Launch Date
Completion Date
RERA ID
25.303695
78.343149
Concrete pillars of 600 Ht at plot corners
2m Ht_RCC Columns and Beams with brick masonary, plastered on both faces
M30 200THK Cement Concrete Carriage way over adequate layers of 100 DLC, 100 GSB, and 600 Moorum Filing
Interlocking Pavers over compacted Moorum Filing
HDPE lines supply from Underground water tank to individual plots. HDPE pipe line of required dia to be laid underground. Diameter of HDPE pipeline 90mm and 63mm Looped Lines for water supply
Gravity flow collection of sewerage from Individual plots to STP through DWC/NP2 Hume Pipes of required dia. Capacity of STP is 122 KLD, Man holes size on top 600 mm, min depth of Manholes and ICs 450mm, max depth as per gradient 2000mm.
Surface water and rain water to be drained through site gradient and open channels as required
Adequate landscaping with Hard and Soft landscape elements
Shade Trees and flowering shrubs to be planted in all parks and open spaces
9m Street poles to be placed along road to general illumination
Mandir Community Area 94.96 Sq. Mt.
MBBR technology to treat Sewage waste in STP
Dry and wet waste collection bin for proper waste segregation to provided at suitable locations
Water Harvesting pits to be made to conserve rain/surface water. Treated water from STP to be used for gardening purpose
NA
NA
NA
NA
NA
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
34580.00 m²
372215.66 ft²