NewActive

Windsor Greens Phase-4

Lucknow, Uttar Pradesh
01-10-2021
RERA Received Date
New
Type
31-12-2025
Completion Date

Overview

RERA Received Date

01-10-2021

Completion Date

31-12-2025

RERA ID

UPRERAPRJ831593

Location

Latitude

26.89787

Longitude

81.072638

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)8472
Project NameWindsor Greens Phase-4
Registration Fee (in Rs.)47500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)51
DistrictLucknow
Original Start Date-
TehsilLucknow
Proposed Start Date01-10-2021
Sanctioning Competent AuthorityLucknow Development Authority
Project Cost (in Lacs)7629
Proposed Completion Date31-12-2025

Bank Details

Account Details
Name of the AccountOmega Developer and Builders- Collection Account for Windsor Greens Phase-4
Account Number921020009653416
Bank NameAxis Bank
Branch NameLucknow Main Branch
Branch Address31/93, Ground Floor, MG Marg, Lucknow
IFSC CodeUTIB0000053
Branch DistrictLucknow
Separate Account Details
Name of the AccountOmega Developers and Builders- Separate Bank Account for Windsor Greens Phase-4
Account Number921020009653131
Bank NameAxis Bank
Branch NameLucknow Main Branch
Branch Address31/93, Ground Floor, MG Marg, Lucknow
IFSC CodeUTIB0000053
Branch DistrictLucknow
Transaction Account Details
Name of the AccountOmega developer and builders- RERA Transaction Account for windsor greens phase-4
Account Number921020009248878
Bank NameAxis Bank
Branch NameLucknow Main Branch
Branch Address31/93, Ground Floor, MG Marg, Lucknow
IFSC CodeUTIB0000053
Branch DistrictLucknow

Development Works

Demarcation of Plots

This is a part of Windsor Greens Project situated along community building and in between club. This is the forth phase of the Group housing project.

Boundary Wall

Both side open green area and open parking will be provided.

Road Work

Bituman based road will be created in front of Towers.

Footpaths

40-60 mm thick concrete pavers shall be provided for footpaths.

Water Supply Including Drinking Water Facilities

Ground water may also be used, end user shall use their individual RO system as per their requirements. Overhead tanks shall be provided on building terrace for distribution through gravity.

Sewer System

Centralized Sewerage system shall be provided. All sewerage water shall go to STP for treatment and after treatment, water shall be recycled and it may be used in gardening .

Drain

Storm water system shall be provided. Storm water from roads and other landscape area shall connect to storm water drain channel and go to the rain water harvesting pit for recharging the Ground water.

Parks

There is one park (green area) in between both the towers.

Tree Planting

There are 4 types of trees provided in site which are kachnar, gulmauhar, kusum and neem.

Design For Electric Supply Including Street Lighting

We have design the system as per local electricity board and consider centralized transformer, HT panel, LT panel and DG back for common service like External lighting, STP, Pump room etc.

Community Buildings

Club shall be provided.

Treatment and Disposal System of Sewage and Sullage water

centralized sewerage system shall be provided. All sewerage water shall be go to the STP for treatment and after treatment, water shall be recycled and it may be used in gardening.

Solid Waste Management And Disposal System

There are a proper garbage collection area provided for the solid waste management.

Water Conservation System

A well designed rain water harvesting system shall be provided for the whole building complex to conserve water.

Energy Management System Including Use of Renewable Energy

We will use LED lights fitting in external area. In STP and pump room all the equipment shall have energy efficient motor.

Fire Protection And Fire Safety System

All the fire norms shall be followed as NBC and approval of fire department .

Social Infrastructure And Other Public Amenities Including Public Health Services

Sewerage, storm water and water supply system shall be provided. We have proposed common pump room with primary filteration, transfer pumps to fill the domestic overhead tank. Water for domestic use and flushing go down through gravity from domestic as wellas flushing tanks. All sewerage shall go to the STP for recycling the water. Storm water for roof, roads and other area shall connect to the storm water drain channel and go to the rain water harvesting pit for recharging the ground water.

