Launch Date
Completion Date
RERA ID
N 28' 37' 15.4936'
N 28' 37.258226'
Demarcation Done by Total station
Permanent Boundary with Gated Premises
Trimix road All arround
Paver path in landscape green
water treatment plant for the supply of pure water
STP will be installed for the treatment of sludge
Road side saucer drain will be done when road constructed
As per guided by authority
As per guided by authority
As per guided by authority
As per guided by authority
As per guided by authority Stp will be provided
As per guided by authority solid waste management sytem will be there
As per guided by authority rain water harvestig pits provision
As per guided by authority
As per guided by authority all the equipments on site
As per guided by authority
As per guided by authority
As per guided by authority
Showing 2 blocks with 274 units
Total Carpet Area
21084790.22 m²
226954573.45 ft²
Total Units
287408
4 different types
Blocks & Floors
2
24 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
4808.00 m²
51752.83 ft²