will be done by total station
boundary wall of 1500 mm height will be constructed with RCC column, brick work etc.
internal road will be constructed with RCC trimix , pavers and stone.
footpath will be constructed with pavers and stone.
Drinking water will be provided by borewell and it will be stored in under ground / overhead water tanks.
proper sewerage system will be constructed using R.C.C/H.D.P.E pipes as per drawings.
draining system will be constructed using R.C.C/H.D.P.E pipes as per drawings.
NA as it is a small commercial plot
total 24 local tree will be planted
HT electrical supply will be made by UPPCL/competent authority, a sub-station will be set-up on project as per drawing and LT electrical supply will be available for individual unit. sufficient power back-up arrangement will be made using DG sets. street lighting will be done using LT supply/power back-up.
NA as it is a commercial building.
STP will be installed in basement for sullage and treatment system.
solid waste will be collected manually and disposal will be done as per norms.
water conservation will be done by rain water harvesting system.
Good quality and approved brand equipments will be used in sub-station to minimise energy loss and solar energy system will be installed as per norms and approved drawings.
Fire fighting system including hydrant, sprinkle system, and fire alarms will be installed as per norms/NOC. fire escape staircase will be constructed as per drawings.
NOT APPLICABLE
Fire staircase and refuge area will provide as per requirement for evacuation in case of any emergency.
as per requirement on period of time.
Showing 1 blocks with 75 units
Total Carpet Area
3096.65 m²
33332.03 ft²
Total Units
129
2 different types
Blocks & Floors
1
5 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
2225.52 m²
23955.27 ft²