26.7523995
81.0538
Total Units
0
0 unit types
Carpet Area
0 ft²
0.00 m² · carpet only, excludes balcony
Blocks & Floors
0
0 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 0 ft² (0.00 m²)Balconies 0Parking per unit 0.005 of 5 rows list no units (1 floor is empty), so they add nothing to these totals
Showing 5 of 5 rows · 3 of 12 columns
| Block | Floor | Type |
|---|---|---|
| — | — | — |
| — | — | — |
| — | — | — |
| — | — | — |
| — | — | — |
Total Plot Area
13.63 acres
55,152.96 m² · plot area
Demarcation of Plots as per approved map is started and few plots are demarcated on ground. Almost 15 percent demarcation of plot work is completed.
As per the approved plan, boundary is planned in certain area to protect the encroachment and green cover. Approximately 25 percent of planned boundary wall is completed.
Earth filing and stonechips work of the Road as er approved plan is in progress . Approx 30 percent road work is completed.
NA
Pipe connetion will be provided to all the plot holder by water distribution pipe. There will be 2 tube wells at the site for supply of water as earmarked in the approved map.
Sewer Line will be provided infront of all the plots and all sewer line will be connected to STP as earmarked in the approved map for treatment and then release of water.
The laying of drain pipes has started as per approved plan. Approximately 5 percent work is completed.
There are 4 Parks as per the approved map. There will be proper plantation and boudary shall be constrcuted. The oxygen providing trees will be planted at the parks. There will be proper area for chailderns and senior citizens.
Some trees are planted at the site and more plantation will be done on the green area available.
There will be Substation for the project site and from the substation distribution of power through LT lines to the plots. There shall be Transformer 400 KVA and 250 KVA. There will be street lights arrangement at the site.
NA
There will be a sewr line to the STP. The treatment will be done at the STP and then the treated water shall be distributed .
A space shall be provided for the collection of solid waste at a place. The space of solid waste collection are already marked in the map where dustbins will be kept.
There are 2 20000 litres Rain Water Harvesting Plant. The RWH plant are already marked in the approved map.
NA
NA
Space is provided already for convinience shops in the map.
NA
Space is already provided in the map for Nursery School.
Vikas Vihar Officers Enclave is located in Lucknow.
Yes. Vikas Vihar Officers Enclave is registered under UPRERAPRJ601212 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Vikas Vihar Officers Enclave is 30 September 2025.
Vikas Vihar Officers Enclave is developed by VIKASVIHAR DEVELOPERS AND CONSTRUCTION PRIVATE LIMITED.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.