Making suitable brick wall up to 1 feet height from natural ground.
Boundary wall with brick work in foundation up to 2-3 feet deep and up to height 6 feet above from natural level all around project.
The road work with specifications of subgrade, aggregate coats in two stages, premix coat and finally the seal coat.
The footpath with karb stones soft and hard paving materials.
Sewer system will be through man holes and with suitable diameter of pipes up to STP
Sewer system will be through man holes, open rain channels, suitable diameter of pipes up to water conservation system.
Drainage of strom water will be through man holes, open rain channels suitable diameter of pipes up to water conservation systems
Development of Parks with green, hazes tidy plants and trees.
High and Low height plants with different qualities of Tree.
Electric supply with HT and LT Panels using suitable electric cables through the project premises.
N.A.
Sewage Treatment plant with mixing tank, segregation tank, clarifier tank, aeration tank and sullage disposal beds.
N.A.
Underground tank will with incoming water pipes and borewell field with big and small boulders and with suitable media.
N.A.
N.A.
N.A.
N.A.
Water bodies with smart fountains, water irrigation work in parks, signage and board with marking, etc.
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
87799.99 m²
945070.31 ft²