ONGOINGActive

PIPL PARADISE

GURUGRAM, WAZIRABAD ST
30-11-2019
Launch Date
ONGOING
Type
2021-05-29
Completion Date

Overview

Launch Date

30-11-2019

Completion Date

2021-05-29

RERA ID

RERA-GRG-420-2019

Basic Details

Project NamePIPL PARADISE
Project IDRERA-GRG-420-2019
Project TypeONGOING
Applicant TypeCompany
Submission Date30-11-2019 04:37:34 AM
Builder NameM/S PIVOTALINFRASTRUCTURE PVT. LTD
CINU70109HR2006PTC038348
PANXXXX575F
Emailinfo@pivotalinfrastructure.com
WebsiteHTTP://PIVOTALINFRASTRUCTURE.COM
Phone (Mobile)8130139888
Phone (Landline)1244200577
Registered Address704, 7TH FLOOR JMD PACIFIC SQUARE, SECTOR 15 PART-II, GURUGRAM
Project AddressVILLAGE ULLHAWAS, SECTOR-62, GURUGRAM
DistrictGURUGRAM
TehsilWAZIRABAD ST

Bank Details

Bank NameHDFC BANK, JHARSA CHOWK SECTOR 31, GURUGRAM
Account Number50200032781880
IFSC CodeHDFC0009075
MICR Code110240483
Branch Code9075

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Surinder Singh, H.No.1016, Sector-31, Gurugram
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Yes

Development Details

Land Area5.06875 (Acre)
Proposed FAR225
Permissible FAR225%
Total Licensed Land5.06875 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.92973
CONSTRUCTION OF ROADS1.22239
PAVEMENTS1.15016
PARKS AND PLAYGROUNDS0.65131
GREEN BELTS0.38136
VEHICLE PARKINGS0.12058
ELECTRICITY SUB-STATION0.09795
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0.13590
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
LAND0.29659
WATER0.08278
Total5.06875

Cost Details

Land Cost2117.00 Lakhs
Other Cost3829.00 Lakhs
Estimated Project Cost15947.00 Lakhs
Estimated Infrastructure Cost1510.00 Lakhs
Estimated Apartment Construction Cost8491.00 Lakhs

Documents

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 30-11-2019

A COPY OF THE DRAFT ALLOTMENT LETTER BY WHICH THE APARTMENT SHALL BE ALLOTTED/ BOOKED IN FAVOUR OF THE APARTMENT BUYERS

Uploaded on: 30-11-2019

A COPY OF THE DRAFT AGREEMENT WHICH SHALL BE MADE BEFORE SEEKING ANY DEPOSIT EXCEEDING 10% OF THE COST OF THE APARTMENT.(BASED ON THE MODEL AGREEMENT PRESCRIBED IN THE RULES)

Uploaded on: 30-11-2019

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 30-11-2019

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 30-11-2019

ZONING PLAN

Uploaded on: 30-11-2019

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 30-11-2019

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 30-11-2019

Statutory Approvals

POLLUTIONDate: 14-09-2017Status: ALREADY BEEN OBTAINED
BUILDING PLAN APPROVALDate: 25-07-2016Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCEDate: 28-07-2017Status: ALREADY BEEN OBTAINED
FIRE SCHEME APPROVALDate: 12-04-2017Status: ALREADY BEEN OBTAINED
POWER LOAD ASSURANCEDate: 09-06-2016Status: ALREADY BEEN OBTAINED
SEWRAGE TREATED WATER FOR CONSTRUCTIONDate: 27-05-2016Status: ALREADY BEEN OBTAINED
WATER SUPPLY ASSURANCEDate: 20-03-2017Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: Yes
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: Yes
STREET LIGHTING PLANApproved: Yes
PARKING PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSYET TO BE PREPARED
WATER SUPPLY SYSTEMYET TO BE PREPARED
STORM WATER DRAINAGEYET TO BE PREPARED
ELECTRICITY SUPPLY SYSTEMYET TO BE PREPARED
SEWAGE TREATMENT & GARBAGE DISPOSALYET TO BE PREPARED
STREET LIGHTINGYET TO BE PREPARED
SECURITY AND FIRE FIGHTINGYET TO BE PREPARED
PLAYGROUNDS AND PARKSYET TO BE PREPARED
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED
CRECHEYET TO BE PREPARED

