Have queries on this Project?
29.434954
77.713702
Showing 1 blocks with 2 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
37993.00 m²
408952.85 ft²
DEMARCTAION OF PLOTS WILL BE DONE AS PER THE SANCTIONED MAP WITH PROPER SET BACKS.
BOUNDARY WALL AT SITE WILL BE MADE OF FLY ASH/CLAY BRICKS WITH COLUMN BEAM STRUCTURE, THE HEIGHT OF THE BOUNDARY WALL WILL BE 06 FEET, PLASTER WILL BE DONE ON BOTH SIDE OF THE BOUNDARY WALL AFTER THAT TWO COAT OF PAINTS WILL BE COATED.
CONCRETE/APEX ROAD WILL BE MADE AT THE SITE.THE SITE VASE OF THE ROAD WILL BE FILLED BY RED MURAM, AFTER THAT TWOL LAYER OF AGGREGATE WILL BE LAYEDTO MAKE SURE THAT THE ROAD IS UPTO THE MARK , AFTER THIS THE TOPLAYER WILL BE COLOURED , BLACK WHITE APEX ROAD WILL BE 7.5 MTR TO 12 MTR WIDE.
LAYING OF INTERLOCKING PAWERS OF 40 MM OVER WELL COMPACTED SUBGRADE WITH GSB LAYERS.
FRESH WATER SUPPLY LINE FROM UNDERGROUND TANK TO INDIVIDUAL PLOTS WITH PROPER VALVES AS PER MEP DRAWING. AND WATER SUPPLYWE HAVE A PROVISION OF BOARING. WATER SUPPLY PROVISION WILL BE PROVIDED VIA SYSTEM OF PUMPS AND PIPES.
SEWAGE TREATMENT PLANT WILL BE CONSTRUCTED AT SITE. ALL WATER DRAIN WASTE DRAINS WILL COME CONNECT IN THE SEWAGE TREATMENT PLANT . THIS WILL FILTER THE WATER THAT WILL BE USED FOR THE PLANTATION.
DRAIN WILL BE MADE BELOW THE FOOTHPATHS WITH CHAMBERS. DRAIN WILL BE MADE WITH BRICKWORK AND PCV PIPE OF DIFFERENT DIA.THE WATER WILL COME THROUGH PVC PIPE AND THIS DRAINS AND A PROPER SLOP WILL BE MENTIONED IN STP PLANT. THE WATER WILL GET COLLECTED THROUGH DRAINS IN STP PLANT.
PARKS ARE PROVIDED IN THE COLONY. THESE PARKS CAN BE USED AS CHILDRENS PLAY AREA, JOGGING, SITOUT SPACE ETC.
TREE WILL BE PLANTED AROUND 400 IN NUMBER ALL OVER THE PROJECT AND IN THE GARDEN AS WELL
IRON POLES WITH STREET LIGHT WILL BE PLACED ALL OVERTHE PROJECT AND PROPER ELECTRIFICATION WITH TRANSFORMER AND WIRINGWILL BE DONE AS SHOWN IN THE LAYOUT. ELECTRIFICATION WILL BE DONE IN ALL PLOTS ALSO WITH ISI MARKS WIRES, MODULAR SWITCHESWITH PROPER EARTHING ARRANGMENTS.
NA
TREATMENT AND SIPOSAL SYSTEM OF SEWAGE AND SULLAGE WATER WILL BE PROVIDED BY CONSTRUCTING STP PLANT. IN THIS ALL WATER WILL BE COLLECTED FROM DIFFRENT SOURCES WILL BE COLLECTED AT ON PLACE AND RECYCLE THE SAME AND WILL BE USED FOR OTHER WORK LIKE GARDING, WASHING THE COMMON AREA AS ETC.
DESIGNATED AREA FOR COLLECTIONAND LOADING OF GARBAGE WITH DUSTBINS HAS BEEN PROVIDED.
INSTALLATIN OF RAIN WATER HARVESTING SYSTEM FOR PERCOLATIN OF RAINWATER TO MAINTAIN THE LOCAL GROUND WATER LEVELS AS PER APPROVED NORMS AND MEP DRAWINGS.
NA
NA
PROVIDING TODDLERS PARK, CHILDREN PLAY STATION, SIT OUT AREA , LUSH GREEN GARDEN.
NA
NA