NEWActive

ALURA

GURUGRAM, WAZIRABAD ST
01-09-2025
Launch Date
NEW
Type
2034-01-01
Completion Date

Overview

Launch Date

01-09-2025

Completion Date

2034-01-01

Configurations

4 BHK, 5 BHK, 6 BHK

Sizes

7000 - 15000 sq.ft.

Project Size

2 Buildings - 245 units

Total Floors

44

Launch Price

32000 /sq.ft

Current Price

32000 /sq.ft

RERA ID

RERA-GRG-2049-2025

Basic Details

Project NameALURA
Project IDRERA-GRG-2049-2025
Project TypeNEW
Applicant TypeCompany
Submission Date01-09-2025 06:15:20 PM
Builder NamePIONEER URBAN LAND AND INFRASTRUCTURE LTD
CINU65910HR1985PLC101301
PANXXXX576B
Emailrbohra@pioneerurban.in
Websitehttps://alura.co.in/
Phone (Mobile)8130653232
Phone (Landline)01242712000
Registered AddressPIONEER SQUARE, GROUND FLOOR NEAR GOLF COURSE EXTENSION ROAD, SECTOR 62
Project AddressSECTOR 62, VILLAGE GHATA, GURUGRAM
DistrictGURUGRAM
TehsilWAZIRABAD ST

Location

Floor Plan

Loading
Configuration
Super Area
Unit Details
Carpet Area
3907 sq.ft
Built Up Area
N/A
Carpet Efficiency
56%
Built Up Efficiency
N/A
Parkings
4

Bank Details

Bank NamePIONEER URBAN LAND & INFRASTRUCTURE LTD ALURA COLLECTION ACCOUNT
Account Number777705957022
IFSC CodeICIC0000021
MICR Code110229003
Branch Code0021

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Mr. Manish Periwal - R/O 9 New Road, Alipore, Kolkata, West Bengal Mr. Rishabh Periwal, 9 New Road, Alipore, Kolkata, West Bengal Mr. Sumit Agarwalla, Flat No D 207, Ashlana The Heritage, Sector 4 Vaishali, Ghaziabad Mr. Ramakant Gupta, Sudha Apartment, 52, Sukanta Sarani, Bhadarkali Hoghly, West Bengal
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Yes

Development Details

Land Area6.99025 (Acre)
Proposed FAR3.65
Permissible FAR3.65
Total Licensed Land24.47775 (Acre)

Land Usage

PLOTS TO BE SOLD0.00
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS8270.97
CONSTRUCTION OF ROADS3963.90
PAVEMENTS0.00
PARKS AND PLAYGROUNDS10629.08
GREEN BELTS0.00
VEHICLE PARKINGS0.00
ELECTRICITY SUB-STATION0.00
CLUB HOUSE0.00
SEWAGE AND SOLID WASTE TREATMENT FACILITY0.00
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0.00
ANY OTHER0.00
CONSTRUCTIONOFCIRCULARROADASPERCONDITIONSOFLICENSE5422.79
Total28286.74

Cost Details

Land Cost1970.27 Lakhs
Other Cost131368.83 Lakhs
Estimated Project Cost305951.05 Lakhs
Estimated Infrastructure Cost9122.01 Lakhs
Estimated Apartment Construction Cost163489.94 Lakhs

Documents

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 31-08-2025

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 31-08-2025

ZONING PLAN

Uploaded on: 31-08-2025

DEMARCATION PLAN

Uploaded on: 31-08-2025

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 31-08-2025

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 31-08-2025

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 31-08-2025

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 31-08-2025

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 31-08-2025

34,36,38 FP & AC TOWER-WEST

Uploaded on: 04-11-2025

1ST FLOOR PLAN ( CLUB)

