Launch Date
Completion Date
RERA ID
26.557047213630483
81.04674071370135
The plots available for sale are clearlyand accurately demarcated on-site, ensuring transparency in boundary identification and layout. The land is under complete and legal possession, providing assurance to potential buyers about the authenticity and security of ownership .
A 2.1-meter high cemented boundary wall is planned for construction (or currently under construction, as applicable ) to ensure enhanced security, privacy, and a well-defined perimeter for the property.
The development plan includes the construction of well-designed 15 meter and 12 meter-wide roads with durable blacktop surfacing.
In addition to well planned road infrastructure, we are incorporating a dedicated green area in the center of the roads along every row.
To ensure areliable and efficient drinking water supply , we will construct an overhead water tank, complemented by an underground pipeline network. This system is designed to provide consistent water availability to all residents while maintaining optimal water pressure.
All sewage water will be directed to the Sewage Treatment Tank (STT) developed on site. any overflow from the STT will be connected to the municipal sewerage system, ensuring proper waste management and environmental compliance.
All drainage water will also be directed to the on site Sewage Treatment Tank(STT), ensuring comprehensive waste and water management within the project.
We will develop a 2,202.13 sq meter park featuring green landscaping and multi- purpose spaces. This Park will includes various plants and is designed to offer a versatile recreational area for residents to enjoy.
We will plant evergreen trees and plants ranging from 1 meter to 4 meters in height along all roads, enhancing the aesthetic appeal and providing year round greenery.
We will design and implement the lighting system according to the guidelines provided by the local electricity board. For external areas, LED Lights will be used due to their energy efficiency ,long lifespan, and effective illumination .
N/A
N/A
N/A
N/A
We will install LED light fittings in external areas to ensure efficient and long -lasting illumination. Additionally , we recommend individuals consider using solar panels to promote sustainable energy usage and reduce dependence on conventinal electricity sources.
N/A
N/A
N/A
N/A
Showing 1 blocks with 3 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
12737.12 m²
137101.05 ft²