NewActive

ATTALIKA

Ghaziabad, Uttar Pradesh
01-02-2023
Launch Date
New
Type
31-12-2027
Completion Date

Overview

Launch Date

01-02-2023

Completion Date

31-12-2027

RERA ID

UPRERAPRJ149247

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)16396
Project NameATTALIKA
Registration Fee (in Rs.)87000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)59
DistrictGhaziabad
Original Start Date-
TehsilGhaziabad
Proposed Start Date01-02-2023
Sanctioning Competent AuthorityGhaziabad Development Authority
Project Cost (in Lacs)47000
Proposed Completion Date31-12-2027

Location

Latitude

28.6502881

Longitude

77.3444772

Bank Details

Account Details
Name of the AccountRREPL MASTER COLLECTION A/C ATTALIKA
Account Number50200077257551
Bank NameHDFC BANK LTD
Branch NameVAISHALI
Branch AddressVAISHALI BRANCH VC - 1, SECTOR - 1,
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeHDFC0000422
Separate Account Details
Name of the AccountRREPL SEPARATE A/C ATTALIKA
Account Number50200077257580
Bank NameHDFC BANK LTD
Branch NameVAISHALI GHAZIABAD
Branch AddressVAISHALI, VC-1, SECTOR - 1, VAISHALI
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeHDFC0000422
Transaction Account Details
Name of the AccountRREPL TRANSACTION A/C ATTALIKA
Account Number50200077237968
Bank NameHDFC BANK LTD
Branch NameVAISHALI GHAZIABAD
Branch AddressVC - 1, SECTOR - 1, VAISHALI
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeHDFC0000422

Development Works

Demarcation of Plots

EAST SIDE - 180.878, WEST SIDE - 184.248, NORTH SIDE - 91.321, SOUTH SIDE - 88.350

Boundary Wall

RCC COLUMN AND BEAM STR. WITH BRICK WORK MS RAILING (150 MM RCC OR 230 MM BRICK WORK)

Road Work

CEMENT CONCRETE/ CONCRETE PAVERS WITH AVERAGE THICKNESS OF 150MM

Footpaths

CEMENT CONCRETE/ CONCRETE PAVERS WITH 60 - 80 MM THICKNESS

Water Supply Including Drinking Water Facilities

UNDERGROUND AND OVERHEAD WATER TANKS ARE PROVIDED AND CONNECTION TO EACH AND EVERY TOILET AND KITCHEN

Sewer System

WELL - LAID INTERCONNECTED SEWER LINES WILL BE PROVIDED WHICH ARE FURTHER CONNECTED TO THE SEWER LINE LAID BY THE GDA FURTHER TREATMENT IN THE STP LOCATED IN INDIRAPURAM

Drain

DRAINAGE SYSTEM WILL BE PROVIDED ON THE BASIS OF COMPLIANCE OF NBC WITH CALCULATION OF DISCHARGE

Parks

15 PERCENT GREEN AREA PROVIDED WITH OUTDOOR AMENITIES OF PLAY AREA

Tree Planting

TREE PLANTATIONS WITH EVERGREEN AND SEASONAL CATEGORY

Design For Electric Supply Including Street Lighting

ELECTRICAL SUPPLY SYSTEM WILL BE PROVIDED ACCORDING TO THE ELECTRICAL LOAD CALCULATION ON THE DATA PROVIDED BY THE MULTI METERING SYSTEM/ SINGLE POINT METERING SYSTEM WERE THE CONNECTION SHOULD BE PROVIDED BY THE PVVNL DIRECT TO THE FLAT OWNER AT THE TIME OF COMPLETION.

Community Buildings

COMMUNITY HALL WITH INDOOR FACILITY AND RECREATIONAL ACTIVITY IS PROVIDED

Treatment and Disposal System of Sewage and Sullage water

SEWAGE AND SULLAGE SHALL BE DISCHARGED TO THE STP PROVIDED BY GDA IN INDIRAPURAM

Solid Waste Management And Disposal System

ORGANIC WASTE COMPOSER IS PROVIDED WITH DRY AND WET SEGREGATION MECHANISM

Water Conservation System

RAIN WATER HARVESTING AND RECHARGE WELL BASED ON TOTAL SURFACE RUN AND FURTHER OVERFLOW IS TO BE CONNECTED TO THE RECHARGE WELL

Energy Management System Including Use of Renewable Energy

PROVISION OF V.F.D (VARIABLE FREQUENCY DRIVE) IN PUMP ROOM FOR PUMPING THE DOMESTIC AND FLUSHING WATER TO MINIMIZE THE ENERGY REQUIREMENT.