Uploaded on: 04-11-2025

39TH (DUPLEX) 40TH (UPPER DUPPLEX) FP AC TOWER-WEST

Uploaded on: 04-11-2025

SEWERAGE LAYOUT

Uploaded on: 04-11-2025

BASEMENT-04 AREA CALCULATION

Uploaded on: 04-11-2025

21ST AND 32ND LOWER DUPLEX FLOOR PLAN AND AREA CALCULATION - TOWER EAST

Uploaded on: 04-11-2025

LC 199 OF 2008 WITH ALL RENEWALS

Uploaded on: 04-11-2025

BASEMENT-02 AREA CALCULATION

Uploaded on: 04-11-2025

FIRE SCHEME DRAWING 10

Uploaded on: 04-11-2025

GROUND COVERAGE AREA CALCULATION ( CLUB)

Uploaded on: 04-11-2025

BASEMENT-01 ( AREA CALCULATION )

Uploaded on: 04-11-2025

BASEMENT-1 FLOOR PLAN

Uploaded on: 04-11-2025

BASEMENT-3 FLOOR PLAN

Uploaded on: 04-11-2025

SERVICES FLOOR & TERRACE ( CLUB)

Uploaded on: 04-11-2025

SERVICES FLOOR PLAN ( CLUB)

Uploaded on: 04-11-2025

MUMTY ROOF-TOWER-WEST

Uploaded on: 04-11-2025

1ST FLOOR AREA CALCUTAION ( CLUB)

Uploaded on: 04-11-2025

BASEMENT-02 FLOOR PLAN

Uploaded on: 04-11-2025

BASEMENT-03 AREA CALCULATION

Uploaded on: 04-11-2025

BASEMENT-04 FLOOR PLAN

Uploaded on: 04-11-2025

CLUB SECTION 2 & 3

Uploaded on: 04-11-2025

GF AREA CALCULATION (CLUB)

Uploaded on: 04-11-2025

GF PLAN & SWIMMING POOL SEC ( CLUB)

Uploaded on: 04-11-2025

SITE PLAN FOR SERVICES

Uploaded on: 04-11-2025

TERRECE PLAN & MUMTY AREA-WEST TOWER

Uploaded on: 04-11-2025

SECTION-2 TOWER-WEST

Uploaded on: 04-11-2025

TERRACE FLOOR PLAN & MUMMTY -EAST

Uploaded on: 04-11-2025

LC 239 WITH ALL RENEWALS

Uploaded on: 04-11-2025

WATER SUPPLY LAYOUT

Uploaded on: 04-11-2025

COMBINED ZONING MAP

Uploaded on: 04-11-2025

SITE PLAN-FIRE

Uploaded on: 04-11-2025

SECTION-1 TOWER-WEST

Uploaded on: 04-11-2025

ELEVATION-04 ( TOWER-EAST , WEST & CLUB)

Uploaded on: 04-11-2025

ELEVATION-03 (TOWER WEST,EAST & CLUB)

Uploaded on: 04-11-2025

BR III

Uploaded on: 04-11-2025

PHASING PLAN APPROVED DRAWING

Uploaded on: 04-11-2025

ELEVATION-02 (TOWER-EAST, WST & CLUB)

Uploaded on: 04-11-2025

ELEVATION-01 (TOWER-WEST,EAST & CLUB)

Uploaded on: 04-11-2025

37TH FP &AC TOWER-WEST

Uploaded on: 04-11-2025

32 & 35 (REFUGE)FP AC TOWER-WEST

Uploaded on: 04-11-2025

23RD (UPPER DUPLEX) FP &AC -TOWER WEST

Uploaded on: 04-11-2025

17,20,24,28 (REFUGE)FLOOR PLAN AND AREA CAL-WEST TOWER

Uploaded on: 04-11-2025

12 & 31ST (UPPER DUPLEX) FP &AC TOWER-WEST

Uploaded on: 04-11-2025

11TH & 30TH; (DUPLEX)FP AC TOWER-WEST

Uploaded on: 04-11-2025

2,3,5-7,9,13-15 FLOOR PLAN & AREA CAL-EAST TOWER

Uploaded on: 04-11-2025

10TH(LOWER DUPLEX) FLOOR PLAN & AREA CALCULATION - TOWER EAST

Uploaded on: 04-11-2025

TYPICAL(4TH, 8TH, 12TH, 16TH & 19TH) FLOOR PLAN, AREA CALCULATION - TOWER EAST

Uploaded on: 04-11-2025

SECTION 02-EAST

Uploaded on: 04-11-2025

SECTION 01-EAST TOWER

Uploaded on: 04-11-2025

SCHEMATIC DIAGRAM ( TOWER-EAST, WEST & CLUB)

