DEMARCATIONS OF PLOTS WILL BE DONE BY BRICKS AND BY STEEL WIRE AS PER THE REQUIREMENT OF BUYER
BOUNDRY WALL WILL BE CONSTRUCTED BY USING BRICKS WALL WHICH WILL TAKES 3-4 MONTH TO COMPLETE
ROAD CONSTRUCTION WILL BE DONE BY LAYING OF C.C. INTERLOCKING TILES WHICH MAY TAKE APPROX 5-6 MONTH TO COMPLETE
FOOTHPATH WORKS COMPLETES SIDE BY SIDE THE ROAD CONSTRUCTION WORK BY USING INTERLOCKING TILES OF RED COLOUR
TUBEWELL WILL BE CONSTRUCTED (PLINTH AREA RATE 5.4.2) . IT MAY TAKE 1-2 MONTH TO COMPLETE
SEWER LINE WORK WILL BE STARTED BEFORE ROAD CONSTRUCTION WORK .
COMPLETE DRAIN PLAN LAYOUT IS READY AND IT WILL BE CONSTRUCTED SIDE BY SIDE BY OTHER WORK.LAYOUT UPLOADED
NUMBER OF PARK -01
tikona plant and EUCALYPTUS PLANT WILL BE PLANTED AT BOUNDRY WALL OF THE PROJECT WHICH MAY TAKE 2-3 MONTH TO COMPLETE
Road side pole light and We will also establish underground supply of electricity and it may take 1 year to complete as it depends upon completion of other work too
NA (ONLY PLOT DEVELOPEMENT)
NA
NA (ONLY PLOT DEVELOPEMENT)
NA
NA
NA
NA
NA
REPAIR AND MAINTENANCE WORK (ROUTINE WEAR AND TEAR) MAINTENANCE OF RAOD PARKS ETC
Showing 1 blocks with 3 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
7683.41 m²
82703.46 ft²