Launch Date
Completion Date
RERA ID
28.717847
77.453580
DEMARCATION OF THE PLOT IS DONE AS PER APPROVED BUILDING PLAN. LAND IS IN OUR POSSESSION.
PERMANENT BOUNDARY WALL WILL BE CONSTRUCTED AS PER DESIGN IN RCC / BRICK WORK.
INTERNAL ROADS AS PER THE ARCHITECTS PLAN WILL BE CONSTRUCTED WITH RCC FINISH/PAVERS.
AS PER ARCHITECTS PLAN.
WATER SUPPLY WILL BE DONE WITH CPVC/PVC PIPES AS PER DRAWING OF OUR CONSULTANT . TANKS WILL BE CONSTRUCTED FOR UNINTERRUPTED SUPPLY OF WATER.
SEWER SYSTEM IN BUILDING WILL BE WITH PVC PIPES AND UNDERGROUND SEWER SYSTEM WILL BE WITH RCC PIPES. AS PER DRAWING OF OUR CONSULTANT
WASTE DRAIN AND RAINWATER SYSTEM WIIL BE CONSTRUCTED USING PVC PIPE TO OUTER DRAIN .
PARK WILL BE DEVELOPED AS PER LANDSCAPING PLAN.
TREE PLANTING WILL BE DONE AS PER LANSCAPE PLAN.
THE ELECTRIC SUPPLY ALONG WITH POWER BACKUP WILL BE PROVIDED AS PER MEP CONSULTANT/ARCHITECT.
SHOPS ,COMMUNITY HALL AND MULTIPURPOSE HALL WILL BE CONSTRUCTED.
TREATMENT THROUGH S.T.P AND OVERFLOW TO THE MUNICIPAL SEWERAGE LINE.
SOLID WASTE WILL BE SEGREGATED AND ORGANIC WASTE WILL BE TREATED THROUGH OWC.
RAINWATER HARVESTING PITS WILL BE CONSTRUCTED AS PER DRAWING.
AS PER DESIGN AND REQUIREMENT
AS PER NBC REQUIREMENT AND FIRE APPROVAL
NA
AS PER APPROVED PLAN
NA
Showing 3 blocks with 183 units
Total Carpet Area
17874.08 m²
192394.81 ft²
Total Units
183
5 different types
Blocks & Floors
3
17 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
9105.00 m²
98005.31 ft²