NewActive

Aradhyam Shopping Mall

Ghaziabad, Uttar Pradesh
03-10-2022
Launch Date
New
Type
29-08-2029
Completion Date

Overview

Launch Date

03-10-2022

Completion Date

29-08-2029

RERA ID

UPRERAPRJ429892

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)4414
Project NameAradhyam Shopping Mall
Registration Fee (in Rs.)55000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)83
DistrictGhaziabad
Original Start Date-
TehsilGhaziabad
Proposed Start Date03-10-2022
Sanctioning Competent AuthorityGhaziabad Development Authority
Project Cost (in Lacs)2735
Proposed Completion Date29-08-2029

Location

Latitude

28.69475556

Longitude

77.34304722

Bank Details

Account Details
Name of the AccountAradhyam Builders- Collection Account for Aradhyam Shopping Mall
Account Number41340762284
Bank NameSBI Bank
Branch NameNavyug Market
Branch AddressNavyug Market, Ghaziabad
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeSBIN0009298
Separate Account Details
Name of the AccountAradhyam Builders- Separate Bank Account for Aradhyam Shopping Mall
Account Number41259568235
Bank NameSBI Bank
Branch NameNavyug Market
Branch AddressNavyug Market, Ghaziabad
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeSBIN0009298
Transaction Account Details
Name of the AccountAradhyam Builders- RERA Transaction Account for Aradhyam Shopping mall
Account Number41340761520
Bank NameSBI Bank
Branch NameNavyug Market
Branch AddressNavyug Market, Ghaziabad
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeSBIN0009298

Development Works

Demarcation of Plots

Plot-A, Khasra no. 358m, 462m, 493m, village Pasonda , Ghaziabad, Uttar Pradesh. Total plot area= 4413.65 Sq. Mtr. (less road widening area 351.18 Sq. Mtr.)

Boundary Wall

230mm wide and 2.1 metre high earthquake resistant boundary wall of RCC/Mild steel/ Brick filled.

Road Work

All roads in the complex will be in combination of concrete pavers of different colours, shape, thickness. Roads will be laid over 225mm water bound macadam.

Footpaths

All footpaths in the complex will be in combination of concrete pavers of different colours, shape and thickness of 65mm and 80mm laid over 150mm water bound macadam surface.

Water Supply Including Drinking Water Facilities

Potable water supply from municipal water supply shall be collected in underground collection tank and pumped to overhead water tank. The supply of water to individual shops shall be from the said overhead water tanks.

Sewer System

The sewage will be collected through a soil pipeline arrangement, bends and inspection chambers leading to the sewage water treatment plant (STP) of the project and the treated water will be used for irrigation and flushing purpose.

Drain

Drains having a minimum width of 150mm will be provided for collection and channelisation of rain water (surface runoff).

Parks

Internal parks will be provided and miantained.

Tree Planting

The trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora and vegetation shall be as per the climatic conditions. Tress will be planted in a manner to ensure that there is no hindrance in the services/ usage of the project.

Design For Electric Supply Including Street Lighting

Electric supply provided through 11/0.433 KV transformers and by DG set supply for backup.

Community Buildings

Not applicable

Treatment and Disposal System of Sewage and Sullage water

Sewage shall be treated in Sewage Treatment Plant (STP) and thereafter treated water to be used for irrigation and flushing purpose.

Solid Waste Management And Disposal System

Solid waste to be collected from individual shops and stored in garbage room. Recyclable shall be processed in the compost machine to make compost. Non recyclable waste shall be disposed of through approved agents.

Water Conservation System

Rain water harvesting pit shall be provided for ground water recharging and overflow to be discharged in the municipal drains. treated sewage shall be used for irrigation and flushing purpose.

Energy Management System Including Use of Renewable Energy

Single/ Multi point metering will be there for energy purchased from the grid/ power supply company.

Fire Protection And Fire Safety System

Sprinkler, fire doors, yard hydrants, smoke detector and fire alarm system will be provided as applicable.

Social Infrastructure And Other Public Amenities Including Public Health Services

Not applicable

Emergency Evacuation Services

Fire staircases shall be provided as per the approved fire drawing for evacuation to open areas.

Other Miscellaneous Work

Not applicable

Documents

Registry Document

No: 16953 | Date: 18-07-2022

Registry Document

No: 3468 | Date: 23-08-2018

Registry Document

No: 13791 | Date: 23-08-2018

Extract of Khatauni

No: 1424-1429 | Date: -

Extract of Khatauni

No: 1424-1429 | Date: -

Extract of Khatauni

No: 1424-1429 | Date: -

Proforma of Completion Certificate(Occupancy)

Other

Details of Encumbrances

Uploaded: 19-10-2022

Commencement Certificate

Uploaded: 19-10-2022

Other Plan(If Any)

Uploaded: 19-10-2022

Proforma of Application Form

Uploaded: 19-10-2022

Proforma of Allotment Letter

Uploaded: 19-10-2022

Proforma of Conveyance Deed

Uploaded: 19-10-2022

Waste Disposal Plan

Uploaded: 19-10-2022

Water Supply Plan

Uploaded: 19-10-2022

Electricity Supply Plan

Uploaded: 19-10-2022

Development Work Plan

Uploaded: 19-10-2022

Affidavit

Uploaded: 19-10-2022

CA CERTIFICATE

Uploaded: 19-10-2022

ARCHITECT CERTIFICATE

Uploaded: 19-10-2022

ENGINEERS CERTIFICATE

Uploaded: 19-10-2022

Permits

Orignal Permit No230, MAP NO. 09/PMAY GDA/ M.P./2018
Orignal Permit Date31-08-2021
Valid Upto30-08-2026
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto29-08-2029
End Date29-08-2029
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Naveen Tiwari
Contractor AddressJ-2, Mahinder Enclave, Shastri Nagar, Ghaziabad, Uttar Pradesh
Architect NameAnuj Agarwal
Architect AddressA-244, Kaushambi, Ghaziabad, Uttar Pradesh
Architect Licence NumberCA/96/19503
Structural Engineer NameAkhilesh Singh
Structural Engineer AddressCombined Engineering and Consulting Services, Pkt.-8, Plot No.- 245, Sector-23, Rohini, New Delhi- 85
Mobile number(Project Co-ordinator)9999562761

Land Details

AFS

Showing 1 blocks with 108 units

Property Summary

Total Carpet Area

2591.45 m²

27894.11 ft²

Total Units

111

2 different types

Blocks & Floors

1

4 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:23.35 m²
Balconies:0
Parking ratio:0.00 per unit

Block Aradhyam Shopping Mall

108 units

Khasra Details

Total Area

4413.65 m²

47508.09 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No358m, 462m, 493m, 494m
Area(In Sq. Mt.)4413.65

Other Details

Contractor Name (if any)Naveen Tiwari
Contractor AddressJ-2, Mahinder Enclave, Shastri Nagar, Ghaziabad, Uttar Pradesh
Architect NameAnuj Agarwal
Architect AddressA-244, Kaushambi, Ghaziabad, Uttar Pradesh
Architect Licence NumberCA/96/19503
Structural Engineer NameAkhilesh Singh
Structural Engineer AddressCombined Engineering and Consulting Services, Pkt.-8, Plot No.- 245, Sector-23, Rohini, New Delhi- 85
Mobile number(Project Co-ordinator)9999562761