Total Plot Area
5.53 acres
22,371.27 m² · plot area
Project consists of 85 plots
Peripherial compound wall comprising of foundation and 1.5m high masonry wall with barbed wire fencing including plastering and painting as per design.
We have road network varying from 9m to 18 m. All roads are bituminous/asphalt roads in the project. Total road area in this development phase to be ~10,600 sqm.
In this project internal footpaths will not be provided.
We will provide water tanks with adequate distribution mechanism and connection through underground pipelines. 150 mm diameter piped to be used for planning water supply across the development. Collection tanks to be of 35 KLD to be shared with other phases.
Modular Sewerage system is planned which shall be connected with the Municipal sewerage system. 150 mm diameter pipes to be used across the development. Collection tanks of 75 KLD.
Storm water drainage system will be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and overflow shall be connect with Municipal drain line. 150 mm diameter hume pipes to be used for planning drain channels across the development.
We will provide green area of ~5784 sqm with the different activities spread across the project
We will provide many type of trees with diverse fauna and various species all along the project.
We will design & implement the system as per local electricity Board (Madhyanchal Vidyut Vitran Nigam Ltd.) .50 KW provisioning is being done across the development.
NA
A modular sewerage system connected to the municipal network is proposed. A 130 KLD STP is planned for the combined Sarayu 4, 5, and 6 development.
There is adequate garbage collection area provided for the solid waste management. Garbage collection area of ~45 sqm planned.
We shall provide rain water harvesting system for water conservation and improve the ground water level.
NA
NA
NA
NA
As per approved maps
The Sarayu 6 is located in Ayodhya.
Yes. The Sarayu 6 is registered under UPRERAPRJ458045/09/2026 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for The Sarayu 6 is 31 December 2030.
The Sarayu 6 is developed by HOABL REALTECH PRIVATE LIMITED.