RERA Received Date
Completion Date
RERA ID
26.896708
81.072256
This is a part of Windsor Greens project situated along A2 and in between club.
Both side open green area and open parking will be provided.
Bituman based road will be created in front of Towers
40- 60 mm thick concrete pavers shall be provided for footpaths
This shall be provided by the promoter itself.
Centralized Sewerage system shall be Provided. All Sewerage water shall go to STP for treatement and after treatement ,water shall be recycled and it may be used in gardening.
Storm water system shall be Provided. Storm water from Roads and other lanscape area shall connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharging the Ground water
There is one park (green area) in between both the towers.
There are 4 type of trees povided in site which are kachnar, gulmauhar, kusum and neem.
We have design the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel and DG back for common service like External lighting,STP,Pump room etc.
Club shall be provided
Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatment after treatment ,water shall be recycled and it may be used in gardening
There are a proper garbage collection area provided for the solid waste management.
A well designed rain water harvesting system shall be provided for the whole building complex to conserve water.
We will use LED lights fitting in external area . In STP and Pump room all the equipment shall have energy efficient motor.
All the fire norms shall be followed as NBC and approval of fire department
Sewerage ,Storm water and water supply system shall be Provided. We have Proposed common Pump Room with Primary filteration, Transfer pumps to fill the domestic overhead tank. Water for domestic use & Flushing go down through gravity from domestic as well as flushing tanks. All Sewerage shall go to the STP for recycling the water. Storm water for Roof,Roads and other area shall connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharging the Ground water.
Refuge areas with acess through a fire door shall be provided at certain floors for evacuation of people. Balcony will also be used for evacuation.
Guard room, Swimming pool, GYM,Yoga pavilion etc. shall be provided
Showing 2 blocks with 88 units
Total Carpet Area
11765.36 m²
126641.16 ft²
Total Units
120
2 different types
Blocks & Floors
2
15 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
7464.14 m²
80343.26 ft²