Uploaded on: 04-11-2025

38TH REFUGE ( LOWER DUPLEX & 39TH ( UPPER DUP) AREA-EAST

Uploaded on: 04-11-2025

36TH FLOOR PLAN-EAST (2)

Uploaded on: 04-11-2025

35TH, 37TH FLOOR PLAN-EAST

Uploaded on: 04-11-2025

31ST & 34TH ( REFUGE FLOOR PLAN AREA CAL-EAST TOWER

Uploaded on: 04-11-2025

FIRE SCHEME DRAWING 5

Uploaded on: 04-11-2025

23RD AND 27TH(REFUGE) FLOOR PLAN AND AREA CALCULATION - TOWER EAST

Uploaded on: 04-11-2025

22ND (LOWER DUPLEX) FLOOR PLAN & AREA CALCULATION (TOWER WEST)

Uploaded on: 04-11-2025

22ND & 33RD (UPPER DUPLEX FLOOR PLAN & AREA CAL-EAST TOWER

Uploaded on: 04-11-2025

21 SERVICE FLOOR PLAN AREA CALCULATION - WEST TOWER

Uploaded on: 04-11-2025

20TH SERVICE FLOOR PLAN & AREA CALCULATION - TOWER EAST

Uploaded on: 04-11-2025

17TH, 18TH, 24TH TO 26TH, 28TH TO 30TH FLOOR PLAN & AREA CALCULATION - TOWER EAST

Uploaded on: 04-11-2025

16,18-20&24TH; 26-28, & 30TH FLOOR PLAN & AREA CAL-WEST TOWER

Uploaded on: 04-11-2025

11TH (UPPER DUPLEX) FLOOR PLAN & AREA CALCULATION - TOWER EAST

Uploaded on: 04-11-2025

5,9,13TH ( REFUGE) FLOOR PLAN & AREA CALCULATION-WEST TOWER

Uploaded on: 04-11-2025

1ST FLOOR PLAN AREA CALCULATION-WEST TOWER

Uploaded on: 04-11-2025

LC 241 OF 2007 WITH ALL RENEWALS

Uploaded on: 04-11-2025

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 04-11-2025

PERT AND QTR EXP SERVICES V2

Uploaded on: 04-11-2025

SCO-PERT AND QTR EXP - CONSTRUCTION V1

Uploaded on: 04-11-2025

SCO-PERT CHART AND QTRLY EXP - NON CONS - V2

Uploaded on: 04-11-2025

SERVICE PLAN ESTIME SUBMITTED

Uploaded on: 04-11-2025

DRAINAGE LAYOUT

Uploaded on: 04-11-2025

FIRE LAYOUT

Uploaded on: 04-11-2025

ROAD LAYOUT

Uploaded on: 04-11-2025

AFFIDAVIT 4(2)(L)(D)

