Demarcation of plots will be done as per approved layout. The total number of Plots are 26 nos.
The boundary wall is in 3 Mt. high that built in 230 mm thick brick wall in first class brick work in a ratio 1;6 mix, with providing column in every 4 Mt. , expansion joint and beam for high durability damp proof course layer will also laid, for moisyure resistand purpose.
Internal road is 24 Mt. ,9Mt. and 7.50 Mt. wide. All roads are ACC with Proper compaction, 8inch boulder will be use, ready mixed concrete will be used which is manufactured in fully automatic batching plant and designed upto 100 MT load capacity.
A 1.5 m wide footpath runs all along the fence outside a park , foothpaths provide an excellent opportunity for exercise as well as movement. foothpaths can be use as decorative cycle paths, running paths, and many other, as such these foothpaths need to be designed with access in mind. the must also be durable, safe and easy to maintain.
Water supply will be provided by the developer through over head water tank, All water supply pipes elbows, tee, socket etc will be of uniq make ISI marked.
STP (sewerage treatment plant) is proposed by developer of 95 KLD of MBBR technology with clog pump, irrigation pump etc.
providing and laying cast in site RCC drain, storm water lines will be provided by the developers along with roads. All drain pipes and rain water pipes to be make 6kg pressure pipes ISI marked and all PVC fitting to be of ISI marked. gully traps and main hole as per detail drawing.
Parks are the gathering for the entire neighborhood. As a result, more people spend their time in the park. cut grass, and manicured tree give attention to the people,while childrens play area is also provided in the park, where all the childrens of the society will enjoy and play outdoor games. it also includes picnic tables, benches, walkways, recreational trails, shade structures and lighting.
Tree planting is cost-effective , thus making it simpler to achieve the goal of making the earth a safer place by making it free from pollution , the effects of climate change can also be controlled by increasing the rate of tree plantation.
Street lightning lines will be laid along the road, The distance between street lightning will be 15 to 20 Mts. Electrical sub Station will also proposed by developers. wires, switch socket crabtree or archor rom make, MCB-ISI make, conduit; ISI marked, D.B box ISI marked, gang box, fan box, light box etc. as per norms
NA
STP system proposed by the developer for treatment and disposal system of sewage and sullage water. Sewer lines are around 150-300 mm.
Solid waste management and disposal system will be done by the developers. All Drain pipes and rain water pipes to be make 6kg pressure ISI marked and all PVC fitting to be of ISI marked. gully traps and main hole as per detail drawing
Rain water harvesting tank will be constructed by the developer.it is used to transport the harvested water from the catchment to the recharge zone. it improves the quality and quantity of ground water. it also reduces soil erosion , strom water run off, flooding, and pollution of surface water with fertilizers,pesticides, metals and other sediments.
NA
NA
NA
NA
NA
Showing 1 blocks with 2 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
46159.36 m²
496854.74 ft²