NOC

ROADSProvider: HSVPApproval Status: Pending
WATER SUPPLYProvider: HSVPApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: NAApproval Status: Approved
STORM WATER DRAINAGEProvider: NAApproval Status: Approved

Project Team

Authorized Representative

GAGAN DEEP PANWAR
Name
GAGAN DEEP PANWAR
PAN
XXXX362D
Email
gaganpanwar@glsho.com
Mobile
9205380736
Landline
01244200577
Address
704 JMD pacific square Sector 15 part-II Gurugram

Managing Director/CEO

DEVENDER KUMAR GUPTA
Name
DEVENDER KUMAR GUPTA
PAN
XXXX221A
Email
gupta.devender1303@gmail.com
Mobile
8130139888
Landline
01244200577
Address
1303 Sector 15 Ajronda Faridabad

Directors

RAJESH GOYAL
Name
RAJESH GOYAL
PAN
XXXX855H
Email
rajesh@glsind.com
Mobile
8130139888
Landline
01244200577
Address
263 Sector 14 Gurugram

Contact Details

Project ContactEmail: cs.compliance1@gmail.comMobile: 8130139888Landline: 01244200577
Project Contact PersonName: ANIL AHUJAEmail: cs.compliance1@gmail.comMobile: 8130139888Landline: 01244200577

Land Details

Land Area5.06875 (Acre)
Proposed FAR225
Permissible FAR225%
Total Licensed Land5.06875 (Acre)

Land Usage

Land Cost2117.00 Lakhs
Other Cost3829.00 Lakhs
Estimated Project Cost15947.00 Lakhs
Estimated Infrastructure Cost1510.00 Lakhs
Estimated Apartment Construction Cost8491.00 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area387
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSETILES
WALL FINISHING DETAILSOIL BOUND DISTEMPER
KITCHEN DETAILSTILES
BATHROOM FITTINGSISI MARK
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESPAINTED HARDWOOD WITH FLUSH DOOR AND POWDER COATED/ANODIZED ALUMINIUM FRAME WINDOWS
GLASS WORKGLASS FITTINGS IN WINDOWS AND BATHROOM
ELECTRIC FITTINGSUSE OF ISI MARKED PRODUCTS FOR WIRING, SWITCHES AND CIRCUITS
CONDUCTING AND WIRING DETAILSCONDUIT:25MM, WIRE: 1.5 MM TO 6 MM
CUPBOARD DETAILSNA
WATER STORAGENA
LIFT DETAILSSCHINDLER MAKE
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGSPOWER COATED/ANODIZED UPVC FRAME WINDOWS
DOORSPAINTED HARDWOOD WITH MOULDED FLUSH DOORS
MAIN DOORSPAINTED HARDWOOD WITH MOULDED FLUSH DOORS
INTERNAL DOORSPAINTED HARDWOOD WITH MOULDED FLUSH DOORS
AIR CONDITIONINGNA
ELECTRICAL FITTINGSNA
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMEWEATHER SHIELD PAINT
INTERNAL FINISHINGOBD

Unit-wise Specifications

TOILET
FLOORTILES
WALLSOIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
COUNTERSNA
SANITARY WARE/CP FITTINGSWC/BASIN
FIXTURESISI MARK
KITCHEN
FLOORTILES
WALLSOIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
COUNTERSTILES UPTO 1.5 FEET AND OIL BOUND DISTEMPER
FIXTURESISI MARK
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORNA
WALLS & CEILINGNA
RAILINGSNA
FIXTURESNA
BED ROOMS
FLOORTILES
WALLSOIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
WARDROBESNA
MASTER TOILET
FLOORTILES
WALLSOIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
COUNTERSNA
SANITARY WARE/CP FITTINGSWC/BASIN
FITTING/FIXTURESISI MARK
MASTER BEDROOM/DRESSROOM
FLOORTILES
WALLSOIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORTILES
WALLSOIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORNA
WALLS & CEILINGNA
TOILETNA
BALCONYNA

Fee Details

Payment 1
amount:443500
cheque no:7491
draft date:31-07-2017
payable to:HRERA Gurugram
payee bank:HDFC BANK
Payment 2
amount:29000
cheque no:7493
draft date:31-07-2017
payable to:HRERA Gurugram
payee bank:HDFC BANK