Uploaded on: 04-11-2025

FIRE SCHEME DRAWING 3

Uploaded on: 04-11-2025

FIRE SCHEME DRAWING 7

Uploaded on: 04-11-2025

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 04-11-2025

AIRPORT AUTHORITY APPROVAL

Uploaded on: 04-11-2025

ENVIROMENT CLEARANCE

Uploaded on: 04-11-2025

DHBVN

Uploaded on: 04-11-2025

PHASING PLAN APPROVAL LETTER

Uploaded on: 04-11-2025

FIRE SCHEME DRAWING 1

Uploaded on: 04-11-2025

FIRE SCHEME DRAWING 2

Uploaded on: 04-11-2025

FIRE SCHEME DRAWING 4

Uploaded on: 04-11-2025

FIRE SCHEME DRAWING 6

Uploaded on: 04-11-2025

FIRE SCHEME DRAWING 9

Uploaded on: 04-11-2025

FIRE SCHEME DRAWING 8

Uploaded on: 04-11-2025

FIRE SCHEME DRAWING 11

Uploaded on: 04-11-2025

Statutory Approvals

LC 239 OF 2007Date: 25-10-2007Status: ALREADY BEEN OBTAINED
LC 240 OF 2007Date: 25-10-2007Status: ALREADY BEEN OBTAINED
LC 241 OF 2007Date: 25-08-2007Status: ALREADY BEEN OBTAINED
LC 199 OF 2008Date: 08-12-2008Status: ALREADY BEEN OBTAINED
BR IIIDate: 13-08-2025Status: ALREADY BEEN OBTAINED
ZONING PLANDate: 28-11-2019Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCEDate: 26-01-2025Status: ALREADY BEEN OBTAINED
AIRPORT HEIGHT CLEARANCEDate: 26-09-2024Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 19-08-2011Status: ALREADY BEEN OBTAINED
FIRE SCHEME APPROVALDate: 01-10-2025Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: No
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERAS PER PROJECT REPORT
SEWERAGE SYSTEMAS PER PROJECT REPORT
PARKINGAS PER PROJECT REPORT
STPAS PER PROJECT REPORT
UNDERGROUND WATER TANKAS PER PROJECT REPORT
RAIN WATER HARVESTINGAS PER PROJECT REPORT
HORTICULTUREAS PER PROJECT REPORT
SECURITY AND CCTVAS PER PROJECT REPORT
SERVICES AND RESURFACING OF ROADSAS PER PROJECT REPORT
SIGNAGE COSTAS PER PROJECT REPORT
EXTERNAL HARDSCAPES AND SOFTSCAPESAS PER PROJECT REPORT
LPG PIPELINESAS PER PROJECT REPORT
DG SETSAS PER PROJECT REPORT
BARRICADING AND GROUND DEVELOPMENT WORKSAS PER PROJECT REPORT

NOC

ROADSProvider: CONNECTEDApproval Status: Pending
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

RAKESH BOHRA
Name
RAKESH BOHRA
PAN
XXXX685K
Email
rbohra@pioneerurban.in
Mobile
8130653232
Landline
01242712000
Address
Flat No 601 Tower C Presidia Near Golf Course Extension Road Oppsite Pioneer Park Sector 62 Gurgaon

Managing Director/CEO

MANISH PERIWAL
Name
MANISH PERIWAL
PAN
XXXX883K
Email
rbohra@pioneerurban.in
Mobile
8130653232
Landline
01242712000
Address
Anugrah 9 New Road Alipore Kolkata West Bengal

Directors

MEENAKSHI PERIWAL
Name
MEENAKSHI PERIWAL
PAN
XXXX328B
Email
rbohra@pioneerurban.in
Mobile
8130653232
Landline
01242712000
Address
9 New Road Alipore Kolkata West Bengal
ASHISH PERIWAL
Name
ASHISH PERIWAL
PAN
XXXX490J
Email
rbohra@pioneerurban.in
Mobile
8130653232
Landline
01242712000
Address
9 New Road Alipore Kolkata West Bengal
MANISH PERIWAL
Name
MANISH PERIWAL
PAN
XXXX883K
Email
rbohra@pioneerurban.in
Mobile
8130653232
Landline
01242712000
Address
Anugrah 9 New Road Alipore Kolkata West Bengal

Contact Details

Project ContactEmail: rbohra@pioneerurban.inMobile: 8130653232Landline: 01242712000
Project Contact PersonName: RAKESH BOHRAEmail: rbohra@pioneerurban.inMobile: 8130653232Landline: 01242712000

