Total Units
60
2 unit types
Carpet Area
60,941 ft²
5,661.57 m² · carpet only, excludes balcony
Blocks & Floors
1
11 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 1,016 ft² (94.36 m²)Balconies 97Parking per unit 0.003 of 62 rows list no units (3 floors are empty), so they add nothing to these totals
All blocks
Showing 50 of 62 rows · 7 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit | Balconies | Balcony Areatotal |
|---|---|---|---|---|---|---|
| 1 | BSMNT | OTHER | — | — | — | — |
| 1 | BSMNT2 | OTHER | — | — | — | — |
| 1 | BSMNT3 | OTHER | — | — | — | — |
| 1 | 1 | 3 BHK | 1 | 1,051 ft²97.67 m² | 1 | 196 ft²18.20 m² |
| 1 | 2 | 3 BHK | 1 | 963 ft²89.51 m² | 3 | 103 ft²9.62 m² |
| 1 | 2 | 3 BHK | 1 | 1,037 ft²96.33 m² | 2 | 170 ft²15.76 m² |
| 1 | 2 | 3 BHK | 1 | 1,251 ft²116.25 m² | 2 | 177 ft²16.48 m² |
| 1 | 2 | 3 BHK | 1 | 1,266 ft²117.59 m² | 2 | 198 ft²18.40 m² |
| 1 | 3 | 3 BHK | 1 | 963 ft²89.51 m² | 3 | 103 ft²9.62 m² |
| 1 | 3 | 3 BHK | 1 | 1,051 ft²97.62 m² | 1 | 47 ft²4.32 m² |
| 1 | 3 | 3 BHK | 1 | 1,037 ft²96.33 m² | 2 | 170 ft²15.76 m² |
| 1 | 3 | 3 BHK | 1 | 1,279 ft²118.83 m² | 2 | 177 ft²16.48 m² |
| 1 | 4 | 3 BHK | 1 | 963 ft²89.51 m² | 3 | 103 ft²9.62 m² |
| 1 | 4 | 3 BHK | 1 | 1,051 ft²97.62 m² | 1 | 47 ft²4.32 m² |
| 1 | 4 | 3 BHK | 1 | 1,037 ft²96.33 m² | 2 | 170 ft²15.76 m² |
| 1 | 4 | 3 BHK | 1 | 1,279 ft²118.83 m² | 2 | 177 ft²16.48 m² |
| 1 | 4 | 3 BHK | 1 | 1,266 ft²117.59 m² | 2 | 198 ft²18.40 m² |
| 1 | 5 | 3 BHK | 1 | 963 ft²89.51 m² | 3 | 103 ft²9.62 m² |
| 1 | 5 | 3 BHK | 1 | 1,051 ft²97.62 m² | 1 | 47 ft²4.32 m² |
| 1 | 5 | 3 BHK | 1 | 1,037 ft²96.33 m² | 2 | 170 ft²15.76 m² |
| 1 | 5 | 3 BHK | 1 | 1,266 ft²117.59 m² | 2 | 198 ft²18.40 m² |
| 1 | 6 | 3 BHK | 1 | 963 ft²89.51 m² | 3 | 103 ft²9.62 m² |
| 1 | 6 | 3 BHK | 1 | 1,051 ft²97.62 m² | 1 | 47 ft²4.32 m² |
| 1 | 6 | 3 BHK | 1 | 1,037 ft²96.33 m² | 2 | 170 ft²15.76 m² |
| 1 | 6 | 3 BHK | 1 | 1,266 ft²117.59 m² | 2 | 198 ft²18.40 m² |
| 1 | 7 | 3 BHK | 1 | 963 ft²89.51 m² | 3 | 103 ft²9.62 m² |
| 1 | 7 | 3 BHK | 1 | 1,037 ft²96.33 m² | 2 | 170 ft²15.76 m² |
| 1 | 7 | 3 BHK | 1 | 1,279 ft²118.83 m² | 2 | 177 ft²16.48 m² |
| 1 | 7 | 3 BHK | 1 | 1,266 ft²117.59 m² | 2 | 198 ft²18.40 m² |
| 1 | 7 | 3 BHK | 1 | 1,051 ft²97.62 m² | 1 | 47 ft²4.32 m² |
| 1 | 8 | 3 BHK | 1 | 963 ft²89.51 m² | 3 | 103 ft²9.62 m² |
| 1 | 8 | 3 BHK | 1 | 1,051 ft²97.62 m² | 1 | 47 ft²4.32 m² |
| 1 | 8 | 3 BHK | 1 | 1,037 ft²96.33 m² | 2 | 170 ft²15.76 m² |
| 1 | 8 | 3 BHK | 1 | 1,279 ft²118.83 m² | 2 | 177 ft²16.48 m² |
| 1 | 8 | 3 BHK | 1 | 1,266 ft²117.59 m² | 2 | 198 ft²18.40 m² |
| 1 | 9 | 3 BHK | 1 | 963 ft²89.51 m² | 3 | 103 ft²9.62 m² |
| 1 | 9 | 3 BHK | 1 | 1,051 ft²97.62 m² | 1 | 47 ft²4.32 m² |
| 1 | 9 | 3 BHK | 1 | 1,037 ft²96.33 m² | 2 | 170 ft²15.76 m² |
| 1 | 9 | 3 BHK | 1 | 1,279 ft²118.83 m² | 2 | 177 ft²16.48 m² |
