Demarcation of plots will be done as per approved layout. The Total number of plots are 38 nos.
The boundary wall is in 3 Mt. high that is buil in 230 mm thick brick wall in first class brick work in a ratio of 1"6 mix, with providing column in every 4 Mt., expansion joint and Beam for high durability damp proof course layer will also laid, for moisture resistant purpose.
Internal road 24 mt., 9mt. and 7.50mt wide. All roads are RCC with prpper compaction 8 inch Boulder will be use, ready mixed concrete will be used which is manufactured in full automatic batching plant, and designed upto 100 MT load capacity.
A 1.5 wide footpath runs all along the fence outside a park, footpaths provide an excellent opportunity for exercise as well as movement. Footpaths can be used as decorative cycle paths, running paths, and many others. As such, these footpaths need to be designed with access in mind? They must also be durable, safe and easy to maintain.
Water supply will be provided by the developer through overhead water tank; ALl water supply pipes elbows, Tee socket etc. wil be uniq make ISI marked.
STP ( Sewerage Treatment Plant) is proposed by developer of 95 KLD of MBBR technology with clog pump, irrigation pump etc.
Porviding and laying cast in site RCC drain, strom water lines will be provided by the developer; salong with roads. All Drain Pipes and Rain water pipes to be make 6kg pressure piep ISI markes and all PVC fitting to be of ISI marked. Gully traps and main hole as per detail drawings
Parks are the gathering spaces for the entire neighborhood. As a result, more people spend their time in the park. Cutgrass and maincurede trees give attention to the people, While childrens play area is also provided in the park, where all the children are of the society will enjoy and play outdoor games, It also includes picnic tables, benches, walkways, rereational trails, shade structures and lighting.
Plantation will be done by the developer as per layout. Tree planting is cost-effective, thus making it simpler to achieve the goal of making the earth a safer place by making it free from pollution. The effects of climate change can also be controlled by increasing the rate of tree plantation.
Street lightning lines will be laid along the road, the distance between street lightning will be 15 to 20 Mts. Electrical substation will also proposed by developers. Wires, Switch Socket Crabtree Or Anchor Roma Make, MCB- ISI Make, Conduit; ISI Marked, D.B Box ISI Marked, Gang Box, Fan Box, Light Box Etc. As per ISI norms.
NA
STP system proposed by the developer for treatment and disposal system of sewage and sullage water. Sewer lines are around 150-300 mm.
Soild waste management and disposal system will be done by the developers. All Drain Pipes and Rain Water Pipes to be make 6 kg Pressure Pipe ISI Marked and All PVC Fitting to be of ISi Marked. Gully Traps and Main Hole as per details drawing.
Rain water harvesting tank wil be constructed by the developer. It is used to transport the harvested water from the catchment to the recharge zone. It improves the quality and quantity of groundwater. It also reduces soil erosion, stromwater runoff, Flooding, and pollution of surface water with fertillizers, pesticides, metals and other sedimentgs. It maintain is very imp to maintain water level.
NA
NA
NA
NA
NA
Showing 1 blocks with 2 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
39885.00 m²
429318.15 ft²