Launch Date
Completion Date
RERA ID
28.66351
77.40649
as per layout approved by housing Commisioner, Demarcation of plot must be done by Bricks or Stone Pillars.
N/A
7.5 M wide and 9.0 M wide road will be constructed as per approved layout Plan. All Trunk Roads are already constructed.
N/A
As per approved design and drawings approved by UP Avas Evam Vikas Parishad the internal water supply will be laid all trunk water supply line are already laid with 1700 KL OHT and Two CWR of 2500 KL Capacity .
Internal Sewer line will be laid as per approved layout By UP Avas Evam Vikas Parishad . All Trunk sewer lines are already laid with STP .
Internal Drains will be constructed as per Approved Layout by UP Avas Evam Vikas Parishad.
As Per Approved Layout . The 3 Nos. of parks lash Of Trees and Greenery. The park Toe Wall constructed by Brickwork or Mild Steel grill.
N/A
Electric sub station are already constructed and Trunk Electric Services are already completed. Electric lines will be laid as per approved layout by UP Avas Evam Vikas Parishad .
There is community center already constructed at sector 09 Sidharth Vihar Yojana Ghaziabad.
Trunk sewer line is already laid and connected with sewerage Treatment Plant in Sidharth Vihar Yojana Ghaziabad. Internal sewer line of proposed plots will be laid as per approved plan by UP Avas Evam Vikas Parishad.
Already planned in Sidharth Vihar yojana Ghaziabad.
To be developed by Plot owner as per guidelines.
To be developed by plot owner as per guidelines.
To be developed by plot owner as per guidelines.
To be developed as per Government guidelines.
To be developed as per Government guidelines.
N/A
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
42675.00 m²