees Four lakh thirty thousand twenty five only for connection has been paid.)

Drain

KC type drains have been provided on both side of road.

Parks

Green lush environment has been proposed in open land with grass carpeting ,flowers beds and water bodies.

Tree Planting

Low height plants have been provided on both sides of road wherever possible.

Design For Electric Supply Including Street Lighting

Has been done and accordingly works including external lightning has been proposed.

Community Buildings

Not Applicable

Treatment and Disposal System of Sewage and Sullage water

Disposal into Nagar Nigam Existing Sewerage line.

Solid Waste Management And Disposal System

Door to door collection of solid waste has been proposed

Water Conservation System

Rain water harvesting has been provided.

Energy Management System Including Use of Renewable Energy

Solar energy system for street lights has been provided.

Fire Protection And Fire Safety System

Fire protection and fire safety system has been provided in residential and commercial part.

Social Infrastructure And Other Public Amenities Including Public Health Services

Gym, Club House, Badminton Port, basket Ball, Kids Playground and swimming pool etc. has been provided.

Emergency Evacuation Services

Separate staircase from Top to upper ground floor has been provided in each tower.

Other Miscellaneous Work

24 hours security, intercom system in residential , power backup, sufficient parking has been provided.

Documents

Sale Deed

No: 7691 | Date: 02-06-2015

Details of Encumbrances

Proforma of Completion Certificate(Occupancy)

Commencement Certificate

Uploaded: 02-07-2018

Proforma of Conveyance Deed

Uploaded: 05-07-2018

Waste Disposal Plan

Uploaded: 05-07-2018

Water Supply Plan

Uploaded: 05-07-2018

Electricity Supply Plan

Uploaded: 05-07-2018

Development Work Plan

Uploaded: 05-07-2018

Affidavit

Uploaded: 02-07-2018

CA CERTIFICATE

Uploaded: 06-07-2018

ARCHITECT CERTIFICATE

Uploaded: 06-07-2018

ENGINEERS CERTIFICATE

Uploaded: 06-07-2018

Registry Document In Case of Own Land

Uploaded: 30-07-2017

Authentic copy of Approval of Project

Uploaded: 30-07-2017

Proforma of Application Form

Uploaded: 30-07-2017

Proforma of Allotment Letter

Uploaded: 30-07-2017

Other Plan(If Any)

Uploaded: 11-10-2017

Authentic copy of Approval of Project

Uploaded: 10-01-2018

Authentic copy of Approval of Project

Uploaded: 10-01-2018

Authentic copy of Approval of Project

Uploaded: 10-01-2018

Authentic copy of Approval of Project

Uploaded: 10-01-2018

Authentic copy of Approval of Project

Uploaded: 10-01-2018

Authentic copy of Approval of Project

Uploaded: 10-01-2018

Authentic copy of Approval of Project

Uploaded: 10-01-2018

Authentic copy of Approval of Project

Uploaded: 10-01-2018

Authentic copy of Approval of Project

Uploaded: 10-01-2018

Authentic copy of Approval of Project

Uploaded: 10-01-2018

Authentic copy of Approval of Project

Uploaded: 10-01-2018

Authentic copy of Approval of Project

Uploaded: 10-01-2018

Authentic copy of Approval of Project

Uploaded: 10-01-2018

Authentic copy of Approval of Project

Uploaded: 10-01-2018

Authentic copy of Approval of Project

Uploaded: 10-01-2018

Authentic copy of Approval of Project

Uploaded: 10-01-2018

Authentic copy of Approval of Project

Uploaded: 10-01-2018

Authentic copy of Approval of Project

Uploaded: 10-01-2018

Authentic copy of Approval of Project

Uploaded: 10-01-2018

Permits

Orignal Permit No57 / 746 / Zone-3/ 15-16
Orignal Permit Date17-10-2015
Valid Upto16-10-2020
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto-
End Date14-01-2023
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit No57 / 746 / Zone-3/ 15-16
Orignal Permit Date17-10-2015
Valid Upto16-10-2020
Revalidated Permit No350/Masterplan Zone 3/2020
Revalidated Permit Date23-10-2020
Revalidated Permit Valid Upto16-10-2023
Permit Extendable Upto16-10-2023
End Date14-01-2023
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)M/s SS Infratech
Contractor Address31 Omaxe Arcade Gold link-1, Greater NOIDA, UP
Architect NameAnurag Gupta
Architect AddressVastu Srijan, KB-34, Expreson tower, Sec-14, Kaushambi, Gaziabad
Architect Licence NumberCA/85/9138
Structural Engineer NameKamal Sabarwal
Structural Engineer Address175, Pocket-E, Mayur Vihar Phase-II, Delhi-110091
Mobile number(Project Co-ordinator)9599592520

Land Details

AFS

Showing 4 blocks with 314 units

Property Summary

Total Carpet Area

27462.96 m²

295608.56 ft²

Total Units

525

5 different types

Blocks & Floors

4

21 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:52.31 m²
Balconies:258
Parking ratio:0.00 per unit

Block Tower A & B

271 units

Block Tower C

14 units

Block Tower C1

15 units

Block Tower C2

14 units

Khasra Details

Total Area

12620.00 m²

135840.42 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoPlot NO.ML-1,Karpuripuram
Area(In Sq. Mt.)12620

Other Details

Contractor Name (if any)M/s SS Infratech
Contractor Address31 Omaxe Arcade Gold link-1, Greater NOIDA, UP
Architect NameAnurag Gupta
Architect AddressVastu Srijan, KB-34, Expreson tower, Sec-14, Kaushambi, Gaziabad
Architect Licence NumberCA/85/9138
Structural Engineer NameKamal Sabarwal
Structural Engineer Address175, Pocket-E, Mayur Vihar Phase-II, Delhi-110091
Mobile number(Project Co-ordinator)9599592520