| 1 | 9 | 3 BHK | 1 | 1,266 ft²117.59 m² | 2 | 198 ft²18.40 m² |
| 1 | 10 | 3 BHK | 1 | 963 ft²89.51 m² | 3 | 103 ft²9.62 m² |
| 1 | 10 | 3 BHK | 1 | 1,051 ft²97.62 m² | 1 | 47 ft²4.32 m² |
| 1 | 10 | 3 BHK | 1 | 1,037 ft²96.33 m² | 2 | 170 ft²15.76 m² |
| 1 | 10 | 3 BHK | 1 | 1,279 ft²118.83 m² | 2 | 177 ft²16.48 m² |
| 1 | 10 | 3 BHK | 1 | 1,266 ft²117.59 m² | 2 | 198 ft²18.40 m² |
| 1 | GF | SHOP | 1 | 360 ft²33.40 m² | — | — |
| 1 | GF | SHOP | 1 | 360 ft²33.40 m² | — | — |
| 1 | GF | SHOP | 1 | 359 ft²33.36 m² | — | — |
| 1 | GF | SHOP | 1 | 1,200 ft²111.50 m² | — | — |
| 1 | GF | SHOP | 1 | 293 ft²27.20 m² | — | — |
Total Plot Area
0.673 acres
2,722.88 m² · plot area
Plot line demarcarted
2.1m. Heigh boundary wall composed of 230mm thick brickwork and RCC columns @ 4.0m. C/c along with plinth beam. The wall to be finished with plaster & paint.main gate//guard room/entry checking
Concrete road
1.5m. Wide footpath with interlocking pavers along driveway & in green areas as/landscape design.
Source of water would be bore well water after. Water will be first stored in overhead tank and fed to individual units thru gravity system.
Sewage to be collected thru drains & will disposed in municipal sevar line.
Proper drainage system planned for both sewage & storm. Storm water is connected to rain water harvesting pits. All drainage below gravity lvl. Would be connected & drained into a sump & then pumped into the storm drain.
To be develop as applicable.
Adequate no. Of plantation in the form of trees, shrubs, plants will be provided.
We have design the system as per local electricity board and consider centralized Transformer , panel Feeder pillar and DG back for common service like external lighting , pump room comman passage etc.
Not applicable.
Centalized sewerage system shall be provided . All sewerage water should be collected through drain & will connect with the municiple sewerage system.
As per requirement.
Proper sanitary fixtures with ISI mark and rated for water saving to be used. Rain water harvesting pits to be used for ground water recharge.
We will use LED lights fitting in external area & all the equipment shall have energy efficient motor.
All arrangements as per NBC shall be provided.
Following social infrastructure and public amenities will be provided: ? Power Back-up in common areas. ? round-the-clock security features, including CCTV surveillance systems, firefighting equipment and intercom facility
Fire evacuation plans to be installed in common areas
Not applicable.
Tridev Annapurna is located in Varanasi.
Yes. Tridev Annapurna is registered under UPRERAPRJ5636 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Tridev Annapurna is 31 March 2019.
Tridev Annapurna is developed by SIDDHEE VINAYAK INFRAHOME PRIVATE LIMITED.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.