Launch Date
Completion Date
RERA ID
26.772
82.2482
Project consists of 86 plots
Peripherial compound wall comprising of foundation and masonry wall including plastering and painting as per design.
We have road netwrok varying from 7.5m to 9 m.
No footpath is proposed in this development.
We will provide water tanks with adequate distribution mechanism and connection through underground pipelines.
Modular Sewerage system is planned which shall be connected with the Municipal sewerage system.
Storm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and overflow shall be connect with Municipal drain line.
We will provide green area with the different activities spread across more 8000 sq.m
We will provide many type of trees with diverse fauna and various species all along the project.
We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar etc
NA
Modular Sewerage system is planned which shall be connected with the Municipal sewerage system.
There is adequate garbage collection area provided for the solid waste management.
We shall provide rain water harvesting system for water conservation and improve the ground water level.
NA
NA
NA
NA
NA
Showing 1 blocks with 2 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
19198.00 m²
206645.35 ft²