Launch Date
Completion Date
RERA ID
28.701122
77.421516
N.A
Entire Periphery.
Trimix /RCC road
Tile and stone
Over head tank connected with under ground water tank.
Underground system using Sewer pipes.
Underground system using pipes.
N.A.
APROX 500Nos. trees are to be planted out of that 50% will be evergreen tree.
Two Electricity Transformers each shall be used along with necessary switch-gear for distributing electricity at LT voltage .
N.A.
Sewer to be connected with drain municipal sewage.
Solid waste to be collected, segregated and recycle
Provision for Rain water harvesting.
Solar panels shall be provided on terrace.
Fire tender path shall be provided as per NBC. Fire fighting systems along with pumps and UGT of Fire tank and OHT of Fire tank shall be provided as per NBC & NOC from fire depp.
N.A.
Four staircase . Exit and entry signage. Two nos. gate
N.A.
Showing 1 blocks with 16 units
Total Carpet Area
5598.55 m²
60262.23 ft²
Total Units
16
1 different types
Blocks & Floors
1
5 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
60266.00 m²
648697.20 ft²