Launch Date
Completion Date
RERA ID
28.711870
77.426259
North East - Others Plot, North West - 30 meter Road, South other plot
2.5 mtr high RCC boundary wall
Bitumin (6 meter wide) is used to complete the road work of whole project
interlocking tyles is used for footpath in this project
HDPE SDR-11 Pipes used for drinking water facility
DWC HDPE pipes connected to the nagar nigam Sever system
Drain line connected to the nagar nigam Drain Line
As per Ghaziabad Development Authority Green area is not applicable in this project
As per Ghaziabad Development authority green area is not applicable in this project
Solar light is used for street lighting height of pole is 3 mtr and 5 mtr design of electricity as per UPPCL guidelines
NA
STP is not Required in this project
Authorized vendor of nagar nigam will be appointed to collect the waste of project
Rain water harvesting recharge pit avilable to recharge to under ground water recharge
Solar street lighting provide for street lighting
Privisional Fire noc Get from FSO Ghaziabad and all of the work will be completed as per NBC Code 2016
Labour cess has been submitted in Ghaziabad Development Authority at the time of Map Sanction
Whole of the project design as per NBC Code 2016
Will be completed before the completion
Showing 1 blocks with 117 units
Total Carpet Area
3278.84 m²
35293.11 ft²
Total Units
114
2 different types
Blocks & Floors
1
11 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
1555.00 m²
16737.86 ft²