Launch Date
Completion Date
RERA ID
26.926072
80.966817
AS PER MAP SITE ADDRESS DEMARCATION OF PLOT NO-GH-07, WILL BE DONE SITUATION AT SECTOR-J JANKIPURAM SCHEME, LUCKNOW
230MM WIDE AND 2.1 METER BOUNDARY WALL OF RCC/ BRICK FILLED, BOUNDARY WALL AT SITE WILL BE MADE OF FLY ASH/CLAY BRICK WITH COULUMN BEAM STRUCTURE. THE HEIGHTS OF BOUNARY WALL WILL BE 6FT PLASTER WILL BE DONE ON BOTH SIDE.
CONCRETE / APEX ROAD WILL BE MADE AT THESITE . THE BASE OF ROAD WILL BE FILLED BY RED MURAM. AFTER THAT 2 LAYEROF AGGREGATE WILL BE LAYED TO MAKE SURE THAT THE ROAD IS UPTO THE MARK, AFTER THIS THE TOP LAYER WILL BE COLOURED , BLACKMWHITE SPEX ROAD WILL BE 7.5MTR TO 12 MT WIDE.
PAVER BLOCKS LAIED OVER SAND BASE, FOORTHPATH WILL BE MADE BY INTERLOCKING TYPE B CONCRETE BLOCKS PAVERS.
ALL THE DRINKING WATER SUPPLY TO BE THROUGH TERRACE TANK OF REQUIRED CAPICITY, FOR WATER SUPPLY WE HAVE A PROVISION OF BOARING WATER, WATER SUPPLY PROVISION WILL BE PROVIDED VIA SYSTEM OF PUMPS AND PIPES, WATER WILL GET STORED IN UNDERGROUND TANKS FROM THERE WILL GET SUPPLIED TO INDIVIDUAL UNITS PERSONAL TANKS.
A WELL LAID SEWER SYSTEM CONNECTED TO EXTERNAL SEWER SYSTEM IS PROPOSED. WILL BE CONSTRUCTED AT SITE, ALL WATER DRAIN WASTE DRAINS WILL COME CONNECT IN THE SEWAGE TREATMENTS PLANTS.THIS WILL FILTER THE WATER THAT WILL BE USED FOR THE PLANTATION
DRAINS HAVING A MINIMUM WIDTH OF 150MM WILL BE PROVIDEDFOR COLLECTION AND CHANNELIZATION OF RAIN WATER (SURFACE RUNN OFF)
INTERNAL PARK WILL BE PROVIDED. THE PARKS WILL HAVE PLAY EQUIPMENTS AND SITTING BENCHES ETC.
THE TREE WILL BE PLANTED AT ALL SUITABLE LOCATIONS OF THE PROJECTAND ALONG THE BPUNDARY WALLS.
ELETRIC SUPPLY PROVIDED THROUGH INDIVIDUALLY TRANSFORMERS AND BY DG SET SUPPLYFOR BACKUP.
NA
SEWAGE SHALL BE TREATED IN SEWAGE TREATMENTS PLANT (STP) AND THEREAFTERTREATMENTS WATER TO BEUSED FOR IRRIGINATION.
SHALL BE COLLECTED AT ONE SPECIFIC POINT, FINAL DISPOSAL WILL BE TIED UP WITH AREA NAGAR NIGAM TEAM.
RAIN WATER HARVESTING PITS SHALL BE PROVIDED FOR GROUNDWATER RECHARGING AND OVER FLOW TO BE DISCHARGEDIN THE MUNICIPLA DRAINS.
25 PERCENT OF THE STREET LIGHTS SHALL HAVE SOLAR ENERGY BACKUP.
AS PER FIRE DRAWING APPROVED BY FIRE DEPARTMENTS WITH FULFILLMENTS OF ALL THE FIRE NORMS.
NA
FIRE STAIRCASE SHALL BE PROVIDED AS PER THE APPROVED FIRE DRAWING FOR EVACUATIONTO OPEN AREAS.
NA
Showing 1 blocks with 35 units
Total Carpet Area
6968.34 m²
75006.51 ft²
Total Units
78
3 different types
Blocks & Floors
1
13 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3306.41 m²
35589.87 ft²