Have queries on this Project?
26.764302
82.210376
Showing 1 blocks with 64 units
Total Carpet Area
5955.10 m²
64100.10 ft²
Total Units
153
3 different types
Blocks & Floors
1
14 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3182.42 m²
34255.25 ft²
The plot area 3182 sqm and the same will be demarcated as per the plan provided by Ayodhya development authority and survey drawing.
Well defined plot boundaries proposed to ensure the security and privacy of the project. 1.8m high boundary wall will be constructed in combination of Brickwork and RCC.
6.0M wide road is proposed around the building block. Road will be finished with 80mm thick concrete paver laid over designed layer of GSB and WMM.
NA
Water supply will be provided by the bore well and for safe and continuous water supply an underground storage and water treatment plant is proposed.
Development of a sewerage system to collect wastewater generated within the complex including treatment and disposal of wastewater or sewage. Onsite Sewage treatment plant is proposed for the same.
Development of drainage system within the site to manage surface water and storm water. This drainage system will be connected to the rainwater harvesting pits to recharge ground water.
NA
Trees of various species will be planted along the periphery of the plot. The trees will be a mix of evergreen and flowering trees.
Power supply from electricity board and street lighting as per approved building plan. The lighting will be adequate to lit up the dark spaces and all the driveways.
NA
Centralized sewage treatment plant is proposed within the project. The STP will treat all the sewage generate in the project and the recycled water will be utilized in flushing and irrigation purposes.
Collection, storage and disposal will be done as per sanction and NBC. Collection of solid waste in the segregated system will be done so that the recyclable waste can be separated in an efficient way from the wet kitchen waste.
Rainwater harvesting system is being proposed to conserve rainwater and dual flush system is proposed along with water efficient plumbing fixture.
LED lights will be used withing the project and use of solar PV plant will also be explored.
As per the fire drawings approved by fire department installation of fire protection systems and safety measures to prevent and mitigate fire hazard as specified in NBC.
NA
As per the approved building plan and fire approvals, fire staircases are being provided. All fire exit passage shall be kept clear all the time and proper as well as fire drill will be done in operation phase.
NA
Veda is located in Ayodhya.
Yes. Veda is registered under UPRERAPRJ367395/03/2025 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Veda is 23 January 2030.
Veda is developed by AURIKA DEVELOPERS LLPADVIKA BUILDTECH LLP.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.