Total Units
21
1 unit type
Carpet Area
20,425 ft²
1,897.50 m² · carpet only, excludes balcony
Blocks & Floors
1
3 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 973 ft² (90.36 m²)Balconies 0Parking per unit 0.00
All blocks
Showing 21 of 21 rows · 5 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit |
|---|---|---|---|---|
| The Walk 1 | GF | SHOP | 1 | 960 ft²89.19 m² |
| The Walk 1 | GF | SHOP | 1 | 1,121 ft²104.10 m² |
| The Walk 1 | GF | SHOP | 1 | 1,107 ft²102.86 m² |
| The Walk 1 | GF | SHOP | 1 | 1,106 ft²102.76 m² |
| The Walk 1 | GF | SHOP | 1 | 1,106 ft²102.76 m² |
| The Walk 1 | GF | SHOP | 1 | 1,117 ft²103.78 m² |
| The Walk 1 | GF | SHOP | 1 | 1,070 ft²99.38 m² |
| The Walk 1 | 1 | SHOP | 1 | 1,519 ft²141.11 m² |
| The Walk 1 | 1 | SHOP | 1 | 848 ft²78.81 m² |
| The Walk 1 | 1 | SHOP | 1 | 840 ft²78.06 m² |
| The Walk 1 | 1 | SHOP | 1 | 839 ft²77.97 m² |
| The Walk 1 | 1 | SHOP | 1 | 839 ft²77.97 m² |
| The Walk 1 | 1 | SHOP | 1 | 839 ft²77.91 m² |
| The Walk 1 | 1 | SHOP | 1 | 1,173 ft²108.97 m² |
| The Walk 1 | 2 | SHOP | 1 | 1,500 ft²139.34 m² |
| The Walk 1 | 2 | SHOP | 1 | 658 ft²61.12 m² |
| The Walk 1 | 2 | SHOP | 1 | 655 ft²60.82 m² |
| The Walk 1 | 2 | SHOP | 1 | 653 ft²60.66 m² |
| The Walk 1 | 2 | SHOP | 1 | 653 ft²60.66 m² |
| The Walk 1 | 2 | SHOP | 1 | 656 ft²60.92 m² |
| The Walk 1 | 2 | SHOP | 1 | 1,166 ft²108.35 m² |
Total Plot Area
0.491 acres
1,986.74 m² · plot area
There are 1 plot acrh shaped abutting 12mtr internal road from North side. Site has one entrance and one exit. Site is surrounded by other plots from East & West. Also a green area and lake is in between both plots.
2.9 m high and 230 mm thick Boundary wall designed . Brick Work of 9inches and rcc work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary.
Trimix / asphalt road will be used as per deisgn suggested by the Architect for internal road.From the main entrance gate we have road of 630 mm of different layers with 30 mm bituminous coating on top through out the project,whose wideness starts from 30 mts.
All internal roads will have narrow footpath with pavers or equivalent finishes as per landscape design. Well-designed pedestrian footpaths are provided along the project’s internal roads and site periphery to ensure safe and convenient movement. The footpaths are constructed with non-slip, durable paver blocks over a compacted base, maintaining adequate width as per local development authority norms. Proper gradient and drainage are ensured to prevent waterlogging.
The potable water supply of 20KLD of desired quality & purity shall be ensured through pressurized distribution network connceted with undergound/overhead tanks through pipes with diameter of 250-450mm. Drinking water ishall be sourced from an approved municipal connection or borewell through pipes with diameter of 250-450mm.
Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the Centralized STP of township for treatement. Proper provision of sewer lines has been provided Capacity of Centralized STP is 2250 KLD.
Storm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit/ water collection ponds for recharge the Ground water and overflow shall be connected with Municiple drain line. 10 manholes are proposed.
NA
The trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommende in the landscape in order to maintatin greenary and natural view.
All the workings shall confer to Bureau Of Indian Standards , Indian Electricity Rules & Indian Electricity Acts.To cater electrical load, 11 kV incoming power supply is presently assumed to be available from the state electricity board. A main 11 kV/ 0.440 kV Compact Substation is proposed to be installed in rear part of the premise which is “630 KVA CSS (Compact sub station). 500KVA DG set provided for power back up.
NA
Centralized Sewerage system fo all plots shall be connected to STP . All Sewerage water shall go to the STP for treatment after treatement ,water shall be recycle and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system. 2250 KLD centralized STP of MBBR techonolgy is proposed.
Project shall have waste segregation area. The solid waste shall be encouraged for segregation. Dustbins shall be provided for segregated waste in the common areas within the campus and other waste shall be handed over to the government vendors for further disposal. 35 Kg solid waste managment plant is proposed for township.
A well designed rain water harvesting system/ water storage tank shall be provided for the whole complex to conserve water. 1 nos. of rain water storage ponds are proposed.
We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. Also timer controlled panels shall be used for efficient energy management.
All Fire norms shall be followed as per NBC Part 4 code and approval of fire department.
NA
Fire Staircase is provided in the each building,Dedicated assembly areas defined in the campus. Adequate signage is also provided.
NA
The Walk 1 is located in Lucknow.
Yes. The Walk 1 is registered under UPRERAPRJ158779/10/2026 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for The Walk 1 is 20 December 2026.
The Walk 1 is developed by M/S SHALIMAR LAKECITY PRIVATE LIMITED (FORMERLY M/S ANS DEVELOPERS PRIVATE LIMITED).
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.