Have queries on this Project?
28.874291
78.764800
Showing 1 blocks with 2 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
22124.83 m²
238149.46 ft²
Demarcation of plots will be done as per layout. The total numbers of plots 29 NOS.
The boundary wall is in 3 Mt. high that is built on 230 mm thick brick wall is first class brick work is a ratio of 1;6 mix, with providing column is every 4 Mt., Expansion joint and beam for high durability damp proof course layer will also laid for moisture resistant purpose.
Internal road is 12 Mt., 9Mt. and 7.50 Mt. wide . All Road are RCC with proper compaction 8 inch boulder will be use, Ready mixed concrete will be used which is manufactured is fully automatic batching plant and designed upto 100 MT load capacity.
A 1.5 m wide footpath runs all along the fence outside a park, foothpath provide an excellent opportunity for exercise as well an movement. Fothpath can be used as decorative cycle paths, running paths and many others. As such these foothpath need to be designed with access in mind. They must also be durable safe and easy to maintain.
Water supply will be provided by the developer through overhead wate tank. All water supply pipes elbows, tee, socket etc. Will be of uniq make ISI marked.
STP 25 KLD Capacity ( Sewerage Treatment plant ) is proposed by developer with MBBR technology with clog pump, irrigation pump etc.
Providing and laying cast in site RCC drain , storm water lines will be provided by the developers along with roads. All drain pipes and rain water pipes to be make 6kg pressure pipe ISI marked and all PVC fitting to be of ISI marked. Gully Traps and main as per detail drawing.
Park are the gathering spaces for the entire neighborhood. As a result more pepole spend their time in the park. Cutgrass and manicured trees give attention the pepole. Whilechildrens play area is also provided in the park. Whare all the children are of the society will enjoy and play outdoor games. It also includes picnic tables, benches, walkways, recreational trails, shade structures and lighting.
Plantation will be done by the developers as per layout. Tree planting is cost- effective, thus making it simpler to achieve the goel of making the earth a safer place by making it free from pollution. The effects of climate change can also be controlled by increading the rate of tree plantation.
Street lightning lines will be laid along the road. The distance between street lightning will be 15 to 20 Mts. Electrical substation will also proposed by developers. Three (3) Trasnformers of 250 KVA Capacity each shall be provide. Wires, Switch socket crabtree or anchor roma make, MCB-ISI make, Conduilt ISI marked. D.B Box ISI marked, Gang box, Fan box, Light box etc. As per ISI norms.
NA
STP system proposed by the developers for treatment and disposal system of sewage and sullage water. Sewer lines are around 15-300 mm.
Solid waste management and disposal system will be done by the developers. All drain pipes and rain water pipes to be make 6kg pressure pipe ISI marked. All PVC fitting to be of ISI marked. Gully traps and main hole as per detail drwaing.
Rain water harvesting tank will be constructed by the developer. It is used to transport the harvested water from the catchment to the recharge zone. It improves the quality and quantity of ground water. It also reduces soil erosion, stromwater runoff, flooding and pollution of surface water with fertilizers, pesticides, metals and other sediments. It maintain is very important to maintain water level.
NA
NA
NA
NA
To be done as per approved layout