Land Details

Land Area6.99025 (Acre)
Proposed FAR3.65
Permissible FAR3.65
Total Licensed Land24.47775 (Acre)

Land Usage

Land Cost1970.27 Lakhs
Other Cost131368.83 Lakhs
Estimated Project Cost305951.05 Lakhs
Estimated Infrastructure Cost9122.01 Lakhs
Estimated Apartment Construction Cost163489.94 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0
Barricading and Ground Development Works663.52

Quarterly Infrastructure Expenditure

2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
DG Sets----
Electricity Supply System0000
External Hardscape and Softscapes----
Horticulture----
LPG pipeines----
Other22.3122.3122.3122.31
Parking58.7658.7658.7658.76
Parks and Playgrounds0000
Rain water harvesting----
Renewable energy system----
Roads & Pavements0000
STP----
Security and CCTV----
Sewerage treatment & garbage disposal0000
Shopping area0000
Signage Cost----
Storm Water Drainage0000
Street Lighting----
Underground water tank----
Water Supply System0000
2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
DG Sets----
Electricity Supply System0000
External Hardscape and Softscapes----
Horticulture----
LPG pipeines----
Other22.3122.3122.3122.31
Parking58.7658.7658.7658.76
Parks and Playgrounds0000
Rain water harvesting----
Renewable energy system----
Roads & Pavements0000
STP----
Security and CCTV----
Sewerage treatment & garbage disposal0000
Shopping area0000
Signage Cost----
Storm Water Drainage0000
Street Lighting----
Underground water tank----
Water Supply System0000
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
DG Sets----
Electricity Supply System0000
External Hardscape and Softscapes----
Horticulture----
LPG pipeines----
Other22.3122.3122.3122.31
Parking58.7658.7658.7658.76
Parks and Playgrounds0000
Rain water harvesting----
Renewable energy system----
Roads & Pavements0000
STP----
Security and CCTV----
Sewerage treatment & garbage disposal0004.32
Shopping area0000
Signage Cost----
Storm Water Drainage0005.38
Street Lighting----
Underground water tank----
Water Supply System00017.66
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
DG Sets----
Electricity Supply System0000
External Hardscape and Softscapes----
Horticulture----
LPG pipeines----
Other22.3122.3122.3122.31
Parking58.7658.7658.7658.76
Parks and Playgrounds0000
Rain water harvesting----
Renewable energy system----
Roads & Pavements0000
STP----
Security and CCTV----
Sewerage treatment & garbage disposal6.436.436.436.43
Shopping area0000
Signage Cost----
Storm Water Drainage8888
Street Lighting----
Underground water tank----
Water Supply System26.2826.2826.2826.28
2030 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
DG Sets----
Electricity Supply System0000
External Hardscape and Softscapes----
Horticulture----
LPG pipeines----
Other22.3122.3122.3122.31
Parking58.7658.7658.7658.76
Parks and Playgrounds0000
Rain water harvesting----
Renewable energy system----
Roads & Pavements0000
STP----
Security and CCTV----
Sewerage treatment & garbage disposal6.436.436.436.43
Shopping area0000
Signage Cost----
Storm Water Drainage8888
Street Lighting----
Underground water tank----
Water Supply System26.2826.2826.2826.28
2031 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
DG Sets----
Electricity Supply System0000
External Hardscape and Softscapes----
Horticulture----
LPG pipeines----
Other22.3122.3122.3122.31
Parking58.7658.7658.7658.76
Parks and Playgrounds0000
Rain water harvesting----
Renewable energy system----
Roads & Pavements016.0647.9947.99
STP----
Security and CCTV----
Sewerage treatment & garbage disposal6.436.436.436.43
Shopping area0000
Signage Cost----
Storm Water Drainage8888
Street Lighting----
Underground water tank----
Water Supply System26.2826.2826.2826.28
2032 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
DG Sets000590
Electricity Supply System0000
External Hardscape and Softscapes304.97304.97304.97304.97
Horticulture2200
LPG pipeines011.333.9322.62
Other22.3122.3122.3122.55
Parking58.7658.7658.7659.42
Parks and Playgrounds0000
Rain water harvesting12.512.512.512.5
Renewable energy system177177177177
Roads & Pavements47.9947.9900
STP402.49102.49102.49102.49
Security and CCTV0257.4771.3771.3
Sewerage treatment & garbage disposal6.432.1400
Shopping area0000
Signage Cost000236
Storm Water Drainage82.6700
Street Lighting5.3382.670
Underground water tank25252525
Water Supply System26.288.7600

