Have queries on this Project?
29.438039
77.712192
Showing 1 blocks with 5 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
53335.00 m²
574092.61 ft²
DEMARCATION OF PLOTS WILL BE DONE AS PER THE SANCTION MAP BY MUZZAFFARNAGAR DEVELOPMENT AUTHORITY
BOUNDARY WALL AT SITE BE MADE OF FLY ASH/CLAY BRICKS WITH COULUMN BEAMS STRUCTURE, THE HRIGHT OF THE BOUNDARY WALL WILL BE 6 FEET, PLASTER WILL BE DONE ONBOTH SIDE OF THE BOUNDARY WALL AFTER THAT 2 COAT OF PAINTS WILL BE COATED.
CONCRETE /APEX ROAD WILL BE MADE AT THE SITE, THE VASTE OF THE ROAD WILL BE FILLED BY RED MURAM, AFTER THAT 2LAYER OF AGGREEGATE WILL BE LAYED TO MAKE SURE THAT THE ROAD IS UPTO THE MARK, AFTER THIS THE TOP LAYER WILL BE COLOURED , BLACK AND WHITE APEX ROAD WILL BE 7.5 MTR TO 12 MTR WIDE.
LAYING OF INTERLOCKING PAVERS OF 40MM OVER WI=ELL COMPACTED SUBGRATE WITH GSB LAYERS.
FOR WATER SUPPLY WE HAVE A PROVISION OF BOARING WATER SUPPLY PROVISION WILL BE PROVIDEDV VIA SYSTEM OF PUMPS AND PIPES , WATER WILL GET STORED IN UNDERGROUND TANKS FROM THERE WILL GET SUPPLIED TO INDIVIDUAL UNITS PERSONAL TANKS. THIS WATER WILL BE USED FOR DRINKING AND DAILY USE PURPOSE.
SEWAGE TREATMENT PLANT WILL BECONSTRUCTION AT SITE. ALL WATER DRAIN WATSTE DRAINS WILLCOME CONNECT IN THE SEWAGE TREATMENT PLANT. THIS WILL FILTER THE WATER THAT WILL BE USED FOR THE PLANTATION.
LAYING OF DWC PIPES AND MAKING OF CATCH BASINSOF REQUIRED SIZE EG(450x450mm) IN BRICK MASSONERY WITH MANHOLES COVERS AS PER MEP DESIGNS.
LANDSCAPING OF THE PARKS WITH PLANTATION INCLUDING TREES, SHRUBS AND GROUND COVERS AND RECREATIONAL AREAS WITH BENCHES, WALKWAYS ETC.
PLANTATION OF VARIOUS TYPES OF TREES AS PER LANDSCAPE CONSULTANT DRAWINGS EG (CHAMPA, DATA PALM ETC), TREE WILL BE PLANTED AROUNF400 IN NUMBERS ALL OVER THE PROJECT AND IN THE GARDEN AS WELL.
IRON POLS WITH STREE LIGHT WILL BE PLACEDALL OVER THE CAMPUS AND PROPER ELECTRIFICATION WITH TRANSFORMER AND WIRING WILL BE DONE AS SHOWNIN THE LAYOUT , ELECTRIFICATION WILL BE DONE IN ALL DUPLEXES ALSO WITH ISI MARKS, MODULAR SWITCHES WITH PROPER EARTHING ARRANGEMENT.
NA
TREATMENT AND DISPOSAL SYATEM SEWAGE AND SULLAGE WATER WILL BE PROVIDED BY CONSTRUCTING STP PLANT, IN THOS ALL WATER WILL BE COLLECTED FROM FIFFRENT SOURCES (KITCHEN WATER, BATHROOM WATER USE FOR WASHING CLOTHES ETC) WILL BE COLLECTED AT ONE PLACE AND RECYCLE THE SAME AND WILLBE USED FOR OTHER WORKS LIKE GARDENING, WASHING THE COMMON ARE ETC.
DESIGNATED AREA FOR COLLECTION AND LOADING OF GARBAGE WITH DUSTBINS HAS BEEN PROVIDED.
INSTALLATION OF RAIN HARVESTING SYSTEM FOR PERCOLATION OF RAINWATERTO MAINTAIN THE LOCAL GROUNF WATER LEVELS AS PER APPROVED NORMS AND MEP DRAWINGS.
NA
NA
PROVIDING TODDLERS PARK, CHILDREN PLAY STATION, SIT OUT AREA , LUSH GREEN GARDEN.
NA
NA