Launch Date
Completion Date
RERA ID
29.0932
77.7101
Making suitable brick wall upto the height of 1 feet from natural ground.
Boundary wall with brick work in foundation upto 2-3 feet deep and upto the height of 6 feet above natural ground level all around the project premises.
The Road work with specification of subgrade, aggregate coats in two stages, premix coat and finally the seal coat.
The footpath with curve stones and soft and hard paveing materials.
Water supply from borewell through underground water tanks to plot with suitable diameter of pipes.
Sewer System will be through main holes and with suitable diameter of pipes upto S.T.P.
Drainage of strom water will be through main holes, open rain chenals, suitable diameter of pipes upto water conservation system.
Park development with green grass, hezes, tidy plants and trees.
High and low height plants with different qualities of Tree.
Electric supply with HT and LT pannels using suitable electric cables through out the project premises.
N.A.
Sewage treatment plant with mixing tank, segregation tank, clearifier tank, aeration tank and sullage disposal beds.
N.A
Underground tank with incoming water pipes and borewell field with big and small boulders and with suitable fitter media.
N.A.
N.A.
N.A.
N.A.
Water bodies with smart fountains, water irrigation work in parks, signage and boards with markings etc.
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
36332.05 m²
391074.55 ft²