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSECONCRETE
WALL FINISHING DETAILSPLASTIC EMULSION
KITCHEN DETAILSCOUNTER
BATHROOM FITTINGSFAUCET, BASIN, WC
WOOD WORK ETCNOT APPLICABLE
DOORS AND WINDOS FRAMESMS/UPVC/ AL/WOOD/ COMPOSITE MATERIAL
GLASS WORKTOUGHNED GLASS
ELECTRIC FITTINGSLED
CONDUCTING AND WIRING DETAILSALUMINIUM/COPPER
CUPBOARD DETAILSN/A
WATER STORAGEUNDERGROUND AND ROOFTOP WATER TANK
LIFT DETAILSGOOD QUALITY LIFT
EXTERNAL GLAZINGSALUMINIUM/UPVC
WINDOWS/GLAZINGSUPVC/ALUMINIUM
DOORSNOT APPLICABLE
MAIN DOORSFLUSH DOOR
INTERNAL DOORSNOT APPLICABLE
AIR CONDITIONINGOUTDOOR VRF UNIT
ELECTRICAL FITTINGSLED
CNG PIPE LINENOT APPLICABLE
PROVISION OF WIFI AND BROADBAND FACILITYPROVISIONAL
EXTERNAL FINISHING/COLOUR SCHEMETEXTURE PAINT/POLISHED PLASTER
INTERNAL FINISHINGPLASTIC EMULSION

Unit-wise Specifications

TOILET
FLOORCONCRETE
WALLSPLASTIC EMULSION
CEILINGRAW CEILING
COUNTERSNOT APPLICABLE
SANITARY WARE/CP FITTINGSFITTINGS
FIXTURESFIXTURES
KITCHEN
FLOORCONCRETE
WALLSPLASTIC EMULSION
CEILINGRAW CEILING
COUNTERSNOT APPLICABLE
FIXTURESFIXTURES
KITCHEN APPLIANCESNOT APPLICABLE
SIT-OUTS
FLOORANTI SKID TILES
WALLS & CEILINGTEXTURE PAINT/POLISHED PLASTER
RAILINGSMETAL/GLASS
FIXTURESNOT APPLICABLE
BED ROOMS
FLOORCONCRETE
WALLSPLASTIC EMULSION
CEILINGRAW CEILING
WARDROBESNOT APPLICABLE
MASTER TOILET
FLOORCONCRETE
WALLSPLASTIC EMULSION
CEILINGRAW CEILING
COUNTERSNOT APPLICABLE
SANITARY WARE/CP FITTINGSNOT APPLICABLE
FITTING/FIXTURESFITTINGS
MASTER BEDROOM/DRESSROOM
FLOORCONCRETE
WALLSPLASTIC EMULSION
CEILINGRAW CEILING
MODULAR WARDROBESNOT APPLICABLE
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORCONCRETE
WALLSPLASTIC EMULSION
CEILINGRAW CEILING
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORCONCRETE
WALLS & CEILINGPLASTIC EMULSION
TOILETNOT APPLICABLE
BALCONYCONCRETE

Fee Details

Payment 1
amount:12616000.00
cheque no:500008
draft date:28-08-2025
payable to:HRERA Gurugram
payee bank:ICICI BANK
Payment 2
amount:5267000.00
cheque no:500233
draft date:13-10-2025
payable to:HRERA Gurugram
payee bank:ICICI BANK