Emergency Evacuation Services

Refuge areas with access through a fire door shall be provided at certain floors for evacuation of people. Balcony will also be used for evacuation.

Other Miscellaneous Work

Guard room, Swimming pool, GYM, Yoga pavilion etc. shall be provided

Documents

Sale Deed

No: 12638 | Date: 31-07-2014

Sale Deed

No: 12639 | Date: 31-07-2014

Sale Deed

No: 15614 | Date: 02-12-2010

Extract of Khatauni

No: Form RA-1 | Date: -

Extract of Khatauni

No: Partners Resolution | Date: -

Extract of Khatauni

No: Affidavit regarding no bookings/ sales | Date: -

Extract of Khatauni

No: 1425-1430 | Date: -

Extract of Khatauni

No: 1425-1430 | Date: -

Extract of Khatauni

No: Water supply plan, Electricity Supply Plan, Waste disposal plan and development work plan | Date: -

Sale Deed

No: 12 | Date: 01-01-2011

Sale Deed

No: 2138 | Date: 18-02-2010

Sale Deed

No: 6403 | Date: 30-04-2010

Sale Deed

No: 6404 | Date: 30-04-2010

Sale Deed

No: 7826 | Date: 02-05-2012

Sale Deed

No: 2672 | Date: 13-03-2003

Sale Deed

No: 14673 | Date: 30-11-2017

Sale Deed

No: 9913 | Date: 24-10-2007

Sale Deed

No: 6707 | Date: 26-09-2001

Details of Encumbrances

Uploaded: 07-10-2021

Commencement Certificate

Uploaded: 09-09-2021

Other Plan(If Any)

Uploaded: 04-10-2021

Proforma of Application Form

Uploaded: 09-09-2021

Proforma of Allotment Letter

Uploaded: 09-09-2021

Proforma of Conveyance Deed

Uploaded: 09-09-2021

Waste Disposal Plan

Uploaded: 09-09-2021

Water Supply Plan

Uploaded: 11-09-2021

Electricity Supply Plan

Uploaded: 11-09-2021

Development Work Plan

Uploaded: 11-09-2021

Affidavit

Uploaded: 11-09-2021

CA CERTIFICATE

Uploaded: 04-10-2021

ARCHITECT CERTIFICATE

Uploaded: 13-10-2021

ENGINEERS CERTIFICATE

Uploaded: 11-09-2021

Permits

Orignal Permit No42895
Orignal Permit Date10-05-2018
Valid Upto09-05-2023
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto09-05-2026
End Date31-12-2025
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Sai Enterprises
Contractor AddressMaruti Puram, 20/1, Saraswatipuram, Khargapur, Gomti Nagar, Lucknow, Uttar Pradesh-226010
Architect NameAr. Vishal Mittal
Architect AddressB-34, Sector 67, Noida
Architect Licence NumberCA/98/23185
Structural Engineer NameEr. V.D Sharma
Structural Engineer AddressB-24 Sector-67 Noida
Mobile number(Project Co-ordinator)8173002402

Land Details

AFS

Showing 3 blocks with 90 units

Property Summary

Total Carpet Area

18941.21 m²

203881.29 ft²

Total Units

223

2 different types

Blocks & Floors

3

15 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:84.94 m²
Balconies:281
Parking ratio:0.00 per unit

Block C1

30 units

Block C2

30 units

Block D2

30 units

Khasra Details

Total Area

8472.05 m²

91192.30 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No161, 162
Area(In Sq. Mt.)8472.05

Other Details

Contractor Name (if any)Sai Enterprises
Contractor AddressMaruti Puram, 20/1, Saraswatipuram, Khargapur, Gomti Nagar, Lucknow, Uttar Pradesh-226010
Architect NameAr. Vishal Mittal
Architect AddressB-34, Sector 67, Noida
Architect Licence NumberCA/98/23185
Structural Engineer NameEr. V.D Sharma
Structural Engineer AddressB-24 Sector-67 Noida
Mobile number(Project Co-ordinator)8173002402