Demarcation of plots will be done as per approved layout. The total numbers of plots 46 NOS.
The boundary wall is in 3Mt. high that build is 230mm thick brick wall in first class brick work in a ratio of 1;6 mix, with providing column in every 4 Mt. expansion joint and beam for high durability damp proof course layer will also laid, for moisture resistant purpose.
Internal road is 24 mt. 12mt. , 9mt. and 7.50mt. wide . All roads are RCC with proper compaction 8inch boulder will be use, ready mixed concrete will be used which in manufactured in fully automatic batching plant and designed upto 100mt load capacity.
A 1.5m wide foothpath runs all along the fence outside a park, foothpath provide an excellent opportunity for exercise as well as movement. foothpath can be used as decorative cycle paths, running paths, and many others. As such these foothpath need to be designed with access in mind. They must also be durable,safe and esay to maintain.
Water supply will be provided by the developer through overhead water tank. All water supply pipes elbows, tee, socket etc. will be of Uniq make ISI marked.
STP ( Sewerage Treatment Plant ) is proposed by developer with MBBR technology with clog pump, irrigation pump etc.
Providing and laying cast in site RCC drain, Storm water lines will be provided by the developer along with roads. All drain pipe and rain water pipes to be make 6kg pressure pipe ISI marked and all PVC fitting to be of ISI marked. gully traps and main hole as per Detail Drawing.
Parks are the gathering spcaes for the entire neighborhood. As a result more people spend their time in the park. cutgrass and manicured trees give attention to the people. While childrens play area is also provided in the park where all the childrens are of the society will enjoy and play outdoor games. it also included picnic tables, benches, walkways, recreational trails, shade structures and lighting.
Plantation will be done by the developer as per layout.Tree planting is cost-effective, thus making it simpler to achieve the goal of making the earth a safer place by making it free from pollution. The effects of climate change can also be controlled by increasing the rate of tree Plantation.
Street lighting lines will be laid along the road, the distance between street lighting will be 15 to 20 Mts. elctrical substation will also proposed by developers. Wires , switch socket crabtree or anchor roma Make, MCB- ISI Make, conduit, ISI Marked, D.B box ISI Marked ,Gang Box, Fan Box, Light Box Etc. AS per ISI Norms.
NA
STP system proposed by the developer for treatment and disposal system of sewage and sullage water. Sewer Lines are around 150-300mm.
Solid waste management and disposal system will be done by the developers. All drain pipes and rain water pipes to be make 6kg pressure pipes ISI marked and All PVC fitting to be of ISI marked. Gully traps and main hole as per detail drawing.
Rain water harvesting tank will be constructed by the developer. It is used to transport the harvested water from the catchment to the recharge zone. it improves the quality and quantity of ground water. it also reduces soil erosion , strom water run off , flooding and pollution of surface water with fertilizers,pesticides,metals and other sediments. It maintain is very imp to maintain water level.
NA
NA
NA
NA
To be done as per approved layout.
Showing 1 blocks with 1 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
34778.00 m²
374346.91 ft²