VRINDAVAN VIHAR

Bulandshahr, Uttar Pradesh
01-10-2022
RERA Received Date
New
Type
05-08-2027
Completion Date

Overview

RERA Received Date

01-10-2022

Completion Date

05-08-2027

RERA ID

UPRERAPRJ818122

Location

Latitude

28.238054

Longitude

77.865423

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)2781
Project NameVRINDAVAN VIHAR
Registration Fee (in Rs.)19000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)59
DistrictBulandshahr
Original Start Date-
TehsilKhurja
Proposed Start Date01-10-2022
Sanctioning Competent AuthorityKhurja Development Authority
Project Cost (in Lacs)2277
Proposed Completion Date05-08-2027

Bank Details

Account Details
Name of the AccountSHRUTI GARDEN VRINDVAN VIHAR COLLECTION ACCOUNT
Account Number2582020000223
Bank NameBANK OF BARODA
Branch NameLAXMANGANJ, KHURJA
Branch AddressMAHARAJA AGRASEN MARG, KHURJA
Branch StateUttar Pradesh
Branch DistrictBulandshahr
IFSC CodeBARB0KHURJA
Separate Account Details
Name of the AccountSHRUTI GARDEN VINDAVAN VIHAR SEPARATE ACCOUNT
Account Number25820200002225
Bank NameBANK OF BARODA
Branch NameLAXMANGANJ, KHURJA
Branch AddressMAHARAJA AGRASEN MARG, KHURJA
Branch StateUttar Pradesh
Branch DistrictBulandshahr
IFSC CodeBARB0KHURJA
Transaction Account Details
Name of the AccountSHRUTI GARDEN VRINDAVAN VIHAR TRANSACTION ACCOUNT
Account Number25820200002224
Bank NameBANK OF BARODA
Branch NameLAXMANGANJ, KHURJA
Branch AddressMAHARAJA AGRASEN MARG, KHURJA
Branch StateUttar Pradesh
Branch DistrictBulandshahr
IFSC CodeBARB0KHURJA

Development Works

Demarcation of Plots

The project land will be demarcated as per the approved layout. The setbacks and building lines will also be as per approved map.

Boundary Wall

7 feet high boundary wall will be constructed with RCC wall/ column and brick work as per drawings. The design will be earthquake resistant. The finishing will be done with all weather paint.

Road Work

Rigid pavement to cater the residents vehicles will be constructed. The PQC will be laid over 200 mm granular sub-base and 2 layers of water bound macadam . All layers will be compacted to density as per design.

Footpaths

The footpath will be 75mm high from roads . The 75mm cement-concrete interlocking tiles will be laid over 100mm thick PCC with sand bed of 50mm.

Water Supply Including Drinking Water Facilities

The water supply will be provided by Khurja Development Authority. The underground storage will be constructed to store and lift the water to roof tanks. Thereon the water will be supplied to individual units.

Sewer System

The sewer lines will be designed as per norms and the PVC pipes of 10 Kgf pressure will be used to carry the sewer. The sewer will be lead to municipal sewer line.

Drain

underground pipe line drains will be designed as per norms and laid in required slopes. The collection chambers will constructed to cater for the surface runoffs.

Parks

There will be two parks. The soft land scaping will be done along with lighting arrangements.

Tree Planting

The tree of different varieties and in minimum numbers specified by the authority will be planted at all suitable locations of the project.

Design For Electric Supply Including Street Lighting

Electrical sub-station will be designed and installed as per UPPCL norms. MS street light designer poles with energy saving LED lights will be installed.

Community Buildings

Not applicable

Treatment and Disposal System of Sewage and Sullage water

Not applicable

Solid Waste Management And Disposal System

Dust bins will be installed in the suitable common areas of the project. The garbage collection and disposal arrangements will done by third-Party vendor mechanism.

Water Conservation System

Rain water harvesting pit as per the approved design in the specified project location to collect the surface and roof run-off to aid the ground water recharge.

Energy Management System Including Use of Renewable Energy

Solar panels as per the MOE norms will be installed on the roof top.

Fire Protection And Fire Safety System

The fire fighting system as per the fire department norms will be installed in the project.. The separate fire case is designed for the evacuation services in the building. UP fire department./ NBC 2016 will be referred.

Social Infrastructure And Other Public Amenities Including Public Health Services

Not Applicable

Emergency Evacuation Services

Separate stairs as per U.P fire department norms to assist smooth escape of residents in case of fire

Other Miscellaneous Work

As per requirements of project.

Documents

Sale Deed

No: 8196 | Date: 01-07-2021

Details of Encumbrances

Uploaded: 05-09-2023

Commencement Certificate

Uploaded: 07-09-2023

Proforma of Application Form

Uploaded: 07-09-2023

Proforma of Allotment Letter

Uploaded: 07-09-2023

Proforma of Conveyance Deed

Uploaded: 11-10-2023

Waste Disposal Plan

Uploaded: 11-10-2023

Water Supply Plan

Uploaded: 09-09-2023

Electricity Supply Plan

Uploaded: 09-09-2023

Development Work Plan

Uploaded: 09-09-2023

Affidavit

Uploaded: 05-12-2023

CA CERTIFICATE

Uploaded: 11-09-2023

ARCHITECT CERTIFICATE

Uploaded: 11-09-2023

ENGINEERS CERTIFICATE

Uploaded: 11-09-2023

Permits

Orignal Permit NoGroup Housing/00108/KHDA/BP/21-22/0045/07012022
Orignal Permit Date06-08-2022
Valid Upto05-08-2027
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto04-08-2030
End Date05-08-2027
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit NoGroup Housing/ 00108/KHDA/BP/21-22/0045/07012022
Orignal Permit Date06-08-2022
Valid Upto05-08-2027
Revalidated Permit NoGroup Housing/ 00108/KHDA/BP/21-22/0045/07012022
Revalidated Permit Date06-08-2022
Revalidated Permit Valid Upto04-04-2029
Permit Extendable Upto05-08-2030
End Date05-08-2027
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)SS Infratech- Through Sanjay Singh.
Contractor Address31, First Floor, Omaxe Arcade, Golf Link-1, Greater Noida , U.P.
Architect NameAnuj Agarwal
Architect AddressA-244, Kaushambi, Ghaziabad, 201010
Architect Licence NumberCA/96/19503
Structural Engineer NameAkhilesh Singh
Structural Engineer AddressPlot No. 245, Pkt-8, Sector 23, Rohini, New Delhi -110085
Mobile number(Project Co-ordinator)9837040577

Land Details

AFS

Showing 1 blocks with 12 units

Property Summary

Total Carpet Area

2980.48

32081.59 ft²

Total Units

24

3 different types

Blocks & Floors

1

8 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:124.19
Balconies:9
Parking ratio:0.00 per unit

Block VRINDAVAN VIHAR

12 units

Khasra Details

Total Area

2781.03

29934.73 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoPlot No. GH-02, Kalindi Kunj Residential Scheme , Khurja
Area(In Sq. Mt.)2781.03

Other Details

Contractor Name (if any)SS Infratech- Through Sanjay Singh.
Contractor Address31, First Floor, Omaxe Arcade, Golf Link-1, Greater Noida , U.P.
Architect NameAnuj Agarwal
Architect AddressA-244, Kaushambi, Ghaziabad, 201010
Architect Licence NumberCA/96/19503
Structural Engineer NameAkhilesh Singh
Structural Engineer AddressPlot No. 245, Pkt-8, Sector 23, Rohini, New Delhi -110085
Mobile number(Project Co-ordinator)9837040577