Launch Date
Completion Date
RERA ID
28.63894134
77.36969224
Covered boundary wall.
RCC wall/column and brick work as per drawings.
Cement concrete internal Road.
Interlocking pavers and stones as per drawings.
Water supply plan as per the drawings.
Main sewer line has been designed as per norms and partially lay in basement ceiling and will finally connect to STP.
Underground pipe drain with chamber.
Landscape and tree planting has been designed by as per the authority guidelines.
Landscape and tree planting has been designed by as per authority guidelines.
Designed has been done as per UP electricity board guidelines.
Community facilities area has been designed as per authority norms.
Sewer will be treated for recycling (if required) otherwise it will connect to the sewer line of authority which is already connected to central functional STP of GDA for this locality.
Door to door collection and will be disposed to the garbage point of authority.
Recycling of treated water and rain water system to be provide.
As per the sanction Plan.
System will be provided as per the fire department guidelines.
As per sanction plan.
As per the sanction plan for the fire department.
N/A
Showing 1 blocks with 270 units
Total Carpet Area
54799.80 m²
589859.57 ft²
Total Units
264
3 different types
Blocks & Floors
1
39 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
7822.00 m²
84195.23 ft²