Fire Protection And Fire Safety System

FIRE FIGHTING SYSTEM AND PROTECTION SYSTEM WILL BE PROVIDED AS PER NBC AND NOC FROM UP FIRE SERVICE. INSTALLATION OF SPRINKLES SHALL BE DONE IN EACH FLATS

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

FIRE TENDER ROAD AND FIRE ESCAPE STAIRCASE WILL BE PROVIDED

Other Miscellaneous Work

NA

Documents

Extract of Khatauni

No: 1429-1434 | Date: -

Registry Document

No: 5181 | Date: 11-08-2022

Details of Encumbrances

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 25-01-2023

Commencement Certificate

Uploaded: 18-01-2023

Other Plan(If Any)

Uploaded: 18-01-2023

Proforma of Application Form

Uploaded: 19-01-2023

Proforma of Allotment Letter

Uploaded: 18-01-2023

Proforma of Conveyance Deed

Uploaded: 18-01-2023

Waste Disposal Plan

Uploaded: 18-01-2023

Water Supply Plan

Uploaded: 18-01-2023

Electricity Supply Plan

Uploaded: 18-01-2023

Development Work Plan

Uploaded: 18-01-2023

Affidavit

Uploaded: 25-01-2023

CA CERTIFICATE

Uploaded: 19-01-2023

ARCHITECT CERTIFICATE

Uploaded: 18-01-2023

ENGINEERS CERTIFICATE

Uploaded: 18-01-2023

Other

Uploaded: 18-01-2023

Permits

Orignal Permit NoGDA/BP/22-23/0426
Orignal Permit Date03-01-2023
Valid Upto02-01-2028
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto01-01-2031
End Date31-12-2027
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit NoGDA/BP/22-23/0426
Orignal Permit Date03-01-2023
Valid Upto02-01-2028
Revalidated Permit NoGDA/BP/22-23/0426
Revalidated Permit Date03-01-2023
Revalidated Permit Valid Upto05-10-2028
Permit Extendable Upto05-10-2030
End Date31-12-2027
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit NoGDA/BP/22-23/0426
Orignal Permit Date03-01-2023
Valid Upto02-01-2028
Revalidated Permit NoGDA/BP/22-23/0426
Revalidated Permit Date03-01-2023
Revalidated Permit Valid Upto05-10-2028
Permit Extendable Upto05-10-2030
End Date31-12-2027
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)AYUSH CONSTRUCTIONS
Contractor AddressFLAT NO.32, 3 FLOOR, T-1, G.C EMERALD HEIGHTS, RAMPRASTHA GREENS, VAISHALI, U.P
Architect NameRD DESIGN ATRIUM - ROHIT DABAS - RAHUL GUPTA
Architect AddressD - 1, FIRST FLOOR, SECTOR - 7, NOIDA, U.P - 201301
Architect Licence NumberCA/2016/76810, CA/2010/48921
Structural Engineer NameOPTIMUM DESIGN PVT. LTD.
Structural Engineer AddressB - 24, SECTOR - 67,NOIDA - 201301
Mobile number(Project Co-ordinator)9811134242

Land Details

AFS

Showing 4 blocks with 173 units

Property Summary

Total Carpet Area

50293.48 m²

541353.99 ft²

Total Units

349

4 different types

Blocks & Floors

4

30 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:144.11 m²
Balconies:737
Parking ratio:0.00 per unit

Block TOWER A

57 units

Block TOWER B

56 units

Block TOWER C

57 units

Block TOWER D

3 units

Khasra Details

Total Area

16396.00 m²

176484.90 ft²

7 plots
Khasra
TypeKhasra
Khasra/Plot No197M
Area(In Sq. Mt.)1500
Khasra
TypeKhasra
Khasra/Plot No209M
Area(In Sq. Mt.)5270
Khasra
TypeKhasra
Khasra/Plot No210M
Area(In Sq. Mt.)328
Khasra
TypeKhasra
Khasra/Plot No211M
Area(In Sq. Mt.)400
Khasra
TypeKhasra
Khasra/Plot No212M
Area(In Sq. Mt.)2600
Khasra
TypeKhasra
Khasra/Plot No214M
Area(In Sq. Mt.)1958
Khasra
TypeKhasra
Khasra/Plot No215M
Area(In Sq. Mt.)4340

Other Details

Contractor Name (if any)AYUSH CONSTRUCTIONS
Contractor AddressFLAT NO.32, 3 FLOOR, T-1, G.C EMERALD HEIGHTS, RAMPRASTHA GREENS, VAISHALI, U.P
Architect NameRD DESIGN ATRIUM - ROHIT DABAS - RAHUL GUPTA
Architect AddressD - 1, FIRST FLOOR, SECTOR - 7, NOIDA, U.P - 201301
Architect Licence NumberCA/2016/76810, CA/2010/48921
Structural Engineer NameOPTIMUM DESIGN PVT. LTD.
Structural Engineer AddressB - 24, SECTOR - 67,NOIDA - 201301
Mobile number(Project Co-ordinator)9811134242