Dermarcation of plots will be done as per approved layout. The total number of plots are 43 nos.
The boundry wall is in 3 Mt. high that is built in 230 mm thick brick wall in first class brick work in a ratio of ;1.66 mix, with providing column in every 4 Mt. , expansion koint and beam for high duraability damp proof course layer will aslo laid, for moisture resistant purpose.
Internal road is 24 Mt. ,9Mt.and 7.50Mt. wide. All roads are RCC with Proper compaction 8 inch boulder will be use, ready mixed concrete will be used which is manufactured in fully automatic batching plant, and designed upto100 Mt. load capacity.
A 1.5 m wide foothpath runs all along the fence outside a park, foothpaths provide an excellent opportunity for esercise as well as movement. Foothpath can be used as decorative cycle paths, running paths, and many other. As such, these foothpath need to be designed with access in mind. They must also be durable, safe and easy to maintain.
Water supply will be provided by the developer through overhead water tank. All water supply pipes elbows, tee, socket etc. will be of uniq make ISI marked.
STP(sewerage tratment plant) is proposed by developer of 95 KLD of MBBR technology with clog pump, irrigation pump etc.
Providing and laying cast in site RCC drain, strom water lines will be provided by the developers along with roads. All Drain pipes rain water pipes to be make 6kg pressure pipe ISI makred and All PVC fitting to be of ISI makred. Gully Traps and main hole as per details drawing.
Parks are the gathering spaces for the entire neighborhood. As a result, More people spend their time in the park. Cut grass and manicured trees give attention to the people, While childrens play area is also provided in the park, where all the children are of the society will enjoy and play outdoor games. It also includes pienic tables, benches, walkways, recreational trails, shade structures and lighting.
Plantation will be done by the developer as per layout. Tree planting is cost-effective, thus making it simpler to achieve the goal of making the earth a safer place by making it free from pollution. The effects of climate changes can also be controlled by increasing the rate of tree plantation.
Stret lighting lines will be laid along the road, the distance between street lightning will be 15 to 20 mts. Electrical substation will also proposed by developers. Wires, Switch socket Crabtree or Anchor Rema make, MCB-ISI make, Conduit- ISI maked, D.B Box ISI marked, Gang Box, Fan Box, light Box as per ISI norms.
NA
STP system proposed by the developer for treatment and disposal system of sewage and sullage water. Sewer Lines are around 150-300 mm.
Solid waste management and disposal system will be done by the developers. All drain pipes and Rain water to be make 6kg pressure ISI marked and All PVC fitting to be of ISI Makred. Gully Traps and Main hole as per details drawing.
Rain water harvesting tank will be constructed by the developer. It is used to transport the harvested water from the catchment to the recharge zone. It improves the quality and quantity of ground water. It also reduces soil erosion, Strom water runoff, Flooding, and Pollution of surface water with fertilizers, Pesticides, Metals and other sediments. It Maintain is very imp to maintain water level.
NA
NA
NA
NA
To be done as per approved layout.
Showing 1 blocks with 2 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
39990.91 m²
430458.16 ft²