Have queries on this Project?
28.386599
79.486736
Showing 1 blocks with 2 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
21632.19 m²
232846.73 ft²
Each plot will be demarcated as per layout approved by BDA in which No. of Residential plots under 100 sq.mt area is 74, No. of residential plots between 100-150 sq.mt. area is 31
R.C.C. Framed, Brick wall up to 3Meter Height work in column and beam with both side plaster
From the main entrance gate, we have 80 mm thick Cement Concrete Road throughout the project.
We would provide Chequered Tiles or cemented paver blocks in footpath along with road
Water supply through bore well/ Municipal supply collected in underground water tank, further distribution to individual plots by pumping
Modular Sewerage system shall be Provided. All Sewerage water shall be going to the STP and treated water will be used for gardening, excess treated water would be disposed in municipal line
Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting with open drain and overflow to Municipal drain
Parks will be provided as per BDA plan. The parks will be provided with benches, various amenities such as badminton court, children play area with swings, walking area etc. will be provided in the parks.
We will provide many types of trees all around the park boundary wall & green area
We will design & implement the underground electric supply system will be provided for all residence as per local electricity Board and street lights will be provided along the road with 1 street light placed between 2 units
NA
All Sewerage water shall be going to the STP and treated water will be used for gardening, excess treated water would be disposed in municipal line.
We will provide dustbins in 2 garbage collection area in two different parks separately for solid waste in approved map.
Water conservation through rain water harvesting pits to improve the ground water level.
NA
NA
NA
NA
NA