RERA Received Date
Completion Date
RERA ID
26.528993
80.344354
The residential plots will be demarcated by bricks wall.
The project is developing in more than 91 acre of area for plots so there is no boundary wall is proposed around the project
Road as specified in the map have been made as per sanction plan
Footpath along side the road is also proposed as per sanctioned plan.
Over Head water tank is proposed for water supply including drinking water facilities.
A centralized sewage system shall be provided which will be connected to the main holes. area for sewer and drainage system have been proposed.
The storm water system shall be provided which will connected to the main drain line.
Park is proposed as per layout plan.
There is several provisions for tree planting. Tree and bushes is the part of green area as per layout plan.
We have designed the system considering centralized transformer, HT panel, LT panel, Feeder pillar and DG backup for common services like external lighting is sanctioned.
Land is propose for community building like Hospital ,schools etc.
A centralized sewerage system shall be provided which will be connected to main hole developed as per sanction plan
There is proper garbage collection area for solid waste management system.
A well designed rainwater harvesting system shall be provided.
We will use LED lights as well as solar lights in external areas.
Land is proposed for fire station.
NA
NA
NA
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
396228.00 m²
4264958.57 ft²