RERA Received Date
Completion Date
RERA ID
25.212669
82.585869
We have one plot of size 2315.91 sq. mtr.having 1 main entrance gate from the 18 m wide front road.
1.8 m high and 115/230 mm thick Brick work and rcc work in column and beam.
From the main entrance gate we have RCC road/ interlocking pavers through out the project.
We would not provide any footpath
We will provide Two nos. boaring for the requirement of blocks
Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.when come into force.
Storm water from Roads and other area shall be connect to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.
N/A
We will provide few trees along the project.
We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, and DG for common service like External lighting, STP, Pump room etc.
N/A
Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force.
There are a proper garbage collection area provided for the solid waste management.
We will suggest to individual to use low flow fixtures and raw water harvesting system to reduce the water consumption and improve the ground water level.
We will use LED lights fitting in external area. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.
We will provide Fire Fighting facility in common areas.
N/A
We will have staircases for emergency rescue
N/A
Showing 1 blocks with 28 units
Total Carpet Area
4371.83 m²
47057.94 ft²
Total Units
41
4 different types
Blocks & Floors
1
8 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
2500.00 m²
26909.75 ft²