Launch Date
Completion Date
RERA ID
77.42.31
29.26.39
Demarcation of plot has been done.
Entire boundary wall has been completed. Boundary wall is 10 feet height.
GSB work on entire roads has been done.
-
complete pipe line has been laid for water supplay.
Pipe line work has been laid for sewer system, one fifth of work completed .
131.72 drain work has been completed.
All park work development has been completed .
125 plants of difference types has been completed.
Electric poll fixed and wiring has been done.
Club building has been completed .
STP work one fifth of total work has been completed.
-
Rain water harvesting work has been done.
-
-
-
-
-
Showing 1 blocks with 2 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
16754.00 m²
180338.38 ft²